Help System

Home
Cobra 8.4 Help System
Security
EPM Security Administrator Functions
Procedures
Send a Message to Users
Using the Help Search
Using the Help Search
  • Phrase:Returns all topics that contain the exact phrase in the search criteria. Use quotation marks around the phrase.
    Ex."system administration"
  • And:Returns all topics that contain all the words in the search criteria, in any combination. Insert a plus sign between all words in the search criteria.
    Ex.system + administration
  • Or:Returns all topics with any combination of words in the search criteria. This is the default.
    Ex.system administration
For more information:Searching Online Help
Table of Contents
Expand|Collapse
  • Cobra 8.4 Help System
    • Cobra Videos
    • Searching Online Help
    • Getting Started
      • Launching Cobra
        • Running Cobra with Command Line Parameters
        • Cobra Login Dialog Box
          • Display the Cobra Login Dialog Box
        • Change Password Dialog Box
          • Display the Change Password Dialog Box
        • Log Onto Cobra
        • Log Onto Cobra Using a Different User ID
        • Set Cobra to Always Run as an Administrator
        • Change Your Password
      • Explore Cobra
        • Cobra Explorer
          • Cobra Button
            • New File Dialog Box
              • Display the New File Dialog Box
              • Considerations When Creating Names in Cobra
            • Open File Dialog Box
              • Display the Open File Dialog Box
            • Save As Dialog Box (Projects)
              • Display the Save As Dialog Box (Projects)
            • Save As Dialog Box (Ancillary Files)
              • Display the Save As Dialog Box (Ancillary Files)
            • Manage
              • Backup Dialog Box
                • Display the Backup Dialog Box
              • Restore Dialog Box
                • Display the Restore Dialog Box
              • Change Ownership and Access Rights Dialog Box
                • Display the Change Ownership and Access Rights Dialog Box
                • Change Owner Dialog Box
                  • Display the Change Owner Dialog Box
                • Change Access Rights Dialog Box
                  • Display the Change Access Rights Dialog Box
            • Cobra Login Dialog Box
              • Display the Cobra Login Dialog Box
            • Change Password Dialog Box
              • Display the Change Password Dialog Box
            • Help
              • About Deltek Cobra Dialog Box
                • Display the About Deltek Cobra Dialog Box
            • Preferences
              • User Preferences
                • User Preferences Dialog Box
                  • Display the User Preferences Dialog Box
                  • Set the Date Format
              • Application Preferences
                • Configure the Application Settings
                • Application Preferences Dialog Box
                  • General Tab of the Application Preferences Dialog Box
                  • Project Codes Tab of the Application Preferences Dialog Box
                  • Notes Tab of the Application Preferences Dialog Box
                    • New Note Category Dialog Box
                    • Edit Note Category Dialog Box
                  • Spread Curves Tab of the Application Preferences Dialog Box
                    • Add Spread Curve Dialog Box
                  • Data Access Tab of the Application Preferences Dialog Box
                    • Process Lock
                  • Custom Hooks Tab of the Application Preferences Dialog Box
                  • Integration Tab of the Application Preferences Dialog Box
                  • Reports Tab of the Application Preferences Dialog Box
                  • Other Tab of the Application Preferences Dialog Box
            • Keyboard Shortcuts
          • Quick Access Toolbar
          • Processes Tab
            • Keyboard Shortcuts
          • Integration Tab
            • Keyboard Shortcuts
          • Reporting Tab
            • Keyboard Shortcuts
          • Tools Tab
            • Keyboard Shortcuts
          • Custom Menu Tab
            • Custom Menu Items
          • Cobra Views
            • Display the Cobra Explorer Panes
            • Projects
              • Projects Pane
                • Projects Pane Column Definitions
                • Shortcut Menu
                • Color Band
            • Calendars
              • Calendars Pane
                • Calendars Pane Column Definitions
                • Shortcut Menu
            • Codes
              • Codes Pane
                • Codes Pane Column Definitions
                • Shortcut Menu
            • Rates
              • Rates Pane
                • Rates Pane Column Definitions
                • Shortcut Menu
            • Resources
              • Resources Pane
                • Resources Pane Column Definitions
                • Shortcut Menu
            • Reports
              • All Reports Pane
              • Personal Reports Pane
                • Reports Pane Column Definitions
                • Shortcut Menu
              • Batch Reports Pane
                • Batch Reports Pane Column Definitions
                • Shortcut Menu
          • Keyboard Shortcuts
      • File Management
        • File Backup
          • Back Up Your Data
          • Backup Dialog Box
            • Display the Backup Dialog Box
        • File Restore
          • Restore Data from a Backup File
          • Restore Dialog Box
            • Display the Restore Dialog Box
          • Select Files to Restore Dialog Box
            • Display the Select Files to Restore Dialog Box
        • Restoring Reports and Configurations
        • Custom Project Tables
          • Identify a Custom Table
      • Process Cycle
        • Cobra Components
        • Organize Project Information
        • Set Up Projects and Project Baselines
        • Progressing
        • Reporting
        • Special-Purpose Operations
        • Take your Implementation a Step Further
      • Earned Value Management
        • DOD's Characteristics of a Successful EVMS
        • ANSI Standard for Earned Value Management Systems
    • Projects
      • Control Accounts and Work Packages
      • Classes and Cost Sets
      • Progress Techniques
      • Resource Assignments
      • Milestones/Steps
      • Notes
      • Project View
        • Display the Project View
        • Copy and Paste in the Project View
        • Edit Tab of the Project View
        • Spreadsheet Pane of the Project View
          • Shortcut Menu
          • Spreadsheet Pane Column Definitions
          • Filters
            • Standard Filter Dialog Box
              • Display the Standard Filter Dialog Box
            • Advanced Filter Dialog Box
              • Display the Advanced Filter Dialog Box
            • Procedures
              • Apply a Filter to a Column in the Spreadsheet Pane
              • Filter by Classes or Cost Sets
              • Clear the Filter
          • Using the Find Function
          • Save and Share View
            • Select Dialog Box
              • Display the Select Dialog Box
            • Save Current View As Dialog Box
              • Display the Save Current View As Dialog Box
            • Manage Views Dialog Box
              • Display the Manage View Dialog Box
            • Procedures
              • Create a View
              • Modify an Existing View
              • Manage Views
          • Dialog Boxes (Spreadsheet Pane of the Project View)
            • Add Control Account Dialog Box
              • Display the Add Control Account Dialog Box
            • Add Work Package Dialog Box
              • Display the Add Work Package Dialog Box
            • Add Resource Assignment Dialog Box
              • Display the Add Resource Assignment Dialog Box
            • Copy Control Account Dialog Box
              • Display the Copy Control Account Dialog Box
            • Copy Work Package Dialog Box
              • Display the Copy Work Package Dialog Box
            • Move Control Account Dialog Box
              • Display the Move Control Account Dialog Box
            • Move Work Package Dialog Box
              • Display the Move Work Package Dialog Box
            • Rename Control Account Dialog Box
              • Display the Rename Control Account Dialog Box
            • Rename Work Package Dialog Box
              • Display the Rename Work Package Dialog Box
            • Update EAC Dialog Box
              • Display the Update EAC Dialog Box
          • Procedures
            • Adding a New Control Account
              • Add a New Control Account using the Dialog Box
              • Add a New Control Account Manually
            • Adding a New Work Package
              • Add a New Work Package using the Dialog Box
              • Add a New Work Package Manually
            • Rename a Control Account
            • Rename a Work Package
            • Move a Control Account
            • Move a Work Package
            • Copy a Control Account
            • Copy a Work Package
            • Add a Resource Assignment
            • Save the Contents of the Spreadsheet Pane as an Excel File
            • Update EAC
        • Time-phase Pane of the Project View
          • Time-phase Pane Field Descriptions
          • Data Entry in the Time-phase Pane
        • Tabbed Pane of the Project View
          • General Tab of the Project View
            • How Cobra Uses the Early and Late Dates
            • Secure Baseline Dates
            • Budget Pending Dates
            • Resource Assignment Percent Complete Dialog Box
              • Display the Resource Assignment Percent Complete Dialog Box
          • Milestones/Steps Tab of the Project View
            • Reconcile Milestone Weight Variance Dialog Box
              • Display the Reconcile Milestone Weight Variance Dialog Box
            • Procedures
              • Add Milestones or Steps
              • Modify Milestones or Steps
              • Delete Milestones or Steps
              • Reconcile Milestone Weights
          • Codes Tab of the Project View
          • Notes Tab of the Project View
        • Time-phase Detail Pane of the Project View
          • Forecast Details Pane
          • Using Spread
          • Spread Dialog Box
            • Display the Spread Dialog Box
          • Spread Curve Dialog Box
            • Display the Spread Curve Dialog Box
          • Procedures
            • Adjust Budget Spreads Manually
            • Spread Updated Budgets for Resources
            • Spread Budgets Using Pre-defined Spread Methods
            • Reconcile Budgets and Forecasts
      • Project Properties Dialog Box
        • General Tab of the Project Properties Dialog Box
          • Procedures
            • Synchronize Status Dates
            • Modify the Project Description
            • Enter Project Dates
            • Set Reporting Options
            • Select EVMS Acceptance for a Project
        • Contract Information Tab of the Project Properties Dialog Box
          • Procedures
            • Enter Contract Information
        • Budget Tab of the Project Properties Dialog Box
          • Procedures
            • Enter Budget Information
        • Fields Tab of the Project Properties Dialog Box
          • Procedures
            • Assign Control Account and Work Package Structures to a Project
        • Files Tab of the Project Properties Dialog Box
          • Rolling Wave Dialog Box of the Project Properties Dialog Box
          • Procedures
            • Assign Ancillary Files to a Project
            • Select the Level at Which to Capture Actual Costs
            • Run the Rolling Wave Process Without Advancing the Calendar
        • Classes Tab of the Project Properties Dialog Box
          • Class Overview
          • Custom Cost Classes
          • General Tab of the Classes Tab
            • Procedures
              • Assign a Rate File to a Forecast Actual or Budget Class
              • Assign a Calendar Set to a Forecast or Budget Class
              • Assign a Budget Source to a Budget Class
              • Assign a Forecast Method to a Forecast Class
          • Included Earned Classes Tab of the Classes Tab
            • Procedures
              • Associate an Earned Value Class with a Forecast Class
          • Included Budget Classes Tab of the Classes Tab
            • Procedures
              • Associate a Budget Class with a Forecast Actual or Earned Class
          • Included Actual Classes Tab of the Classes Tab
            • Procedures
              • Associate an Actual Class with a Forecast Class
          • New Class Wizard
            • General Information Page of the New Class Wizard
            • Class Settings Page for Actuals Class of the New Class Wizard
            • Class Settings Page for Budget Class of the New Class Wizard
            • Class Settings Page for Earned Class of the New Class Wizard
            • Class Settings Page for Forecast Class of the New Class Wizard
            • Forecast Class Page of the New Class Wizard
            • Include in Budget Cost Set Page of the New Class Wizard
            • Include in Earned Cost Set Page of the New Class Wizard
            • Include in Actuals Cost Set Page of the New Class Wizard
            • Include in EAC Cost Set Page of the New Class Wizard
            • Confirmation Page of the New Class Wizard
            • Procedures
              • Display the New Class Wizard
              • Create a New Class
          • Copy Classes Dialog Box
            • Display the Copy Classes Dialog Box
        • Cost Sets Tab of the Project Properties Dialog Box
          • Copy Cost Sets Dialog Box
            • Display the Copy Cost Sets Dialog Box
          • Procedures
            • Create a New Cost Set
            • Add a Class to a Cost Set
            • Copy Existing Cost Sets to a Project
            • Delete a Cost Set
        • Code Assignments Tab of the Project Properties Dialog Box
          • Copy Project Codes Dialog Box
            • Display the Copy Project Codes Dialog Box
          • Procedures
            • Assign Codes to a Project
            • Copy Codes to Another Project
        • Sub-Projects Tab of the Project Properties Dialog Box
          • Save As Dialog Box (Merging Projects)
            • Display the Save As Dialog Box (Merging Projects)
          • Sub-Projects Validation Dialog Box
            • Sub-Projects Validation Dialog Box
          • Procedures
            • Assign Sub-Projects to a Master Project
            • Merge Sub-Projects into a New Project
            • Validate Sub-Projects
            • Remove Sub-Projects from a Master Project
        • Preferences Tab of the Project Properties Dialog Box
          • Using the Selected and Secure Checkboxes
          • Actual Costs Preferences
          • Advance Calendar Preferences
          • Analyze Preferences
          • ANSI EIA X12 Preferences
          • Integration Wizard Preferences
            • Behavior of the Options
          • Project Preferences
          • Earned Preferences
          • Forecast Preferences
          • Recalc Preferences
          • Reclass Preferences
          • Replan Preferences
          • Copy Preferences Dialog Box
            • Display the Copy Preferences Dialog Box
          • Procedures
            • Copy Project Preferences
        • Access Control Tab of the Project Properties Dialog Box
        • Open Status Tab of the Project Properties Dialog Box
        • Procedures
          • Display the Project Properties Dialog Box from an Open Project
          • Display the Project Properties Dialog Box without Opening the Project
          • Display the Project Properties Dialog Box Tabs from an Open Project File
          • Display the Project Properties Dialog Box Tabs without Opening a Project File
      • New Project Wizard
        • General Information Page of the New Project Wizard
        • Fields Page of the New Project Wizard
        • Ancillary Files Page of the New Project Wizard
        • Settings Page of the New Project Wizard
        • Project Dates Page of the New Project Wizard
        • Project Code Assignments Page of the New Project Wizard
        • Sub-Projects Page of the New Project Wizard
        • Access Control Page of the New Project Wizard
        • Confirmation Page of the New Project Wizard
        • Procedures
          • Display the New Project Wizard
          • Create a New Project
      • Project Security
        • Procedures
          • Give a User Access to a Project
          • Give a Group Access to a Project
      • Multiproject Operations (Master and Subprojects)
        • Multiproject Guidelines
        • Merging a Master Project's Subprojects to Create a New Project
        • Procedures
          • Create a Master Project
          • Assign Sub-Projects to a Master Project
          • Remove Sub-Projects from a Master Project
          • Merge Sub-Projects into a New Project
          • Validate Sub-Projects
      • Standard Dialog Boxes and Procedures
        • New File Dialog Box
          • Display the New File Dialog Box
          • Considerations When Creating Names in Cobra
        • Open File Dialog Box
          • Display the Open File Dialog Box
        • Lookup Dialog Box
          • Display the Lookup Dialog Box
        • Save As Dialog Box (Projects)
          • Display the Save As Dialog Box (Projects)
        • Save As Dialog Box (Ancillary Files)
          • Display the Save As Dialog Box (Ancillary Files)
        • Find Dialog Box
          • Display the Find Dialog Box
        • Insert Column Dialog Box
          • Display the Insert Column Dialog Box
        • Edit Column Dialog Box
          • Display the Edit Column Dialog Box
        • Column Width Dialog Box
          • Display the Column Width Dialog Box
        • Rename Dialog Box
          • Display the Rename Dialog Box
        • Purge Dialog Box
          • Display the Purge Dialog Box
      • Basic Procedures
        • Save a Project as a Different Project
        • Save an Ancillary File as a Different File
        • Copy the Projects Pane or the Spreadsheet Pane to Excel
        • Find Text
        • Find Numeric Data
        • Manage Columns
        • Insert a Column in a View
        • Edit a Column in a View
        • Remove a Column from a View
        • Adjust Column Width
        • Size a Column for Best Fit
        • Purge a Project
        • Rename a Project
        • Rename an Ancillary File
        • Freeze Columns in a View
    • Calendars
      • Calendar Periods
      • Calendar Sets
      • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
      • Calendar View
        • Edit Tab of the Calendar View
        • Shortcut Menu
        • Procedures
          • Display the Calendar View using the Calendars Group Bar
          • Display the Calendar View using the Cobra Button
        • Calendar Periods Tab of the Calendar View
          • Generate Periods Dialog Box
            • Display the Generate Periods Dialog Box
          • Calculate Hours Dialog Box
            • Display the Calculate Hours Dialog Box
          • Procedures
            • Generate Calendar Periods
            • Add Calendar Periods
            • Delete Calendar Periods
            • Add Holidays to a Calendar
            • Delete an Existing Holiday from the Calendar
            • Calculate Hours for a Calendar
        • Calendar Sets Tab of the Calendar View
          • Add Calendar Set Dialog Box
            • Display the Add Calendar Set Dialog Box
          • Edit Calendar Set Dialog Box
            • Display the Edit Calendar Set Dialog Box
          • Flag Periods Dialog Box
            • Display the Flag Periods Dialog Box
          • Procedures
            • Add Calendar Sets
            • Set the TODATE Period
            • Extend the Calendar Periods
            • Flag Periods
            • Edit Calendar Sets
            • Delete Calendar Sets
      • New Calendar File Wizard
        • General Information Page of the New Calendar File Wizard
        • Periods Page of the New Calendar File Wizard
        • Productive Hours Page of the New Calendar File Wizard
        • Period Labels Page of the New Calendar File Wizard
        • Access Control Page of the New Calendar File Wizard
        • Confirmation Page of the New Calendar File Wizard
        • Procedures New Calendar Wizard
          • Create a New Calendar
          • Display the New Calendar File Wizard
      • Calendar File Properties Dialog Box
        • Procedures Calendar File Properties Dialog Box
          • Display the Calendar File Properties Dialog Box Tabs without Opening a Calendar File
          • Display the Calendar File Properties Dialog Box Tabs from an Open Calendar File
        • General Tab of the Calendar File Properties Dialog Box
        • Access Control Tab of the Calendar File Properties Dialog Box
      • Calendar File Security
        • Procedures
          • Enable a User to Access a Calendar File
          • Enable a Group to Access a Calendar File
      • Assigning a Calendar to a Project
      • Rolling Wave Process or Weekly Earned Value
      • When Calendar Dates Change
    • Codes
      • Code Usage in Cobra
      • Code Files
      • Types of Code Files
      • Code File Structures
      • Use a Code File in Multiple Projects
      • Validate Code Assignments — Solve Roll-Up Issues
      • Codes and the Integration Wizard
      • Codes and the Report Wizard
      • Variance Thresholds
      • Code View
        • Edit Tab of the Code View
        • Shortcut Menu
        • Procedures
          • Display the Code View using the Codes Group Bar
          • Display the Code View using the Cobra Button
        • Codes Grid of the Code View
          • Copy Children Dialog Box
            • Display the Copy Children Dialog Box
          • Copy Down Codes Dialog Box
            • Display the Copy Down Codes Dialog Box
          • Reorder Resources/Codes Dialog Box
            • Display the Reorder Resources/Codes Dialog Box
          • Procedures
            • Add a Code to a Code File
            • Add a Child Code to a Code
            • Delete a Code
            • Copy Child Codes to a Code
            • Copy Down Code Assignments to Child Codes
            • Copy Down Threshold Values to Child Codes
            • Reorder Codes
        • Details Tab of the Code View
        • Notes Tab of the Code View
        • Thresholds Tab of the Code View
        • Procedures
          • Add a Note to a Code
          • Set Threshold Values for a Code
      • New Code File Wizard
        • General Information Page of the New Code File Wizard
        • Code File Structure Page of the New Code File Wizard
        • Thresholds Page of the New Code File Wizard
        • Code Fields Page of the New Code File Wizard
        • Access Control Page of the New Code File Wizard
        • Confirmation Page of the New Code File Wizard
        • Procedures
          • Display the New Code File Wizard
          • Create a New Code File
      • Code File Properties Dialog Box
        • General Tab of the Code File Properties Dialog Box
        • Structure Tab of the Code File Properties Dialog Box
        • Code Fields Tab of the Code File Properties Dialog Box
        • Thresholds Tab of the Code File Properties Dialog Box
        • Access Control Tab of the Code File Properties Dialog Box
        • Procedures
          • Display the Code File Properties Dialog Box Tabs without Opening a Code File
          • Display the Code File Properties Dialog Box Tabs from an Open Code File
      • Code File Security
        • Enable a User to Access a Code File
        • Enable a Group to Access a Code File
    • Rates
      • Rate Files
        • Example Rate File
      • Rate Sets
      • Rate View
        • Rate Sets Grid
          • Add Rate Set Wizard
            • General Information Page of the Add Rate Set Wizard
            • Rate Set Options Page of the Add Rate Set Wizard
            • Fixed Value Change Per Time Period Page of the Add Rate Set Wizard
            • Fixed Percentage Change Per Time Period Page of the Add Rate Set Wizard
            • Full Time Equivalent from Calendar Hours Page of the Add Rate Set Wizard
            • Copy Another Rate Set Page of the Add Rate Set Wizard
            • Copy Another Rate Set and Apply a Fixed Value Adjustment Page of the Add Rate Set Wizard
            • Copy Another Set Apply % Adjustment Page of the Add Rate Set Wizard
            • Confirmation Page of the Add Rate Set Wizard
            • Procedures
              • Display the Add Rate Set Wizard
              • Add a Rate Set to a Rate File
        • Rates Grid
          • Procedures
            • Add a Rate to an Existing Rate Set
            • Delete a Rate From a Rate Set
            • Generate Rates for an Existing Rate Set
        • Details Tab of the Rate View
          • Display the Details Tab of the Rate View
        • Edit Tab of the Rate View
        • Shortcut Menu
        • Procedures
          • Display the Rate View using the Cobra Button
          • Display the Rate View using the Rates Group Bar
          • Delete a Rate Set
          • Rename a Rate Set
      • New Rate File Wizard
        • General Information Page of the New Rate File Wizard
        • Code Fields Page of the New Rate File Wizard
        • Access Control Page of the New Rate File Wizard
        • Confirmation Page of the New Rate File Wizard
        • Procedures
          • Display the New Rate File Wizard
          • Create a New Rate File
      • Rate File Properties Dialog Box
        • General Tab of the Rate File Properties Dialog Box
        • Code Fields Tab of the Rate File Properties Dialog Box
        • Access Control Tab of the Rate File Properties Dialog Box
        • Procedures
          • Display the Rate File Properties Dialog Box Tabs from an Open Rate File
          • Display the Rate File Properties Dialog Box Tabs without Opening a Rate File
      • Rate File Security
        • Procedures
          • Enable a User to Access a Rate File
          • Enable a Group to Access a Rate File
    • Resources
      • Resource Components
      • Define Costs for Resources
      • Examples of Resources
      • Resource File Structure
      • Element of Cost
      • Plan Resource Information
      • Additional Information in Resources
      • Results or Field Names
      • Resources and Code Files
      • Loading Resource Files from Open Plan
      • Resource-Loaded Schedule
      • Variance Thresholds
      • Code the Resources for IPMR Format 2 Reports
      • Resource View
        • Procedures
          • Display the Resource View using the Cobra Button
          • Display the Resource View using the Resources Group Bar
        • Edit Tab of the Resource View
        • Shortcut Menu
        • Resources Grid of the Resource View
          • Copy Children Dialog Box
            • Display the Copy Children Dialog Box
          • Copy Down Codes Dialog Box
            • Display the Copy Down Codes Dialog Box
          • Reorder Resources/Codes Dialog Box
            • Display the Reorder Resources/Codes Dialog Box
          • Procedures
            • Add a Resource to a Resource File
            • Add a Child Resource to a Resource
            • Delete a Resource from a Resource File
            • Copy Child Resources to a Resource
            • Copy Down Code Assignments to Child Resources
            • Copy Down Threshold Values to Child Resources
            • Reorder Resources
            • Assign Element of Cost to a Resource
            • Copy Element of Cost Value to Child Resources
        • Details Tab of the Resource View
        • Notes Tab of the Resource View
        • Thresholds Tab of the Resource View
        • Calculations Tab of the Resource View
          • Add Resource Results Dialog Box
            • Display the Add Resource Results Dialog Box
          • Order Resource Results Dialog Box
            • Display the Add Resource Results Dialog Box
          • Copy Resource Calculations Dialog Box
            • Display the Copy Resource Calculations Dialog Box
          • Procedures
            • Add Results to a Resource
            • Add Calculations to a Resource
            • Copy Calculations from Another Resource
            • Delete a Result from a Resource
            • Assign a Rate Set to a Result
        • Apportionment Definition Tab of the Resource View
          • Define Resource Apportionment
      • New Resource File Wizard
        • General Information Page of the New Resource File Wizard
        • Resource File Structure Page of the New Resource File Wizard
        • Thresholds Page of the New Resource File Wizard
        • Code Fields Page of the New Resource File Wizard
        • Default Rates Page of the New Resource File Wizard
        • Resource Results Page of the New Resource File Wizard
        • Access Control Page of the New Resource File Wizard
        • Confirmation Page of the New Resource File Wizard
      • Procedures
        • Create a New Resource File
        • Display the New Resource File Wizard
      • Resource File Properties Dialog Box
        • Procedures
          • Display the Resource File Properties Dialog Box Tabs from an Open Resource File
          • Display the Resource File Properties Dialog Box Tabs without Opening a Resource File
        • General Tab of the Resource File Properties Dialog Box
        • Structure Tab of the Resource File Properties Dialog Box
        • Code Fields Tab of the Resource File Properties Dialog Box
        • Thresholds Tab of the Resource File Properties Dialog Box
        • Results Tab of the Resource File Properties Dialog Box
        • Access Control Tab of the Resource File Properties Dialog Box
      • Resource File Security
        • Procedures
          • Enable a User to Access a Resource File
          • Enable a Group to Access a Resource File
    • Reports
      • Report Properties Dialog Box
        • General Tab of the Report Properties Dialog Box
        • Information Tab of the Report Properties Dialog Box
        • Report Definition Tab of the Report Properties Dialog Box
        • Access Control Tab of the Report Properties Dialog Box
        • Procedures
          • Display the Report Properties Dialog Box
      • Report Parameters
        • Report Content Parameters
        • Report Criterion Parameters
        • Report Options
        • Report Wizard Parameters
        • Reduce Memory Consumption for Very Large Reports
      • Report Wizard
        • Report Page of the Report Wizard
        • Projects Selection Page of the Report Wizard
        • Filter and Sort Page of the Report Wizard
          • Manage Filters Dialog Box of the Report Wizard
            • New Filter Dialog Box of the Report Wizard
            • New Filter Expression Dialog Box of the Report Wizard
            • Edit Filter Expression Dialog Box of the Report Wizard
            • Copy Filter Dialog Box of the Report Wizard
          • Manage Sorts Dialog Box of the Report Wizard
            • New Sort Dialog Box of the Report Wizard
            • New Sort Expression Dialog Box of the Report Wizard
            • Edit Sort Expression Dialog Box of the Report Wizard
            • Copy Sort Dialog Box of the Report Wizard
        • Sub-Totals Page of the Report Wizard
        • Results Page of the Report Wizard
        • Calculated Results
          • Open Dialog Box of the Calculated Results Wizard
          • Calculated Results Dialog Box
          • Add Calculated Result Dialog Box of the Calculated Results Wizard
          • Copy Calculated Result Dialog Box of the Calculated Results Wizard
          • Procedures
            • Create a Calculated Result
            • Display the Calculated Results Wizard
        • Calendar Page of the Report Wizard
        • IPMR Format 2 Summary Page of the Report Wizard
        • Cost Sets Page of the Report Wizard
        • Style Page of the Report Wizard
        • Save and Run Page of the Report Wizard
        • Access Control Page of the Report Wizard
        • Confirmation Page of the Report Wizard
        • Process Running Page of the Report Wizard
        • Process Complete Page of the Report Wizard
        • Procedures
          • Display the Report Wizard
          • Generate a Report
      • Report Categories
        • Ancillary Reports
        • Audit Reports
        • Graphic Reports
        • Column Reports
        • Export Reports
        • Format Reports
        • Planning Reports
        • Time-phased Reports
      • Report Types
      • Customization of Reports
        • Report Templates
        • Report Template Location
        • Report Template Format
        • Report Template Tags
          • Section Tags
          • Formula Tags
          • Other Tags
          • Property Tags
            • Apportionment Mapping Tags
            • Baseline Tags
            • Calendar File Information Tags
            • Calendar Holiday Tags
            • Calendar Period Tags
            • Change Management Tags
            • Class Information Tags
            • Code File Information Tags
            • Code Tags
            • Control Account and Work Package Note Tags
            • Control Account Tags
            • Cost Set Information Tags
            • Explanation of Variance Narrative Tags
            • Milestone Tags
            • Note Information Tags
            • Project Information Tags
            • Rate File Information Tags
            • Rate Set Tags
            • Rate Tags
            • Report Filter Information Tags
            • Report Information Tags
            • Resource Assignment Tags
            • Resource Calculation Tags
            • Resource File Information Tags
            • Resource Tags
            • Work Package Tags
    • Batch Reports
      • Batch Reports Dialog Box
      • Add Batch Report Dialog Box
        • General Tab of the Add Batch Report Dialog Box
        • Included Reports Tab of the Add Batch Report Dialog Box
        • Access Control Tab of the Add Batch Report Dialog Box
      • Edit Batch Report Dialog Box
        • General Tab of the Edit Batch Report Dialog Box
        • Included Reports Tab of the Edit Batch Report Dialog Box
        • Access Control Tab of the Edit Batch Report Dialog Box
      • Copy Batch Report Dialog Box
      • Procedures
        • Run Batch Reports
        • Display the Add Batch Report Dialog Box
        • Display the Edit Batch Report Dialog Box
        • Display the Copy Batch Report Dialog Box
    • Project Processes
      • Status
        • Advance Calendar
          • Advance Calendar Wizard
            • Project Selection Page of the Advance Calendar Wizard
            • Synchronize Status Date Page of the Advance Calendar Wizard
            • Advance to Period Page of the Advance Calendar Wizard
            • Options Page of the Advance Calendar Wizard
            • Confirmation Page of the Advance Calendar Wizard
            • Process Running Page of the Advance Calendar Wizard
            • Process Complete Page of the Advance Calendar Wizard
          • Procedures
            • Advance the Calendar
        • Rolling Wave
          • Calendar Definition
          • Effect of Running the Process
          • Rolling Wave Wizard
            • Project Selection Page of the Rolling Wave Wizard
            • Options Page of the Rolling Wave Wizard
            • Confirmation Page of the Rolling Wave Wizard
            • Process Running Page of the Rolling Wave Wizard
            • Process Complete Page of the Rolling Wave Wizard
          • Procedures
            • Create a Rolling Wave Calendar
            • Assign a Rolling Wave Calendar to the Project
            • Run the Rolling Wave Process
            • Run the Rolling Wave Process Without Advancing the Calendar
        • Calculate Progress
          • Guidelines for Accurate Earned Value Management
          • Progress Techniques
            • Calculate Progress using the Calculated Apportionment Progress Technique
          • Earned Value Methods
          • How Cobra Calculates Progress to Determine Earned Value
          • Sample Earned Value Calculation
          • Possible Sources of Errors
          • Concurrent Progress Calculations
            • Run Concurrent Progress Calculations
              • Troubleshooting Concurrency Issues
                • Use the Process Queue Manager form in PM Compass to Check Job Status
                • The server was unable to process the request due to an internal error
                • There was no endpoint listening at http://<machine>:<port>/CobraWebService/service that could accept the message
                • The encryption type requested is not supported by the KDC
          • Calculate Progress Wizard
            • Project Selection Page of the Calculate Progress Wizard
            • Options Page of the Calculate Progress Wizard
            • Run Page of the Calculate Progress Wizard
            • Confirmation Page of the Calculate Progress Wizard
            • Process Running Page of the Calculate Progress Wizard
            • Process Complete Page of the Calculate Progress Wizard
          • Procedures
            • Assign a Progress Technique to a Work Package
            • Add a Second Earned Value Class to Your Project
            • Select the Level at Which to Capture Actual Costs
            • Select the Earned Value Method
            • Calculate Progress
        • Forecasts
          • Manual Forecasts
          • Statistical Forecasts
          • Retain EAC
          • Coded Ranges Method
          • Forecast Calculations
            • Examples of Forecast Calculations
            • Examples of Manual Forecast Calculations
            • Examples of Statistical Forecast Calculations
          • How Cobra Spreads ETC
            • Calculate Forecast Spread by Existing EAC
            • Calculate Forecast Spread by Budget
          • How Cobra Calculates Forecast Scale EAC
          • Frozen Forecasts
          • Concurrent Forecast Calculations
            • Run Concurrent Forecast Calculations
              • Troubleshooting Concurrency Issues
                • Use the Process Queue Manager form in PM Compass to Check Job Status
                • The server was unable to process the request due to an internal error
                • There was no endpoint listening at http://<machine>:<port>/CobraWebService/service that could accept the message
                • The encryption type requested is not supported by the KDC
          • Calculate Forecast Wizard
            • Project Selection Page of the Calculate Forecast Wizard
            • Options Page of the Calculate Forecast Wizard
            • Forecast Class Selection Page of the Calculate Forecast Wizard
            • Manual Performance Factors Page of the Calculate Forecast Wizard
            • Run Page of the Calculate Forecast Wizard
            • Confirmation Page of the Calculate Forecast Wizard
            • Process Running Page of the Calculate Forecast Wizard
            • Process Complete Page of the Calculate Forecast Wizard
          • Procedures
            • Create a Forecast
            • Set Up a Retain EAC Forecast with the Scale EAC Option
            • Copy Budget to a Manual Forecast Using the Reclass Wizard
            • Export Time-Phased Resource Assignments to Excel
            • Import Time-Phased Resource Assignments from Excel
            • Calculate Forecast
      • Process
        • Freeze Forecast
          • Freeze Forecast Wizard
            • Project Selection Page of the Freeze Forecast Wizard
            • Criteria Selection Page of the Freeze Forecast Wizard
            • Cost Sets Page of the Freeze Forecast Wizard
            • Confirmation Page of the Freeze Forecast Wizard
            • Process Running Page of the Freeze Forecast Wizard
            • Process Complete Page of the Freeze Forecast Wizard
          • Procedures
            • Freeze a Forecast
        • Top-Down Planning
          • Top-Down Planning Wizard
            • Project Selection Page of the Top-Down Planning Wizard
            • Criteria Selection Page of the Top-Down Planning Wizard
            • Classes Page of the Top-Down Planning Wizard
            • Results Page of the Top-Down Planning Wizard
            • Calculation Page of the Top-Down Planning Wizard
            • Confirmation Page of the Top-Down Planning Wizard
            • Process Running Page of the Top-Down Planning Wizard
            • Process Complete Page of the Top-Down Planning Wizard
          • Procedures
            • Perform Top-Down Planning
        • Recalc
          • Recalculation Techniques
          • Recalc Wizard
            • Project Selection Page of the Recalc Wizard
            • Options Page of the Recalc Wizard
            • Criteria Selection Page of the Recalc Wizard
            • Classes Page of the Recalc Wizard
            • Results Page of the Recalc Wizard
            • Date Range Page of the Recalc Wizard
            • Confirmation Page of the Recalc Wizard
            • Process Running Page of the Recalc Wizard
            • Process Complete Page of the Recalc Wizard
          • Procedures
            • Recalculate Costs
        • Respread
          • Respread Wizard
            • Project Selection Page of the Respread Wizard
            • Options Page of the Respread Wizard
            • Criteria Selection Page of the Respread Wizard
            • Date Range Page of the Respread Wizard
            • Classes Page of the Respread Wizard
            • Confirmation Page of the Respread Wizard
            • Process Running Page of the Respread Wizard
            • Process Complete Page of the Respread Wizard
          • Procedures
            • Respread the Budget
        • Reclass
          • Reclass Guidelines
          • Reclass Wizard
            • Project Selection Page of the Reclass Wizard
            • Options Page of the Reclass Wizard
            • Criteria Page of the Reclass Wizard
            • Source Class Page of the Reclass Wizard
            • Target Class Page of the Reclass Wizard
            • Date Range Page of the Reclass Wizard
            • Confirmation Page of the Reclass Wizard
            • Process Running Page of the Reclass Wizard
            • Process Complete Page of the Reclass Wizard
          • Procedures
            • Reclass a Class
        • Replan
          • Replan Wizard
            • Project Selection Page of the Replan Wizard
            • Options Page of the Replan Wizard
            • Criteria Page of the Replan Wizard
            • Method Page of the Replan Wizard
            • Work Package Name Page of the Replan Wizard
            • Confirmation Page of the Replan Wizard
            • Process Running Page of the Replan Wizard
            • Process Complete Page of the Replan Wizard
          • Procedures
            • Perform Project Replan
        • Slip
          • Slip Wizard
            • Project Selection Page of the Slip Wizard
            • Criteria Page of the Slip Wizard
            • Slip By Page of the Slip Wizard
            • Confirmation Page of the Slip Wizard
            • Process Running Page of the Slip Wizard
            • Process Complete Page of the Slip Wizard
          • Procedures
            • Slip a Project
        • Apportionment
          • Apportionment Setup Steps
          • Create the Apportionment Definition
          • Apportionment Mapping
            • Apportionment Dialog Box
              • Display the Apportionment Dialog Box
            • Apportionment Mapping Dialog Box
              • Display the Apportionment Mapping Dialog Box
            • Add Apportionment Target Dialog Box
              • Display the Add Apportionment Target Dialog Box
            • Add Apportionment Source Dialog Box
              • Display the Add Apportionment Source Dialog Box
          • Apportionment Calculations
            • Concurrent Apportionment Calculations
              • Data Locking
              • Troubleshooting Concurrency Issues
                • Use the Process Queue Manager form in PM Compass to Check Job Status
                • The server was unable to process the request due to an internal error
                • There was no endpoint listening at http://<machine>:<port>/CobraWebService/service that could accept the message
                • The encryption type requested is not supported by the KDC
            • Apportionment Calculation Wizard
              • Project Selection Page of the Apportionment Calculation Wizard
              • Calculation Range Page of the Apportionment Calculation Wizard
              • Classes Page of the Apportionment Calculation Wizard
              • Run Page of the Apportionment Calculation Wizard
              • Confirmation Page of the Apportionment Calculation Wizard
              • Process Running Page of the Apportionment Calculation Wizard
              • Process Complete Page of the Apportionment Calculation Wizard
          • Procedures
            • Edit Apportionment Targets
            • Perform Apportionment Mapping
            • Perform Apportionment Calculations
            • Run Concurrent Apportionment Calculations
        • Analyze
          • Security Options for the Analyze Process
          • Analyze Options Dialog Box
            • Display the Analyze Options Dialog Box
          • Locate Custom Application Dialog Box
            • Display the Locate Custom Application Dialog Box
          • Analyze Project Dialog Box
            • Display the Analyze Project Dialog Box
          • Analyze Form
            • Analyze Edit Tab
              • Shortcut Menu
            • Results Pane of the Analyze Form
            • Graph Reports
            • Save Template Dialog Box
              • Display the Save Template Dialog Box
            • Narrative Text Pane of the Analyze Form
            • Get Narrative Dialog Box
              • Display the Get Narrative Dialog Box
          • Procedures
            • Perform Project Analysis
            • Create Graph Reports from the Analyze Form
            • Print Analyze Graph Reports
            • Save Graph Reports as Graphic Files
            • Save Graph Reports as XML Files
            • Copy Narrative Information
          • Customize Graphs
            • Procedures
              • Customize Graphs Using the Chart Designer
              • Select a Chart Type
              • Set Up Chart Details
              • Edit Chart Data
      • Project Audit Logging
        • Audit Logging
          • Log Change Comment Dialog Box
          • Round off Audit Log Transactions
        • Log Significant Changes for IPMR Format 3 Reports
        • Project Audit Wizard
          • Project Selection Page of the Project Audit Wizard
          • Log Operation Page of the Project Audit Wizard
          • Log Transaction Page of the Project Audit Wizard
          • Edit Comment and Change Number Page of the Project Audit Wizard
          • Prompt Level Page of the Project Audit Wizard
          • Set Project Baseline Page of the Project Audit Wizard
          • Log Comment Page of the Project Audit Wizard
          • Confirmation Page of the Project Audit Wizard
          • Process Running Page of the Project Audit Wizard
          • Process Complete Page of the Project Audit Wizard
          • Audit Log Comparison Page of the Project Audit Wizard
        • Procedures
          • Turn Project Audit On or Off
          • Reset the Baseline Using the Project Audit Wizard
          • Reconcile Project Logs Using the Project Audit Wizard
          • Update Transaction Changes
          • Edit the Project Audit Log
    • Integration
      • Integration Wizard
        • Data Import Using Scheduling Tools and Files
          • Sharing Cost and Schedule Information
          • Preparing Cobra for Schedule Integration
          • Data Import from Open Plan
            • Preparing the Open Plan Schedule
              • Check Open Plan Baseline Resource Records
            • Open Plan Fields Imported
            • Resource-Loaded Schedule
            • Loading Resource Files from Open Plan
            • Turn On the Opening % Feature When Integrating with Open Plan
          • Data Import from Microsoft Project
            • Options for Importing from Microsoft Project
            • Configure Cobra to Work with Microsoft Project Server
          • Data Import from Primavera
            • Preparing the Primavera Schedule
            • Primavera Fields Imported
          • Data Import Using Files
            • Import File for Loading Activity and Resource Assignment Data
              • Import File Loading Considerations
              • Sample Format for Loading Activity and Resource Assignment Data
              • Load an Import File with Activity and Resource Assignment Data
            • Import File with Data from Multiple Projects
              • Multi-Project Concurrent Integration
                • Load an Import File with Multiple Projects Concurrently
                • Integration Errors
                  • Troubleshooting Concurrency Issues
                    • Use the Process Queue Manager form in PM Compass to Check Job Status
                    • The server was unable to process the request due to an internal error
                    • There was no endpoint listening at http://<machine>:<port>/CobraWebService/service that could accept the message
                    • The encryption type requested is not supported by the KDC
                • View Job Status and Process Logs
                  • View Job Status and Process Logs in Cobra
                  • View Job Status and Process Logs in PM Compass
            • Import File Example
          • File Level Security
          • Template Resource Files
          • Import Data From Scheduling Tools and Files
          • Integration Wizard-Scheduling Tools and Files
            • Integration Configuration Page of the Integration Wizard
            • Connection Selection Page of the Integration Wizard
              • New Connection Dialog Box of the Integration Wizard
                • New Connection Dialog Box of the Integration Wizard-MS Project
                • New Connection Dialog Box of the Integration Wizard-Primavera
              • Edit Connection Dialog Box of the Integration Wizard
                • Edit Connection Dialog Box of the Integration Wizard-MS Project
                • Edit Connection Dialog Box of the Integration Wizard-Primavera
            • Action Selection Page of the Integration Wizard
            • Project Selection Page of the Integration Wizard
              • Project Selection Page of the Integration Wizard-Files
              • Project Selection Page of the Integration Wizard-Scheduling Tools
            • Notes Page of the Integration Wizard
            • Codes Page of the Integration Wizard
              • Codes Page of the Integration Wizard-MS Project
              • Codes Page of the Integration Wizard-Primavera
              • Codes Page of the Integration Wizard-Open Plan
            • Resources and Rates Page of the Integration Wizard
            • Resources and Rates Page of the Integration Wizard (New Project)
            • Date Selection Page of the Integration Wizard
              • Date Selection Page of the Integration Wizard-MS Project
              • Date Selection Page of the Integration Wizard-Primavera
              • Date Selection Page of the Integration Wizard-Open Plan
            • Import File Field Mapper Page of the Integration Wizard
            • Results Page of the Integration Wizard
            • Schedule Mapping Page of the Integration Wizard
              • Schedule Mapping Page of the Integration Wizard-MS Project
              • Schedule Mapping Page of the Integration Wizard-Primavera
              • Schedule Mapping Page of the Integration Wizard-Open Plan
            • Progress Page of the Integration Wizard
              • Progress Page of the Integration Wizard-Files
              • Progress Page of the Integration Wizard-Scheduling Tools
            • Resource Assignments Page of the Integration Wizard
              • Resource Assignments Page of the Integration Wizard-Files
              • Resource Assignments Page of the Integration Wizard-MS Project
              • Resource Assignments Page of the Integration Wizard-Primavera
              • Resource Assignments Page of the Integration Wizard-Open Plan
            • Calendar Page of the Integration Wizard
            • Change Control Page of the Integration Wizard
              • Deletion Criteria Dialog Box of the Integration Wizard
            • Status File Field Mapper Page of the Integration Wizard
            • Status Page of the Integration Wizard
              • Status Page of the Integration Wizard-Files
              • Status Page of the Integration Wizard-Scheduling Tools
            • Filter Page of the Integration Wizard
              • Filter Page of the Integration Wizard-Files
              • Filter Page of the Integration Wizard-Scheduling Tools
            • Other Options Page of the Integration Wizard
            • Save and Load Page of the Integration Wizard
            • Access Control Page of the Integration Wizard
            • Confirmation Page of the Integration Wizard
            • Process Running Page of the Integration Wizard
            • Process Complete Page of the Integration Wizard
        • Data Import-Actual Costs
          • Control Account Versus Work Package Level
          • Cumulative versus Current Period Costs
          • Master Project Versus Individual Projects
          • Control Account Fields Versus Codes
          • First Result and Derived Costs
          • Cost Classes
          • Entering Actual Costs
            • Entering Actual Costs Using an Import File
              • Import File Preparation
              • Import File Validation
            • Entering Actual Costs Manually
          • Loading Actual Cost Records
            • Loading Actual Cost Records from a CSV File
            • Loading Actual Cost Records from a Database Table
            • Actual Cost Import File
              • Data Formats
              • The Field Mapper
          • Create an MS SQL Database Connection to Load Actual Costs
          • Import Actual Cost Data
          • Integration Wizard-Actual Costs
            • Integration Configuration Page of the Integration Wizard
            • File Selection Page of the Integration Wizard
            • Database Table Selection Page of the Integration Wizard
            • Field Mapper Page of the Integration Wizard
            • Class and Results Page of the Integration Wizard
            • Included Costs Page of the Integration Wizard
            • Options Page of the Integration Wizard
            • Save and Load Page of the Integration Wizard
            • Access Control Page of the Integration Wizard
            • Confirmation Page of the Integration Wizard
            • Process Running Page of the Integration Wizard
            • Process Complete Page of the Integration Wizard
        • Data Import-Ancillary Data
          • Import Ancillary Data
          • Integration Wizard-Ancillary Data
            • Integration Configuration Page of the Integration Wizard
            • File Selection Page of the Integration Wizard
            • Ancillary File Field Mapper Page of the Integration Wizard
            • Save and Load Page of the Integration Wizard
            • Access Control Page of the Integration Wizard
            • Confirmation Page of the Integration Wizard
            • Process Running Page of the Integration Wizard
            • Process Complete Page of the Integration Wizard
        • Data Import-Apportionment Definition and Mapping Data
          • Data Import-Apportionment Definition
            • File Format for Importing Apportionment Definition
          • Data Import-Apportionment Mapping
            • File Format for Importing Apportionment Mapping
          • Edit Exported Data in Excel
          • Import Apportionment Definition and Mapping Data
          • Integration Wizard-Apportionment Definition and Mapping Data
            • File Selection Page of the Integration Wizard
            • Confirmation Page of the Integration Wizard
            • Process Running Page of the Integration Wizard
            • Process Complete Page of the Integration Wizard
        • Data Import-Budget Data
          • Import Budget Data into Cobra
        • Data Import-Status Data
          • File Format for Importing Status Information
          • Import Status Data into Cobra
      • Assignment Import/Assignment Export
        • Rules for Importing Data
        • Export and Import Time-Phased Resource Assignments
        • Specify the Export Location for Resource Assignments
        • Specify the Import Location for Resource Assignments
        • Assignment Import/Assignment Export Wizard
          • Project Selection Page of the Assignment Import/Assignment Export Wizard
          • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
          • Export Location Page of the Assignment Export Wizard
          • Import Location Page of the Assignment Import Wizard
          • Confirmation Page of the Assignment Import/Export Wizard
          • Process Running Page of the Assignment Import/Assignment Export Wizard
          • Process Complete Page of the Assignment Import/Assignment Export Wizard
          • Log Comment Page of the Assignment Import/Assignment Export Wizard
      • Configuration Security
        • Configuration Security Dialog Box
          • Display the Configuration Security Dialog Box
      • Data Export
        • Cost Data Export
          • Exported Cost Data File
          • Cost Data Wizard
            • Configuration Selection Page of the Cost Data Wizard
            • Project and Format Page of the Cost Data Wizard
            • Export Structures Page of the Cost Data Wizard
            • Codes and Structures Page of the Cost Data Wizard
            • Cost Sets Page of the Cost Data Wizard
            • Data Options Page of the Cost Data Wizard
            • Save and Run Page of the Cost Data Wizard
            • Access Control Page of the Cost Data Wizard
            • Confirmation Page of the Cost Data Wizard
            • Process Running Page of the Cost Data Wizard
            • Process Complete Page of the Cost Data Wizard
          • Procedures
            • Export Cost Data
        • Update Open Plan Resources
          • Update Open Plan Resources Wizard
            • General Information Page of the Update Open Plan Resources Wizard
            • Select Configuration Page of the Update Open Plan Resources Wizard
            • Criteria Page of the Update Open Plan Resources Wizard
            • Confirmation Page of the Update Open Plan Resources Wizard
            • Process Running Page of the Export Calendar to Open Plan Wizard
            • Process Complete Page of the Update Open Plan Resources Wizard
          • Procedures
            • Update Open Plan Resources
        • Calendar Export to Open Plan
          • Export Calendar to Open Plan Wizard
            • Calendar Selection Page of the Export Calendar to Open Plan Wizard
            • Confirmation Page of the Export Calendar to Open Plan Wizard
            • Process Running Page of the Export Calendar to Open Plan Wizard
            • Process Complete Page of the Export Calendar to Open Plan Wizard
          • Procedures
            • Export a Calendar to Open Plan
        • Cobra to wInsight Data Export
          • Narrative Export Process
          • wInsight Wizard
            • Configuration Page of the wInsight Wizard
            • Project Page of the wInsight Wizard
            • Export Structures Page of the wInsight Wizard
            • Project Officer Codes Page of the wInsight Wizard
            • Link Structures Page of the wInsight Wizard
            • Control Account Codes Page of the wInsight Wizard
            • Work Package Codes Page of the wInsight Wizard
            • Cost Sets Page of the wInsight Wizard
            • Element of Cost Page of the wInsight Wizard
            • Performance Data Page of the wInsight Wizard
            • IPMR Format 2 Summary Page of the wInsight Wizard
            • Miscellaneous Page of the wInsight Wizard
            • wInsight Database Page of the wInsight Wizard
              • New Connection Dialog Box of the wInsight Wizard
              • Edit Connection Dialog Box of the wInsight Wizard
            • Save and Run Page of the wInsight Wizard
            • Access Control Page of the wInsight Wizard
            • Confirmation Page of the wInsight Wizard
            • Process Running Page of the wInsight Wizard
            • Process Complete Page of the wInsight Wizard
          • Procedures
            • Export Data from Cobra to wInsight
          • Sections of the XML File
            • Units Section of the XML File
            • Structures Section of the XML File
            • Columns Section of the XML File
            • Calendars Section of the XML File
            • CalendarDets Section of the XML File
            • Contractors Section of the XML File
            • Contracts Section of the XML File
            • ACL Section of the XML File
            • Periods Section of the XML File
            • Cprs Section of the XML File
            • Elements Section of the XML File
            • EarnedValues Section of the XML File
            • Manpowers Section of the XML File
            • FutureEtcs Section of the XML File
            • NarrElemPers Section of the XML File
            • ElemLinks Section of the XML File
          • wInsight DTD
        • Data Export in ANSI EIA X12 Format
          • ANSI EIA X12 Wizard
            • Project Selection Page of the ANSI EIA X12 Wizard
            • Export Structures Page of the ANSI EIA X12 Wizard
            • Project Officer Codes Page of the ANSI EIA X12 Wizard
            • Results Page of the ANSI EIA X12 Wizard
            • Options Page of the ANSI EIA X12 Wizard
            • Export Page of the ANSI EIA X12 Wizard
            • Confirmation Page of the ANSI EIA X12 Wizard
            • Process Running Page of the ANSI EIA X12 Wizard
            • Process Complete Page of the ANSI EIA X12 Wizard
          • Procedures
            • Export Data in ANSI EIA X12 Format
    • Tools
      • Align Time-phased Dates
        • Align Time-phased Dates Wizard
          • Project Selection Page of the Align Time-phased Dates Wizard
          • Original Calendar Page of the Align Time-phased Dates Wizard
          • Confirmation Page of the Align Time-phased Dates Wizard
          • Process Running Page of the Align Time-phased Dates Wizard
          • Process Complete Page of the Align Time-phased Dates Wizard
        • Procedures
          • Align Time phased Resource Records
      • Zero-Out Data
        • Zero-Out Data Wizard
          • Project Selection Page of the Zero-Out Data Wizard
          • Options Page of the Zero-Out Data Wizard
          • Criteria Selection Page of the Zero-Out Data Wizard
          • Classes Page of the Zero-Out Data Wizard
          • Date Range Page of the Zero-Out Data Wizard
          • Confirmation Page of the Zero-Out Data Wizard
          • Process Running Page of the Zero-Out Data Wizard
          • Process Complete Page of the Zero-Out Data Wizard
        • Procedures
          • Set Resource Values to Zero
      • Update Codes
        • Update Codes Wizard
          • Project Selection Page of the Update Codes Wizard
          • Criteria Selection Page of the Update Codes Wizard
          • Update Code Page of the Update Codes Wizard
          • Confirmation Page of the Update Codes Wizard
          • Process Running Page of the Update Codes Wizard
          • Process Complete Page of the Update Codes Wizard
        • Procedures
          • Update the Code Fields
      • Replace Resources
        • Replace Resources Wizard
          • Project Selection Page of the Replace Resources Wizard
          • Resource Selection Page of the Replace Resources Wizard
          • Confirmation Page of the Replace Resources Wizard
          • Process Running Page of the Replace Resources Wizard
          • Process Complete Page of the Replace Resources Wizard
        • Procedures
          • Replace or Merge Resources
      • Calculated Fields
        • Calculated Fields Dialog Box
        • New Calculated Field Dialog Box
        • Calculated Field Expression Dialog Box
        • Fields Dialog Box
        • Considerations When Creating Field Names
        • Procedures
          • Display the Calculated Fields Dialog Box
          • Display the New Calculated Field Dialog Box
          • Display the Calculated Field Expression Dialog Box
          • Display the Fields Dialog Box
          • Create Calculated Fields
      • Update Totals
        • Update Totals Wizard
          • Project Selection Page of the Update Totals Wizard
          • Confirmation Page of the Update Totals Wizard
          • Process Running Page of the Update Totals Wizard
          • Process Complete Page of the Update Totals Wizard
        • Procedures
          • Update Totals
      • SQL Command Utility
        • SQL Command Utility Dialog Box
        • SQL Command Utility Supported Parameters
        • SQL Language Extended Support
        • Procedures
          • Run the SQL Command Utility
      • Validity Check
        • Validity Check Wizard
          • Project Selection Page of the Validity Check Wizard
          • Validations Page of the Validity Check Wizard
          • Business Validations Page of the Validity Check Wizard
          • Resource and Code Assignment Validations Page of the Validity Check Wizard
          • Ancillary File Validations Page of the Validity Check Wizard
          • Data Anomaly Validations Page of the Validity Check Wizard
          • Project and Apportionment Validations Page of the Validity Check Wizard
          • Confirmation Page of the Validity Check Wizard
          • Process Running Page of the Validity Check Wizard
          • Process Complete Page of the Validity Check Wizard
        • Procedures
          • Perform a Validity Check
      • Process Logs
        • Process Logs Dialog Box
        • Process Log Viewer
        • Errors Dialog Box of the Process Log Viewer
        • Warnings Dialog Box of the Process Log Viewer
        • Procedures
          • Display the Process Logs Dialog Box
          • Display the Process Log Viewer
          • Display the Errors Dialog Box of the Process Log Viewer
          • Display the Warnings Dialog Box of the Process Log Viewer
      • Debug Logs
        • ProcessLog.xml Log File
        • ClientDebugLog.xml Log File
        • ServerDebugLog.xml Log File
          • Logging of Memory Usage Details
        • Procedures
          • Log SQL Statements in ClientDebugLog.xml
          • Log SQL Statements in ServerDebugLog.xml
          • Edit IdeaBlade.ibconfig File
          • Disable the Automatic Archiving of ClientDebugLog.xml Log File
          • Log Memory Usage Details
      • Custom Hooks
        • Custom Hook Parameters
        • Customization of Processes
        • Customization of Integration Process
        • Procedures
          • Set Up Custom Applications
      • API
        • Running Cobra with Command Line Parameters
        • API Log File
        • API Script
          • Settings Section of the API Script
          • Process Sections of the API Script
            • Advance Calendar Process
            • ANSI EIA X12 Process
            • Apportionment Process
            • Backup Project Process
            • Batch Report Process
            • Calculate Progress Process
            • Calculate Forecast Process
            • Copy Project Process
            • Cost Data Export Process
            • Create Project from Template Process
            • Delete Project Process
            • Get Cobra Spread Process
            • Initialize Forecast Process
            • Integrate Actual Costs Process
            • Integrate Ancillary Data Process
            • Integrate Apportionment Definition Process
            • Integrate Apportionment Mapping Process
            • Integrate Project Data Process
            • Recalculate Process
            • Reclass Process
            • Reconcile Log Process
            • Replace Resources Process
            • Replan Process
            • Respread Process
            • Restore Process
            • Rolling Wave Process
            • Set Project Baseline Process
            • SQL Command Process
            • Update Totals Process
            • Update Tphase Process
            • Validity Check Process
            • wInsight Export Process
        • Project Template Creation
          • Required Template Files
          • XML Configuration File
          • API Script to Create a New Project from a Project Template
          • Application Settings
          • Additional Project Files
          • XML Configuration File Sample
          • Hook Program Methods
          • XML Configuration Object Interface
          • ClassRateFiles Collection
          • MsgLogger Object Interface
        • Procedures
          • Run the API Script
          • Create Windows Shortcut for the API Script
    • Security
      • EPM Security Administrator Functions
        • Procedures
          • Run the EPM Security Administrator
          • Disable Logins
          • Display a Login Message
          • Terminate a Session
          • Send a Message to Users
          • Turn Windows Authentication On or Off
          • Set Maximum Time of Inactivity
          • Set a Maximum Number of Login Tries
      • Change Ownership and Access Rights
        • Change Ownership and Access Rights Dialog Box
          • Display the Change Ownership and Access Rights Dialog Box
        • Procedures
          • Change the Owner of an Object
          • Change the Access Rights of an Object
      • Access Control
      • Windows Authentication
        • Windows Domain and User Name Authentication Plus Role Authentication
        • Configure Windows Authentication in an N-Tier Deployment
        • Configuring Windows Authentication Using the Configuration Files
          • wsHttpBinding Configuration
            • Procedures
              • Edit the Ideablade.Ibconfig file in the Server Folder
              • Configure Windows Authentication in an N-Tier Deployment
              • Configure the Service Parameters (wsHttpBinding)
              • Edit the Ideablade.Ibconfig file in the Cobra Folder
              • Modify the Cobra.WinUI.Exe.Config File in the Cobra Folder
            • Procedures
              • Edit the Ideablade.Ibconfig file in the Workstation Folder
              • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder
              • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
          • netTcpBinding Configuration
            • netTcpBinding Message Level Authentication
              • Procedures
                • Edit the Ideablade.Ibconfig file in the Server Folder (netTcpBinding)
                • Configure Windows Authentication in an N-Tier Deployment
                • Configure the Service Parameters (netTcpBinding Message Level)
              • Procedures
                • Edit the Ideablade.Ibconfig file in the Workstation Folder (netTcpBinding)
                • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
                • Modify the Cobra.Api.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
            • netTcpBinding Transport Level Authentication
              • Procedures
                • Edit the Ideablade.Ibconfig file in the Server Folder (netTcpBinding)
                • Configure Windows Authentication in an N-Tier Deployment
                • Configure the Service Parameters (netTcpBinding Transport Level)
              • Procedures
                • Edit the Ideablade.Ibconfig file in the Workstation Folder (netTcpBinding)
                • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Transport Level)
                • Modify the Cobra.Api.Exe.Config File in the Workstation Folder (netTcpBinding Transport Level)
          • Procedures
            • Deploy Configuration Files for Windows Authentication with an Upgrade Installation
            • Deploy Configuration Files for Windows Authentication with a New Installation
    • Cobra Database
      • Data Tool
      • ODBC DSN
    • Cobra Developer Resources
      • Cobra Web Service
        • Supported Processes, Operations, and Data
        • Deploying the Cobra Web Service
          • Deploy the Cobra Web Service Host
          • Configure the Cobra Web Service When Using Windows Authentication
            • Provide Access to the [NT AuthoritySystem] User to the Database
            • Create a Service Account for the Cobra Web Service
            • Grant the Service Account Access to the Database
          • Deploy the Cobra Web Service ClientAPI
          • Remove the Cobra Web Service Host from Windows Services
        • Using the Cobra Web Service ClientAPI in Your Application
          • Add the ClientAPI Files as Reference in Visual Studio Projects
          • Explaining the Cobra Web Service ClientAPI
            • Connecting to the Cobra Web Service Host
            • Creating Service Operations Classes
            • Running the Process or Operation
            • Retrieving Data
            • Logging Out of the Cobra Web Service Host
        • Cobra Web Service ClientAPI Example
          • Create a Sample Actual Cost Integration File
          • Run the SampleClientAPI Files
          • Explaining the SampleClientAPI Code
        • Cobra Web Service Log
          • Enable the WCF Trace Log
        • Other Distribution Files
        • Deltek Products That Utilize the Cobra Web Service
        • Troubleshooting Cobra Web Service Issues
          • The encryption type requested is not supported by the KDC
      • Cobra Web Service Management Tool
        • Cobra Web Service Management Tool Interface
          • Left Pane of the Cobra Web Service Management Tool
          • Right Pane of the Cobra Web Service Management Tool
            • Cobra Web Service Instance Settings
            • Cobra Web Service Gateway Settings
        • Procedures
          • Configure a New Instance
          • Configure the Gateway
          • Uninstall an Instance or the Gateway
          • Stop an Instance or the Gateway
          • Restart an Instance or the Gateway
          • Enable the WCF Trace Log
      • Configuring the Cobra Web Service to Use Secure Socket Layers
        • Obtain the Authentication Certificate Information on the Cobra Web Service Machines
        • Bind the Windows Server Certificate to the Cobra Web Service HTTPS Ports
        • Configure the Cobra Web Service Instances and/or Gateway using Cobra Web Service Management Tool
    • Cobra Features for PM Compass Users
      • Concurrency in Cobra
      • BCR Analysis Report
    • Advanced Topics
      • Multiple Sessions in Cobra
      • Running Cobra with Command Line Parameters
        • Pass Command Line Parameters using the New Application Shortcut
      • Additional User Fields
        • Configure Cobra to Support Additional User Fields
      • Application Processes
      • Troubleshoot Issues with Saving to the IdeaBlade.ibconfig File in Cobra
        • Clear the Read-only Flag in the IdeaBlade.ibconfig File
        • Run Cobra Using a Different IdeaBlade.ibconfig File
      • Troubleshoot Oracle Error ORA-600 [kkqcscpcky:ficand] While Running Query with Parameter "_replace_virtual_columns=false"
        • Update the "_replace_virtual_columns" Setting
    • Data Dictionary
Index
  • .net
  • about deltek cobra dialog box
  • access control
    • Change Owner Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Access Control
    • Display the Change Owner Dialog Box
    • Procedures
    • Change Ownership and Access Rights
    • Change Ownership and Access Rights Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Change Ownership and Access Rights Dialog Box
    • Change the Owner of an Object
    • Change Access Rights Dialog Box
    • ACL Section of the XML File
    • Change the Access Rights of an Object
  • access control page
    • Confirmation Page of the Integration Wizard
    • Enable a User to Access a Resource File
    • Access Control Page of the New Rate File Wizard
    • Confirmation Page of the Report Wizard
    • Access Control Page of the Integration Wizard
    • Enable a Group to Access a Code File
    • Access Control
    • Access Control Page of the New Code File Wizard
    • Access Control Page of the wInsight Wizard
    • Access Control Page of the Report Wizard
    • Access Control Page of the New Calendar File Wizard
    • Enable a User to Access a Code File
    • Access Control Page of the New Project Wizard
    • Enable a Group to Access a Calendar File
    • Access Control Page of the Integration Wizard
    • Access Control Page of the Cost Data Wizard
    • Access Control Page of the Integration Wizard
    • Access Control Page of the New Resource File Wizard
  • access control tab
    • Access Control Tab of the Report Properties Dialog Box
    • Enable a User to Access a Resource File
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Access Control Tab of the Rate File Properties Dialog Box
    • Enable a Group to Access a Resource File
    • Resource File Security
    • Access Control Tab of the Add Batch Report Dialog Box
    • Access Control Tab of the Resource File Properties Dialog Box
    • Access Control Tab of the Code File Properties Dialog Box
    • EPM Security Administrator Functions
    • Access Control
    • Enable a User to Access a Code File
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Enable a User to Access a Calendar File
    • Enable a Group to Access a Calendar File
    • Access Control Tab of the Project Properties Dialog Box
  • access rights
    • Change Owner Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Display the Change Owner Dialog Box
    • Procedures
    • Change Ownership and Access Rights
    • Change Ownership and Access Rights Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Change Ownership and Access Rights Dialog Box
    • Change the Owner of an Object
    • Change Access Rights Dialog Box
    • Change the Access Rights of an Object
  • action selection page
  • actual cost
    • Confirmation Page of the Integration Wizard
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Save and Load Page of the Integration Wizard
    • Code Files
    • SQL Command Utility
    • First Result and Derived Costs
    • Work Package Name Page of the Replan Wizard
    • Settings Page of the New Project Wizard
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Thresholds Tab of the Code File Properties Dialog Box
    • Method Page of the Replan Wizard
    • Progress Techniques
    • Codes
    • Loading Actual Cost Records
    • Thresholds Tab of the Code View
    • Class and Results Page of the Integration Wizard
    • Reporting
    • Cumulative versus Current Period Costs
    • Thresholds Page of the New Code File Wizard
    • Actual Costs Preferences
    • Projects
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Export Structures Page of the wInsight Wizard
    • The Field Mapper
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Field Mapper Page of the Integration Wizard
    • EPM Security Administrator Functions
    • Supported Processes, Operations, and Data
    • Select the Level at Which to Capture Actual Costs
    • Import File Preparation
    • Entering Actual Costs
    • Resources
    • Examples of Forecast Calculations
    • Actual Cost Import File
    • Cost Sets Page of the Report Wizard
    • General Tab of the Classes Tab
    • Import File Validation
    • Project Selection Page of the Freeze Forecast Wizard
    • Master Project Versus Individual Projects
    • Progress Techniques
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • Codes and the Integration Wizard
    • Integrate Actual Costs Process
    • How Cobra Spreads ETC
    • Integration Configuration Page of the Integration Wizard
    • Entering Actual Costs Using an Import File
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Thresholds Page of the New Resource File Wizard
    • Control Account Fields Versus Codes
    • Forecast Calculations
    • Customization of Integration Process
    • Running the Process or Operation
    • Cost Classes
    • Reclass Preferences
    • Creating Service Operations Classes
    • Integration Wizard-Actual Costs
    • File Selection Page of the Integration Wizard
    • Database Table Selection Page of the Integration Wizard
    • Resources and Code Files
    • Frozen Forecasts
    • Export Structures Page of the ANSI EIA X12 Wizard
    • Options Page of the Replan Wizard
    • Data Import-Actual Costs
    • Retain EAC
    • Freeze a Forecast
    • Examples of Statistical Forecast Calculations
    • Access Control Page of the Integration Wizard
    • Take your Implementation a Step Further
    • Thresholds Tab of the Resource View
    • Loading Actual Cost Records from a Database Table
    • Resources
    • Resource File Structure Page of the New Resource File Wizard
    • Codes
    • Cobra Web Service
    • Process Lock
    • Entering Actual Costs Manually
    • Process Logs Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Results Pane of the Analyze Form
    • Data Formats
    • Customization of Processes
    • Time-phased Reports
    • Control Account Versus Work Package Level
    • Included Costs Page of the Integration Wizard
    • Options Page of the Integration Wizard
    • Manual Forecasts
  • actual costs
    • Control Accounts and Work Packages
    • Create an MS SQL Database Connection to Load Actual Costs
  • acumen
    • Cost Data Export Process
    • Supported Processes, Operations, and Data
    • Cost Data Export
    • Cobra Web Service
  • add batch report dialog box
    • Access Control Tab of the Add Batch Report Dialog Box
    • Display the Add Batch Report Dialog Box
    • Add Batch Report Dialog Box
  • add calculation
  • add calendar periods
  • add calendar set
  • add control account
    • Add a New Control Account Manually
    • Add a New Control Account using the Dialog Box
  • add control account dialog box
  • add holidays
  • add rate set
    • Copy Another Rate Set and Apply a Fixed Value Adjustment Page of the Add Rate Set Wizard
    • Copy Another Rate Set Page of the Add Rate Set Wizard
    • Add Rate Set Wizard
  • add rate set wizard
    • Copy Another Set Apply % Adjustment Page of the Add Rate Set Wizard
    • Copy Another Rate Set and Apply a Fixed Value Adjustment Page of the Add Rate Set Wizard
    • Confirmation Page of the Add Rate Set Wizard
    • Rate Set Options Page of the Add Rate Set Wizard
    • Full Time Equivalent from Calendar Hours Page of the Add Rate Set Wizard
    • Fixed Percentage Change Per Time Period Page of the Add Rate Set Wizard
    • Copy Another Rate Set Page of the Add Rate Set Wizard
    • General Information Page of the Add Rate Set Wizard
    • Display the Add Rate Set Wizard
    • Fixed Value Change Per Time Period Page of the Add Rate Set Wizard
  • add resource
  • add resource assignment dialog box
  • add resource results
  • add work package
    • Add a New Work Package using the Dialog Box
    • Add a New Work Package Manually
  • add work package dialog box
  • administrator
    • Data Tool
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Project Codes Tab of the Application Preferences Dialog Box
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Send a Message to Users
    • Integration Configuration Page of the Integration Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Access Control Tab of the Code File Properties Dialog Box
    • Terminate a Session
    • Code Fields Page of the New Code File Wizard
    • EPM Security Administrator Functions
    • Security Options for the Analyze Process
    • Set a Maximum Number of Login Tries
    • Display the New Project Wizard
    • Manage Sorts Dialog Box of the Report Wizard
    • Access Control Page of the New Code File Wizard
    • Access Control Page of the Report Wizard
    • Code Fields Page of the New Resource File Wizard
    • Integration Configuration Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Log Operation Page of the Project Audit Wizard
    • Display a Login Message
    • wInsight Database Page of the wInsight Wizard
    • Access Control Page of the New Project Wizard
    • Custom Menu Items
    • Set Maximum Time of Inactivity
    • Turn Windows Authentication On or Off
    • Access Control Tab of the Project Properties Dialog Box
    • Manage Filters Dialog Box of the Report Wizard
    • Access Control Page of the New Resource File Wizard
    • Fields Page of the New Project Wizard
  • advance calendar
    • Progressing
    • Advance Calendar Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Process Running Page of the Advance Calendar Wizard
    • Advance to Period Page of the Advance Calendar Wizard
    • Procedures
    • Synchronize Status Date Page of the Advance Calendar Wizard
    • Supported Processes, Operations, and Data
    • How Cobra Calculates Progress to Determine Earned Value
    • Connecting to the Cobra Web Service Host
    • Advance Calendar
    • Running the Process or Operation
    • Creating Service Operations Classes
    • Confirmation Page of the Advance Calendar Wizard
    • Process Complete Page of the Advance Calendar Wizard
    • Advance Calendar Preferences
    • Advance Calendar Process
    • Cobra Web Service
    • Process Logs Dialog Box
    • Advance the Calendar
    • Options Page of the Advance Calendar Wizard
  • advance calendar wizard
    • Advance Calendar Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Process Running Page of the Advance Calendar Wizard
    • Advance to Period Page of the Advance Calendar Wizard
    • Procedures
    • Synchronize Status Date Page of the Advance Calendar Wizard
    • Advance Calendar
    • Confirmation Page of the Advance Calendar Wizard
    • Process Complete Page of the Advance Calendar Wizard
    • Advance the Calendar
    • Options Page of the Advance Calendar Wizard
  • advance to period page
  • align time phased dates
    • Process Complete Page of the Align Time-phased Dates Wizard
    • Align Time phased Resource Records
    • Process Running Page of the Align Time-phased Dates Wizard
    • Original Calendar Page of the Align Time-phased Dates Wizard
    • Align Time-phased Dates
    • Procedures
    • Project Selection Page of the Align Time-phased Dates Wizard
    • Confirmation Page of the Align Time-phased Dates Wizard
  • align time phased dates wizard
    • Process Complete Page of the Align Time-phased Dates Wizard
    • Align Time phased Resource Records
    • Process Running Page of the Align Time-phased Dates Wizard
    • Original Calendar Page of the Align Time-phased Dates Wizard
    • Align Time-phased Dates
    • Procedures
    • Project Selection Page of the Align Time-phased Dates Wizard
    • Align Time-phased Dates Wizard
    • Confirmation Page of the Align Time-phased Dates Wizard
  • all reports pane
    • Reports Pane Column Definitions
    • Shortcut Menu
    • All Reports Pane
  • analyze
    • Code Files
    • Analyze Preferences
    • Create Graph Reports from the Analyze Form
    • Edit Chart Data
    • Analyze Options Dialog Box
    • Customize Graphs Using the Chart Designer
    • Variance Thresholds
    • Save Graph Reports as XML Files
    • Graph Reports
    • Save Template Dialog Box
    • Procedures
    • Analyze
    • Security Options for the Analyze Process
    • Calendars
    • Variance Thresholds
    • Analyze Edit Tab
    • Locate Custom Application Dialog Box
    • Procedures
    • Classes Tab of the Project Properties Dialog Box
    • Multiproject Operations (Master and Subprojects)
    • Customize Graphs
    • Narrative Text Pane of the Analyze Form
    • Guidelines for Accurate Earned Value Management
    • Analyze Project Dialog Box
    • Select a Chart Type
    • Get Narrative Dialog Box
    • Save Graph Reports as Graphic Files
    • Copy Narrative Information
    • Export Structures Page of the ANSI EIA X12 Wizard
    • Print Analyze Graph Reports
    • Cobra 8.4 Help System
    • Perform Project Analysis
    • Set Up Chart Details
    • Analyze Form
    • Shortcut Menu
    • Process Logs Dialog Box
    • Results Pane of the Analyze Form
    • Resource Components
    • Column Reports
    • Ancillary Files Page of the New Project Wizard
  • analyze edit tab
    • Analyze Edit Tab
    • Shortcut Menu
  • analyze form
    • Create Graph Reports from the Analyze Form
    • Edit Chart Data
    • Analyze Options Dialog Box
    • Customize Graphs Using the Chart Designer
    • Save Graph Reports as XML Files
    • Graph Reports
    • Save Template Dialog Box
    • Procedures
    • Analyze
    • Security Options for the Analyze Process
    • Analyze Edit Tab
    • Locate Custom Application Dialog Box
    • Procedures
    • Customize Graphs
    • Narrative Text Pane of the Analyze Form
    • Analyze Project Dialog Box
    • Select a Chart Type
    • Get Narrative Dialog Box
    • Save Graph Reports as Graphic Files
    • Copy Narrative Information
    • Print Analyze Graph Reports
    • Perform Project Analysis
    • Set Up Chart Details
    • Analyze Form
    • Shortcut Menu
    • Results Pane of the Analyze Form
  • analyze options
  • analyze options dialog box
  • ancillary
  • ancillary file
    • Rename Dialog Box
    • Validity Check Process
    • Access Control Page of the Integration Wizard
    • Rename an Ancillary File
    • General Information Page of the New Project Wizard
    • Back Up Your Data
    • Save and Load Page of the Integration Wizard
    • Files Tab of the Project Properties Dialog Box
    • Sub-Projects Validation Dialog Box
    • Ancillary File Validations Page of the Validity Check Wizard
    • Confirmation Page of the Integration Wizard
    • Backup Project Process
    • Save As Dialog Box (Ancillary Files)
    • Integrate Ancillary Data Process
    • User Preferences Dialog Box
    • Process Running Page of the Integration Wizard
    • Purge Dialog Box
    • Ancillary File Field Mapper Page of the Integration Wizard
    • Cobra 8.4 Help System
    • Process Complete Page of the Integration Wizard
    • Select Files to Restore Dialog Box
    • Save As Dialog Box (Ancillary Files)
    • Ancillary Files Page of the New Project Wizard
  • ancillary file field mapper page
  • ancillary file validations page
  • ancillary files
    • Considerations When Creating Names in Cobra
    • Considerations When Creating Names in Cobra
  • ansi eia x12
    • ANSI EIA X12 Preferences
    • ANSI EIA X12 Process
  • ansi eia x12 wizard
    • Results Page of the ANSI EIA X12 Wizard
    • Process Complete Page of the ANSI EIA X12 Wizard
    • Confirmation Page of the ANSI EIA X12 Wizard
    • Export Page of the ANSI EIA X12 Wizard
    • Project Officer Codes Page of the ANSI EIA X12 Wizard
    • Procedures
    • Project Selection Page of the ANSI EIA X12 Wizard
    • Process Running Page of the ANSI EIA X12 Wizard
    • Data Export in ANSI EIA X12 Format
    • ANSI EIA X12 Wizard
    • Export Data in ANSI EIA X12 Format
    • Export Structures Page of the ANSI EIA X12 Wizard
    • Options Page of the ANSI EIA X12 Wizard
  • api
    • Create Windows Shortcut for the API Script
    • Calculate Progress Process
    • Preparing the Primavera Schedule
    • API
    • Initialize Forecast Process
    • Delete Project Process
    • Restore Process
    • Batch Report Process
    • Run the API Script
    • Get Cobra Spread Process
    • Cost Data Export Process
    • Validity Check Process
    • XML Configuration File Sample
    • Calculate Forecast Process
    • Terminate a Session
    • Project Template Creation
    • Supported Processes, Operations, and Data
    • Backup Project Process
    • Required Template Files
    • Hook Program Methods
    • API Log File
    • Integrate Ancillary Data Process
    • Create Project from Template Process
    • SQL Command Process
    • MsgLogger Object Interface
    • Apportionment Process
    • Replan Process
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Integrate Actual Costs Process
    • Reclass Process
    • XML Configuration File
    • Respread Process
    • ClassRateFiles Collection
    • API Script
    • Procedures
    • Process Sections of the API Script
    • Reconcile Log Process
    • Settings Section of the API Script
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Rolling Wave Process
    • wInsight Export Process
    • Integrate Project Data Process
    • Copy Project Process
    • Additional Project Files
    • Integrate Apportionment Mapping Process
    • XML Configuration Object Interface
    • Set Project Baseline Process
    • Update Tphase Process
    • Advance Calendar Process
    • Cobra Web Service
    • Integrate Apportionment Definition Process
    • Process Logs Dialog Box
    • ANSI EIA X12 Process
    • Replace Resources Process
    • API Script to Create a New Project from a Project Template
    • Application Settings
    • Recalculate Process
  • application preferences
    • Application Preferences
    • Application Preferences Dialog Box
    • General Tab of the Application Preferences Dialog Box
  • application preferences dialog box
    • Data Access Tab of the Application Preferences Dialog Box
    • Application Preferences Dialog Box
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Project Codes Tab of the Application Preferences Dialog Box
    • Custom Hooks Tab of the Application Preferences Dialog Box
    • General Tab of the Application Preferences Dialog Box
    • Add Spread Curve Dialog Box
    • Integration Tab of the Application Preferences Dialog Box
    • Configure the Application Settings
    • Edit Note Category Dialog Box
    • New Note Category Dialog Box
    • Notes Tab of the Application Preferences Dialog Box
    • Reports Tab of the Application Preferences Dialog Box
  • application process
  • application settings
    • Application Preferences
    • Configure the Application Settings
    • Other Tab of the Application Preferences Dialog Box
    • Application Settings
  • apportionment
    • Process Running Page of the Apportionment Calculation Wizard
    • Classes Page of the Apportionment Calculation Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Perform Apportionment Mapping
    • Calculate Progress using the Calculated Apportionment Progress Technique
    • File Format for Importing Apportionment Mapping
    • Progress Techniques
    • Validity Check Process
    • Project Selection Page of the Apportionment Calculation Wizard
    • Apportionment Definition Tab of the Resource View
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Process Complete Page of the Apportionment Calculation Wizard
    • Apportionment Calculation Wizard
    • Add Apportionment Source Dialog Box
    • Apportionment Dialog Box
    • Apportionment Setup Steps
    • Resource Assignments Page of the Integration Wizard-Files
    • Calculation Range Page of the Apportionment Calculation Wizard
    • Apportionment Mapping Tags
    • Create the Apportionment Definition
    • File Selection Page of the Integration Wizard
    • Apportionment
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Apportionment Process
    • Apportionment Calculations
    • Apportionment Mapping Dialog Box
    • Data Import-Apportionment Definition and Mapping Data
    • Perform Apportionment Calculations
    • Planning Reports
    • Apportionment Mapping
    • Add Apportionment Target Dialog Box
    • Edit Apportionment Targets
    • Resource Tags
    • Process Lock
    • Confirmation Page of the Apportionment Calculation Wizard
    • Process Logs Dialog Box
  • apportionment calculation
    • Process Running Page of the Apportionment Calculation Wizard
    • Classes Page of the Apportionment Calculation Wizard
    • Perform Apportionment Mapping
    • Project Selection Page of the Apportionment Calculation Wizard
    • Concurrent Apportionment Calculations
    • Process Complete Page of the Apportionment Calculation Wizard
    • Run Concurrent Apportionment Calculations
    • Apportionment Calculation Wizard
    • Add Apportionment Source Dialog Box
    • Apportionment Dialog Box
    • Run Page of the Apportionment Calculation Wizard
    • Apportionment Setup Steps
    • Calculation Range Page of the Apportionment Calculation Wizard
    • Create the Apportionment Definition
    • Apportionment
    • Apportionment Calculations
    • Apportionment Mapping Dialog Box
    • Perform Apportionment Calculations
    • Apportionment Mapping
    • Add Apportionment Target Dialog Box
    • Edit Apportionment Targets
    • Confirmation Page of the Apportionment Calculation Wizard
  • apportionment calculation wizard
    • Process Running Page of the Apportionment Calculation Wizard
    • Classes Page of the Apportionment Calculation Wizard
    • Project Selection Page of the Apportionment Calculation Wizard
    • Apportionment Calculation Wizard
    • Run Page of the Apportionment Calculation Wizard
    • Calculation Range Page of the Apportionment Calculation Wizard
    • Procedures
    • Perform Apportionment Calculations
    • Edit Apportionment Targets
    • Confirmation Page of the Apportionment Calculation Wizard
  • apportionment definition
    • Process Running Page of the Apportionment Calculation Wizard
    • Classes Page of the Apportionment Calculation Wizard
    • Perform Apportionment Mapping
    • Project Selection Page of the Apportionment Calculation Wizard
    • Process Running Page of the Integration Wizard
    • Process Complete Page of the Apportionment Calculation Wizard
    • Apportionment Calculation Wizard
    • Add Apportionment Source Dialog Box
    • Apportionment Dialog Box
    • Integration Wizard-Apportionment Definition and Mapping Data
    • Process Complete Page of the Integration Wizard
    • Apportionment Setup Steps
    • Calculation Range Page of the Apportionment Calculation Wizard
    • Create the Apportionment Definition
    • File Selection Page of the Integration Wizard
    • Apportionment
    • Apportionment Calculations
    • Data Import-Apportionment Definition
    • Apportionment Mapping Dialog Box
    • Edit Exported Data in Excel
    • Data Import-Apportionment Definition and Mapping Data
    • Perform Apportionment Calculations
    • Data Import-Apportionment Mapping
    • File Format for Importing Apportionment Definition
    • Apportionment Mapping
    • Add Apportionment Target Dialog Box
    • Edit Apportionment Targets
    • Integrate Apportionment Definition Process
    • Confirmation Page of the Apportionment Calculation Wizard
    • Confirmation Page of the Integration Wizard
  • apportionment dialog box
    • Display the Apportionment Dialog Box
    • Perform Apportionment Mapping
  • apportionment mapping
    • Process Running Page of the Apportionment Calculation Wizard
    • Classes Page of the Apportionment Calculation Wizard
    • Perform Apportionment Mapping
    • Project Selection Page of the Apportionment Calculation Wizard
    • Process Running Page of the Integration Wizard
    • Process Complete Page of the Apportionment Calculation Wizard
    • Apportionment Calculation Wizard
    • Add Apportionment Source Dialog Box
    • Apportionment Dialog Box
    • Integration Wizard-Apportionment Definition and Mapping Data
    • Process Complete Page of the Integration Wizard
    • Apportionment Setup Steps
    • Calculation Range Page of the Apportionment Calculation Wizard
    • Create the Apportionment Definition
    • File Selection Page of the Integration Wizard
    • Apportionment
    • Apportionment Calculations
    • Apportionment Mapping Dialog Box
    • Edit Exported Data in Excel
    • Data Import-Apportionment Definition and Mapping Data
    • Perform Apportionment Calculations
    • Data Import-Apportionment Mapping
    • File Format for Importing Apportionment Definition
    • Integrate Apportionment Mapping Process
    • Apportionment Mapping
    • Add Apportionment Target Dialog Box
    • Edit Apportionment Targets
    • Display the Apportionment Mapping Dialog Box
    • Confirmation Page of the Apportionment Calculation Wizard
    • Confirmation Page of the Integration Wizard
  • assignment export wizard
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Specify the Import Location for Resource Assignments
    • Export and Import Time-Phased Resource Assignments
    • Export Location Page of the Assignment Export Wizard
    • Specify the Export Location for Resource Assignments
    • Confirmation Page of the Assignment Import/Export Wizard
    • Process Running Page of the Assignment Import/Assignment Export Wizard
    • Assignment Import/Assignment Export
    • Assignment Import/Assignment Export Wizard
    • Rules for Importing Data
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
  • assignment import
  • assignment import wizard
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Specify the Import Location for Resource Assignments
    • Export and Import Time-Phased Resource Assignments
    • Specify the Export Location for Resource Assignments
    • Confirmation Page of the Assignment Import/Export Wizard
    • Process Running Page of the Assignment Import/Assignment Export Wizard
    • Assignment Import/Assignment Export
    • Assignment Import/Assignment Export Wizard
    • Rules for Importing Data
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Import Location Page of the Assignment Import Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
  • audit log
    • Round off Audit Log Transactions
    • Audit Logging
  • audit logging
    • Log Transaction Page of the Project Audit Wizard
    • Project Selection Page of the Project Audit Wizard
    • Audit Log Comparison Page of the Project Audit Wizard
    • Process Running Page of the Project Audit Wizard
    • Project Audit Wizard
    • Process Complete Page of the Project Audit Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Turn Project Audit On or Off
    • Edit the Project Audit Log
    • Prompt Level Page of the Project Audit Wizard
    • Round off Audit Log Transactions
    • Reset the Baseline Using the Project Audit Wizard
    • Audit Logging
    • Log Comment Page of the Project Audit Wizard
    • Update Transaction Changes
    • Log Operation Page of the Project Audit Wizard
    • Set Project Baseline Page of the Project Audit Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Project Logs Using the Project Audit Wizard
    • Project Audit Logging
    • Confirmation Page of the Project Audit Wizard
    • Procedures
  • backup
    • Data Access Tab of the Application Preferences Dialog Box
    • SQL Command Utility
    • Backup Dialog Box
    • Restore Process
    • Back Up Your Data
    • File Backup
    • Backup Dialog Box
    • Backup Project Process
    • Log SQL Statements in ClientDebugLog.xml
    • Custom Project Tables
    • Select Files to Restore Dialog Box
    • Process Logs Dialog Box
    • Log SQL Statements in ServerDebugLog.xml
    • Report Templates
  • backup dialog box
    • Display the Backup Dialog Box
    • Display the Backup Dialog Box
  • baseline
    • Milestones/Steps
    • Log Transaction Page of the Project Audit Wizard
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Project Selection Page of the Project Audit Wizard
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Initialize Forecast Process
    • Date Selection Page of the Integration Wizard-MS Project
    • Spreadsheet Pane of the Project View
    • Process Running Page of the Project Audit Wizard
    • Baseline Tags
    • Progress Techniques
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Add Control Account Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Project Dates Page of the New Project Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Calculate Progress
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Custom Cost Classes
    • Milestone Tags
    • Report Types
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Log Operation Page of the Project Audit Wizard
    • Open Plan Fields Imported
    • Set Project Baseline Page of the Project Audit Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Integration Wizard Preferences
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Options Page of the Replan Wizard
    • Change Management Tags
    • Process Lock
    • Milestones/Steps Tab of the Project View
    • Resource-Loaded Schedule
    • Date Selection Page of the Integration Wizard-Primavera
    • Set Up Projects and Project Baselines
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • baseline dates
    • Budget Pending Dates
    • Secure Baseline Dates
  • basic operations
  • basic procedures
    • Size a Column for Best Fit
    • Freeze Columns in a View
    • Rename an Ancillary File
    • Log Onto Cobra
    • Cobra Views
    • Remove a Column from a View
    • Find Text
    • Save a Project as a Different Project
    • Log Onto Cobra Using a Different User ID
    • Insert a Column in a View
    • Basic Procedures
    • Edit a Column in a View
    • Find Numeric Data
    • Save an Ancillary File as a Different File
    • Change Your Password
    • Copy the Projects Pane or the Spreadsheet Pane to Excel
    • Manage Columns
    • Adjust Column Width
    • Rename a Project
  • batch process
    • Process Log Viewer
    • Run the Rolling Wave Process
  • batch report
    • Copy Batch Report Dialog Box
    • Run Batch Reports
    • Batch Report Process
    • Batch Reports Pane
    • Access Control Tab of the Add Batch Report Dialog Box
    • Procedures
    • Batch Reports Dialog Box
    • Display the Copy Batch Report Dialog Box
    • Edit Batch Report Dialog Box
    • General Tab of the Edit Batch Report Dialog Box
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Included Reports Tab of the Add Batch Report Dialog Box
    • Batch Reports
    • Included Reports Tab of the Edit Batch Report Dialog Box
    • Display the Add Batch Report Dialog Box
    • Display the Edit Batch Report Dialog Box
    • General Tab of the Add Batch Report Dialog Box
    • Add Batch Report Dialog Box
  • batch reports dialog box
  • batch reports pane
    • Batch Reports Pane Column Definitions
    • Shortcut Menu
  • bcr analysis
  • budget
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Milestones/Steps
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Application Preferences
    • Code Files
    • Resource Assignment Percent Complete Dialog Box
    • Log Transaction Page of the Project Audit Wizard
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Project Selection Page of the Project Audit Wizard
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Preparing the Primavera Schedule
    • Settings Page of the New Project Wizard
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Baseline Tags
    • Perform Apportionment Mapping
    • Thresholds Tab of the Code File Properties Dialog Box
    • Budget Pending Dates
    • Method Page of the Replan Wizard
    • Progress Techniques
    • Reconcile Budgets and Forecasts
    • Spread Budgets Using Pre-defined Spread Methods
    • Thresholds Tab of the Code View
    • Variance Thresholds
    • Project Selection Page of the Respread Wizard
    • Reporting
    • Thresholds Page of the New Code File Wizard
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • General Tab of the Application Preferences Dialog Box
    • Included Actual Classes Tab of the Classes Tab
    • Statistical Forecasts
    • Include in Actuals Cost Set Page of the New Class Wizard
    • EPM Security Administrator Functions
    • Status Page of the Integration Wizard-Files
    • Prompt Level Page of the Project Audit Wizard
    • Spreadsheet Pane Column Definitions
    • Resources
    • General Information Page of the New Class Wizard
    • Spread Updated Budgets for Resources
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Calendars
    • Variance Thresholds
    • Data Import-Budget Data
    • Calculate Progress
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Import File Validation
    • Classes Tab of the Project Properties Dialog Box
    • Project Selection Page of the Reclass Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Multiproject Operations (Master and Subprojects)
    • Apportionment Process
    • Class Information Tags
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Sample Earned Value Calculation
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Resource Assignments
    • Include in EAC Cost Set Page of the New Class Wizard
    • Forecast Calculations
    • Notes Tab of the Resource View
    • Import Budget Data into Cobra
    • Log Operation Page of the Project Audit Wizard
    • Log Change Comment Dialog Box
    • Reclass Preferences
    • Set Project Baseline Page of the Project Audit Wizard
    • Adjust Budget Spreads Manually
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Milestone Weights
    • wInsight Database Page of the wInsight Wizard
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • Element of Cost Page of the wInsight Wizard
    • Recalc
    • Options Page of the Replan Wizard
    • Spread Curve Dialog Box
    • Change Management Tags
    • Cobra 8.4 Help System
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Take your Implementation a Step Further
    • Thresholds Tab of the Resource View
    • Earned Preferences
    • Status Page of the Integration Wizard
    • Confirmation Page of the Respread Wizard
    • Resources
    • Project Selection Page of the Top-Down Planning Wizard
    • Process Lock
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Classes Page of the Respread Wizard
    • Update Totals Process
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Resource-Loaded Schedule
    • Included Budget Classes Tab of the Classes Tab
    • Results Pane of the Analyze Form
    • Calendar Sets
    • Resource Components
    • Column Reports
    • Time-phased Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Set Up Projects and Project Baselines
    • Reclass a Class
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • budget planning
  • business validations page
  • calculate apportionment wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Perform Apportionment Mapping
    • Process Complete Page of the Apportionment Calculation Wizard
    • Add Apportionment Source Dialog Box
    • Apportionment Dialog Box
    • Apportionment Setup Steps
    • Create the Apportionment Definition
    • Apportionment
    • Apportionment Calculations
    • Apportionment Mapping Dialog Box
    • Apportionment Mapping
    • Add Apportionment Target Dialog Box
    • Confirmation Page of the Apportionment Calculation Wizard
  • calculate earned value wizard
  • calculate forecast
    • Examples of Manual Forecast Calculations
    • Calculate Forecast Process
    • Supported Processes, Operations, and Data
    • Examples of Forecast Calculations
    • Using Spread
    • How Cobra Spreads ETC
    • Forecast Calculations
    • Run Page of the Calculate Forecast Wizard
    • Examples of Statistical Forecast Calculations
    • Concurrent Forecast Calculations
    • Cobra Web Service
    • Run Concurrent Forecast Calculations
  • calculate forecast wizard
    • Calculate Forecast
    • Export Time-Phased Resource Assignments to Excel
    • Process Running Page of the Calculate Forecast Wizard
    • Import Time-Phased Resource Assignments from Excel
    • Process Complete Page of the Calculate Forecast Wizard
    • Statistical Forecasts
    • Procedures
    • Project Selection Page of the Calculate Forecast Wizard
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Run Page of the Calculate Forecast Wizard
    • Calculate Forecast Wizard
    • Frozen Forecasts
    • Create a Forecast
    • Retain EAC
    • Confirmation Page of the Calculate Forecast Wizard
    • Forecasts
    • Forecast Class Selection Page of the Calculate Forecast Wizard
    • Options Page of the Calculate Forecast Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
  • calculate hours
  • calculate progress
    • Progressing
    • Add a Second Earned Value Class to Your Project
    • Select the Earned Value Method
    • Calculate Progress Process
    • Assign a Progress Technique to a Work Package
    • Confirmation Page of the Calculate Progress Wizard
    • Calculate Progress using the Calculated Apportionment Progress Technique
    • Method Page of the Replan Wizard
    • Calculate Progress
    • General Tab of the Application Preferences Dialog Box
    • Confirmation Page of the Replan Wizard
    • Supported Processes, Operations, and Data
    • Select the Level at Which to Capture Actual Costs
    • Apportionment Setup Steps
    • Calculate Progress
    • Run Page of the Calculate Progress Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Sample Earned Value Calculation
    • Concurrent Progress Calculations
    • Run Concurrent Progress Calculations
    • Cobra Web Service
    • Select the Level at Which to Capture Actual Costs
  • calculate progress wizard
    • Add a Second Earned Value Class to Your Project
    • Select the Earned Value Method
    • Confirmation Page of the Calculate Progress Wizard
    • Calculate Progress Wizard
    • Options Page of the Calculate Progress Wizard
    • Select the Level at Which to Capture Actual Costs
    • Calculate Progress
    • Process Running Page of the Calculate Progress Wizard
    • Possible Sources of Errors
    • Project Selection Page of the Calculate Progress Wizard
    • Process Complete Page of the Calculate Progress Wizard
    • Select the Level at Which to Capture Actual Costs
  • calculate results wizard
  • calculated apportionment
  • calculated fields
    • Procedures
    • Calculated Fields
    • Create Calculated Fields
    • New Calculated Field Dialog Box
    • Calculated Field Expression Dialog Box
    • Calculated Fields Dialog Box
    • Fields Dialog Box
    • Considerations When Creating Field Names
  • calculated result wizard
    • Results Page of the Report Wizard
    • Open Dialog Box of the Calculated Results Wizard
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
  • calculated results
    • Calculated Results
    • Calculated Results Dialog Box
    • Create a Calculated Result
    • Display the Calculated Results Wizard
  • calculated results wizard
  • calculation
    • Data Tool
    • Milestones/Steps
    • Code Files
    • Preparing the Primavera Schedule
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Examples of Manual Forecast Calculations
    • Perform Apportionment Mapping
    • Sub-Totals Page of the Report Wizard
    • Calculations Tab of the Resource View
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Integration Wizard
    • Calculated Results
    • General Tab of the Application Preferences Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Sub-Projects Validation Dialog Box
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Resources and Rates Page of the Integration Wizard
    • Report Categories
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Resources
    • Data Import-Ancillary Data
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Resource Assignments Page of the Integration Wizard-Files
    • Resource-Loaded Schedule
    • Delete a Result from a Resource
    • Calculate Progress
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • File Selection Page of the Integration Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Custom Cost Classes
    • Order Resource Results Dialog Box
    • Apportionment Process
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • Assign a Rate Set to a Result
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Results Tab of the Resource File Properties Dialog Box
    • Forecast Calculations
    • Template Resource Files
    • Open Plan Fields Imported
    • Resources and Code Files
    • Retain EAC
    • Examples of Statistical Forecast Calculations
    • Earned Preferences
    • Resource Calculation Tags
    • Resources
    • Copy Resource Calculations Dialog Box
    • Process Lock
    • Options Page of the Calculate Forecast Wizard
    • Confirmation Page of the Apportionment Calculation Wizard
    • Process Logs Dialog Box
    • Resource-Loaded Schedule
    • Data Formats
    • Resource Components
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Status File Field Mapper Page of the Integration Wizard
    • Results or Field Names
  • calculation page
  • calculations tab
    • Procedures
    • Calculations Tab of the Resource View
    • Add Calculations to a Resource
    • Delete a Result from a Resource
    • Order Resource Results Dialog Box
    • Copy Calculations from Another Resource
    • Add Results to a Resource
    • Assign a Rate Set to a Result
    • Copy Resource Calculations Dialog Box
    • Resource Components
    • Add Resource Results Dialog Box
  • calendar
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Add Work Package Dialog Box
    • Process Complete Page of the Rolling Wave Wizard
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Report Template Format
    • Settings Page of the New Project Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Delete Project Process
    • Process Running Page of the Advance Calendar Wizard
    • Copy Control Account Dialog Box
    • Calendar Page of the Report Wizard
    • Advance to Period Page of the Advance Calendar Wizard
    • Validity Check Process
    • Process Complete Page of the Export Calendar to Open Plan Wizard
    • Rename an Ancillary File
    • Project Selection Page of the Respread Wizard
    • Reporting
    • General Information Page of the New Project Wizard
    • Projects
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Delete Calendar Sets
    • Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Calendars Section of the XML File
    • Calculate Hours Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Calendar Periods Tab of the Calendar View
    • Edit Calendar Sets
    • Sub-Projects Validation Dialog Box
    • Report Wizard
    • Add Control Account Dialog Box
    • Report Categories
    • Ancillary File Validations Page of the Validity Check Wizard
    • Project Dates Page of the New Project Wizard
    • Data Import-Ancillary Data
    • Miscellaneous Page of the wInsight Wizard
    • Resource-Loaded Schedule
    • Calendars
    • Required Template Files
    • Save As Dialog Box (Ancillary Files)
    • Manage Sorts Dialog Box of the Report Wizard
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Classes Tab of the Project Properties Dialog Box
    • File Selection Page of the Integration Wizard
    • Confirmation Page of the New Calendar File Wizard
    • Set the TODATE Period
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Multiproject Operations (Master and Subprojects)
    • Open File Dialog Box
    • Apportionment Process
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Open File Dialog Box
    • Class Information Tags
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Report Types
    • Target Class Page of the Reclass Wizard
    • XML Configuration File
    • Lookup Dialog Box
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Calendar Page of the Integration Wizard
    • Purge Dialog Box
    • Cobra Components
    • Flag Periods
    • Extend the Calendar Periods
    • Periods Page of the New Calendar File Wizard
    • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
    • Confirmation Page of the Advance Calendar Wizard
    • Save As Dialog Box (Projects)
    • Process Complete Page of the Advance Calendar Wizard
    • Copy Project Process
    • Enable a Group to Access a Calendar File
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • New File Dialog Box
    • Delete an Existing Holiday from the Calendar
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Save As Dialog Box (Projects)
    • Advance Calendar Process
    • New File Dialog Box
    • Edit Calendar Set Dialog Box
    • Process Lock
    • Run the Rolling Wave Process
    • Process Logs Dialog Box
    • Resource-Loaded Schedule
    • Calendar View
    • Advance the Calendar
    • Calendar Selection Page of the Export Calendar to Open Plan Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Date Range Page of the Recalc Wizard
    • Save As Dialog Box (Ancillary Files)
    • Period Labels Page of the New Calendar File Wizard
    • Calendar Sets
    • Rename a Project
    • Options Page of the Advance Calendar Wizard
    • Ancillary Files Page of the New Project Wizard
    • Time-phased Reports
    • Confirmation Page of the Export Calendar to Open Plan Wizard
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
  • calendar edit tab
  • calendar file
  • calendar file properties
    • Calendar File Properties Dialog Box
    • Display the Calendar File Properties Dialog Box Tabs from an Open Calendar File
    • Display the Calendar File Properties Dialog Box Tabs without Opening a Calendar File
  • calendar file properties dialog box
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Enable a Group to Access a Calendar File
    • Procedures
    • General Tab of the Calendar File Properties Dialog Box
  • calendar page
    • Calendar Page of the Report Wizard
    • Calendar Page of the Integration Wizard
  • calendar periods
    • Procedures
    • Extend the Calendar Periods
    • Calendar Periods
  • calendar set
    • Add Calendar Set Dialog Box
    • Report Template Format
    • Reporting
    • Delete Calendar Sets
    • Calculate Hours Dialog Box
    • Edit Calendar Sets
    • Sub-Projects Validation Dialog Box
    • Report Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Calendars
    • Add Calendar Sets
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Class Information Tags
    • Target Class Page of the Reclass Wizard
    • XML Configuration File
    • Calendar Sets Tab of the Calendar View
    • Advance Calendar
    • Calendar Page of the Integration Wizard
    • Flag Periods
    • Element of Cost Page of the wInsight Wizard
    • Advance Calendar Process
    • Edit Calendar Set Dialog Box
    • Calendar View
    • Included Budget Classes Tab of the Classes Tab
    • Date Range Page of the Recalc Wizard
    • Period Labels Page of the New Calendar File Wizard
    • Calendar Sets
    • Time-phased Reports
  • calendar sets
  • calendar view
    • Add Calendar Set Dialog Box
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Calculate Hours for a Calendar
    • Add Calendar Periods
    • Delete Calendar Sets
    • Delete Calendar Periods
    • Calculate Hours Dialog Box
    • Calendar Periods Tab of the Calendar View
    • Edit Calendar Sets
    • Flag Periods Dialog Box
    • Set the TODATE Period
    • Calendar Sets Tab of the Calendar View
    • Add Holidays to a Calendar
    • Flag Periods
    • Display the Calendar View using the Cobra Button
    • Enable a Group to Access a Calendar File
    • Delete an Existing Holiday from the Calendar
    • Edit Calendar Set Dialog Box
    • Procedures
    • Calendar View
    • Shortcut Menu
    • Generate Calendar Periods
    • Display the Calendar View using the Calendars Group Bar
  • calendars
    • Add Calendar Set Dialog Box
    • Calculate Hours for a Calendar
    • Add Calendar Periods
    • Generate Periods Dialog Box
    • Delete Calendar Periods
    • When Calendar Dates Change
    • Flag Periods Dialog Box
    • Assigning a Calendar to a Project
    • Add Calendar Sets
    • Access Control Page of the New Calendar File Wizard
    • Calendar Sets Tab of the Calendar View
    • Add Holidays to a Calendar
    • Calendar Periods
    • Enable a User to Access a Calendar File
    • Rolling Wave Process or Weekly Earned Value
    • Calendars
    • General Tab of the Calendar File Properties Dialog Box
    • Shortcut Menu
    • Generate Calendar Periods
  • calendars pane
    • Calendars Pane Column Definitions
    • Shortcut Menu
  • cam
    • Import File Field Mapper Page of the Integration Wizard
    • Criteria Page of the Replan Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Criteria Selection Page of the Respread Wizard
    • Criteria Selection Page of the Recalc Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • General Tab of the Project View
    • Criteria Page of the Reclass Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
    • Schedule Mapping Page of the Integration Wizard-MS Project
  • change control page
  • change owner
    • Change Owner Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Display the Change Owner Dialog Box
    • Procedures
    • Change Ownership and Access Rights
    • Change Ownership and Access Rights Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Change Ownership and Access Rights Dialog Box
    • Change the Owner of an Object
    • Change Access Rights Dialog Box
    • Change the Access Rights of an Object
  • change password
    • Display the Change Password Dialog Box
    • Display the Change Password Dialog Box
  • chart
    • Code Files
    • Analyze Preferences
    • Report Template Format
    • Create Graph Reports from the Analyze Form
    • Analyze Options Dialog Box
    • Reporting
    • Report Categories
    • Report Templates
  • citrix
  • class
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Add a Second Earned Value Class to Your Project
    • Forecast Class Page of the New Class Wizard
    • Resource Assignment Percent Complete Dialog Box
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Preparing the Primavera Schedule
    • Delete a Cost Set
    • Initialize Forecast Process
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Get Cobra Spread Process
    • Validity Check Process
    • Copy Classes Dialog Box
    • Display the New Class Wizard
    • Class and Results Page of the Integration Wizard
    • Merge Sub-Projects into a New Project
    • General Information Page of the New Project Wizard
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Status Page of the Integration Wizard-Scheduling Tools
    • Change Control Page of the Integration Wizard
    • Cost Set Information Tags
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Included Actual Classes Tab of the Classes Tab
    • The Field Mapper
    • Files Tab of the Project Properties Dialog Box
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • Procedures
    • Merge Sub-Projects into a New Project
    • Report Wizard
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Copy Cost Sets Dialog Box
    • Project Selection Page of the Calculate Forecast Wizard
    • Status Page of the Integration Wizard-Files
    • Recalc Preferences
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Supported Processes, Operations, and Data
    • Ancillary File Validations Page of the Validity Check Wizard
    • Create a New Class
    • Assign a Forecast Method to a Forecast Class
    • General Information Page of the New Class Wizard
    • Apportionment Setup Steps
    • Resource Assignments Page of the Integration Wizard-Files
    • Class Settings Page for Budget Class of the New Class Wizard
    • Display the New Project Wizard
    • Calendars
    • Cost Sets Page of the Report Wizard
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Class Overview
    • Classes Tab of the Project Properties Dialog Box
    • Project Selection Page of the Reclass Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Project Selection Page of the Freeze Forecast Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Connecting to the Cobra Web Service Host
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Procedures
    • Apportionment Process
    • Class Information Tags
    • Procedures
    • Target Class Page of the Reclass Wizard
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • XML Configuration File
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Control Account Fields Versus Codes
    • Class Settings Page for Earned Class of the New Class Wizard
    • Include in Earned Cost Set Page of the New Class Wizard
    • Resource Assignments
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Purge Dialog Box
    • Included Earned Classes Tab of the Classes Tab
    • Log Change Comment Dialog Box
    • Running the Process or Operation
    • Create a New Cost Set
    • Reclass Preferences
    • Creating Service Operations Classes
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Set Project Baseline Page of the Project Audit Wizard
    • Procedures
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • New Class Wizard
    • Recalc
    • Frozen Forecasts
    • Options Page of the Replan Wizard
    • XML Configuration Object Interface
    • Assign a Rate File to a Forecast Actual or Budget Class
    • Classes and Cost Sets
    • Status Page of the Integration Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Cobra Web Service
    • Filter by Classes or Cost Sets
    • Default Rates Page of the New Resource File Wizard
    • Process Lock
    • Options Page of the Calculate Forecast Wizard
    • Cost Sets Tab of the Project Properties Dialog Box
    • Entering Actual Costs Manually
    • Classes Page of the Respread Wizard
    • Include in Budget Cost Set Page of the New Class Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Cost Sets Page of the Freeze Forecast Wizard
    • Procedures
    • Calendar Sets
    • Associate an Actual Class with a Forecast Class
    • Resource Components
    • Ancillary Files Page of the New Project Wizard
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Included Costs Page of the Integration Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Reclass a Class
    • Fields Page of the New Project Wizard
  • class settings page
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Class Settings Page for Budget Class of the New Class Wizard
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Class Settings Page for Earned Class of the New Class Wizard
  • classes and cost sets
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Forecast Class Page of the New Class Wizard
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Delete a Cost Set
    • Copy Classes Dialog Box
    • Display the New Class Wizard
    • Included Actual Classes Tab of the Classes Tab
    • Procedures
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Copy Cost Sets Dialog Box
    • Create a New Class
    • Assign a Forecast Method to a Forecast Class
    • Class Settings Page for Budget Class of the New Class Wizard
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Procedures
    • Procedures
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • Class Settings Page for Earned Class of the New Class Wizard
    • Include in Earned Cost Set Page of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Included Earned Classes Tab of the Classes Tab
    • Create a New Cost Set
    • Procedures
    • Assign a Budget Source to a Budget Class
    • New Class Wizard
    • Assign a Rate File to a Forecast Actual or Budget Class
    • Include in Budget Cost Set Page of the New Class Wizard
    • Procedures
    • Associate an Actual Class with a Forecast Class
  • classes and cost sets
  • classes page
    • Classes Page of the Apportionment Calculation Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Classes Page of the Zero-Out Data Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Target Class Page of the Reclass Wizard
    • Classes Page of the Top-Down Planning Wizard
    • Classes Page of the Respread Wizard
    • Classes Page of the Recalc Wizard
  • classes tab
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Forecast Class Page of the New Class Wizard
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Delete a Cost Set
    • Copy Classes Dialog Box
    • Display the New Class Wizard
    • Included Actual Classes Tab of the Classes Tab
    • Procedures
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Copy Cost Sets Dialog Box
    • Create a New Class
    • Assign a Forecast Method to a Forecast Class
    • General Information Page of the New Class Wizard
    • Class Settings Page for Budget Class of the New Class Wizard
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Class Overview
    • Classes Tab of the Project Properties Dialog Box
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Procedures
    • Procedures
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • Class Settings Page for Earned Class of the New Class Wizard
    • Include in Earned Cost Set Page of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Included Earned Classes Tab of the Classes Tab
    • Create a New Cost Set
    • Procedures
    • Assign a Budget Source to a Budget Class
    • New Class Wizard
    • Assign a Rate File to a Forecast Actual or Budget Class
    • Include in Budget Cost Set Page of the New Class Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Procedures
    • Associate an Actual Class with a Forecast Class
  • cobra
    • Set Cobra to Always Run as an Administrator
    • Launching Cobra
  • cobra button
    • Keyboard Shortcuts
    • Preferences
    • Cobra Button
    • Manage
    • Help
  • cobra explorer
    • Code Assignments Tab of the Project Properties Dialog Box
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Confirmation Page of the New Project Wizard
    • Criteria Page of the Slip Wizard
    • Enable a User to Access a Resource File
    • Insert Column Dialog Box
    • Process Running Page of the Apportionment Calculation Wizard
    • Edit Tab of the Rate View
    • Process Running Page of the Reclass Wizard
    • Processes Tab
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Color Band
    • Rename Dialog Box
    • Process Complete Page of the Rolling Wave Wizard
    • Reorder Resources
    • Analyze Preferences
    • Delete a Cost Set
    • Process Complete Page of the Replan Wizard
    • Work Package Name Page of the Replan Wizard
    • Settings Page of the New Project Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Confirmation Page of the Calculate Progress Wizard
    • Confirmation Page of the New Resource File Wizard
    • Copy Project Codes Dialog Box
    • Spreadsheet Pane of the Project View
    • Perform Apportionment Mapping
    • Add a Child Resource to a Resource
    • Quick Access Toolbar
    • Copy Preferences Dialog Box
    • Process Running Page of the Advance Calendar Wizard
    • Thresholds Tab of the Code File Properties Dialog Box
    • Process Running Page of the Calculate Forecast Wizard
    • Projects Pane Column Definitions
    • Process Running Page of the Replan Wizard
    • Method Page of the Replan Wizard
    • Reorder Resources/Codes Dialog Box
    • Rates Pane Column Definitions
    • Advance to Period Page of the Advance Calendar Wizard
    • Display the Project Properties Dialog Box from an Open Project
    • Analyze Options Dialog Box
    • Batch Reports Pane Column Definitions
    • Rename an Ancillary File
    • Spread Budgets Using Pre-defined Spread Methods
    • Create a New Resource File
    • Display the Open File Dialog Box
    • Structure Tab of the Code File Properties Dialog Box
    • Resource File Security
    • Thresholds Tab of the Code View
    • Calculations Tab of the Resource View
    • Project Selection Page of the Respread Wizard
    • Batch Reports Pane
    • Merge Sub-Projects into a New Project
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Calendars Pane Column Definitions
    • Actual Costs Preferences
    • Personal Reports Pane
    • Preferences
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Remove Sub-Projects from a Master Project
    • Cobra Login Dialog Box
    • Process Complete Page of the Calculate Forecast Wizard
    • Copy Project Preferences
    • Cobra Views
    • Delete Calendar Sets
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Projects Pane
    • Copy Child Resources to a Resource
    • Access Control Tab of the Code File Properties Dialog Box
    • Change Password Dialog Box
    • Included Actual Classes Tab of the Classes Tab
    • Code Fields Page of the New Code File Wizard
    • Assign Control Account and Work Package Structures to a Project
    • Files Tab of the Project Properties Dialog Box
    • Edit Calendar Sets
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Process Complete Page of the Apportionment Calculation Wizard
    • Preferences Tab of the Project Properties Dialog Box
    • Confirmation Page of the Reclass Wizard
    • Edit Tab of the Calendar View
    • Project Selection Page of the Calculate Forecast Wizard
    • Project Selection Page of the Update Totals Wizard
    • Recalc Preferences
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Save As Dialog Box (Merging Projects)
    • Select the Level at Which to Capture Actual Costs
    • Ancillary File Validations Page of the Validity Check Wizard
    • Find Dialog Box
    • Cobra Button
    • Apportionment Dialog Box
    • Remove Sub-Projects from a Master Project
    • Assign a Forecast Method to a Forecast Class
    • General Information Page of the New Code File Wizard
    • Select EVMS Acceptance for a Project
    • Spreadsheet Pane Column Definitions
    • About Deltek Cobra Dialog Box
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Project Dates Page of the New Project Wizard
    • General Information Page of the New Class Wizard
    • Process Running Page of the Validity Check Wizard
    • Project Code Assignments Page of the New Project Wizard
    • Reports Pane Column Definitions
    • Custom Menu Tab
    • Display the New Project Wizard
    • Delete a Result from a Resource
    • Change Password Dialog Box
    • Save As Dialog Box (Ancillary Files)
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Explore Cobra
    • Classes Tab of the Project Properties Dialog Box
    • Confirmation Page of the New Calendar File Wizard
    • Project Selection Page of the Reclass Wizard
    • Process Running Page of the Slip Wizard
    • Access Control Page of the New Code File Wizard
    • Process Running Page of the Calculate Progress Wizard
    • Project Selection Page of the Freeze Forecast Wizard
    • Tools Tab
    • General Tab of the Resource File Properties Dialog Box
    • General Information Page of the New Calendar File Wizard
    • Order Resource Results Dialog Box
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Validations Page of the Validity Check Wizard
    • Open File Dialog Box
    • Open File Dialog Box
    • Delete a Resource from a Resource File
    • Codes Grid of the Code View
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Codes Pane
    • Code Fields Page of the New Resource File Wizard
    • Add Results to a Resource
    • Target Class Page of the Reclass Wizard
    • Copy Existing Cost Sets to a Project
    • Process Complete Page of the Reclass Wizard
    • Edit Tab of the Code View
    • Structure Tab of the Resource File Properties Dialog Box
    • Resources Pane Column Definitions
    • Code View
    • Lookup Dialog Box
    • Assign a Rate Set to a Result
    • Standard Dialog Boxes and Procedures
    • Thresholds Page of the New Resource File Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Enable a User to Access a Code File
    • Calendars Pane
    • Class Settings Page for Earned Class of the New Class Wizard
    • Display the Project Properties Dialog Box without Opening the Project
    • Codes Pane Column Definitions
    • Include in EAC Cost Set Page of the New Class Wizard
    • Notes Tab of the Resource View
    • Help
    • Purge Dialog Box
    • Included Earned Classes Tab of the Classes Tab
    • Contract Information Tab of the Project Properties Dialog Box
    • Flag Periods
    • SQL Command Utility Dialog Box
    • Process Running Page of the Freeze Forecast Wizard
    • Reclass Preferences
    • Periods Page of the New Calendar File Wizard
    • Rates Pane
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Keyboard Shortcuts
    • Adjust Budget Spreads Manually
    • Delete a Code
    • Confirmation Page of the Advance Calendar Wizard
    • Reconcile Milestone Weights
    • Create a New Code File
    • Access Control Page of the New Project Wizard
    • Save As Dialog Box (Projects)
    • Process Complete Page of the Advance Calendar Wizard
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • Criteria Selection Page of the Recalc Wizard
    • Run the SQL Command Utility
    • Enable a Group to Access a Calendar File
    • Edit Column Dialog Box
    • Copy Codes to Another Project
    • New File Dialog Box
    • Options Page of the Replan Wizard
    • Cobra 8.4 Help System
    • Enter Contract Information
    • Code File Structure Page of the New Code File Wizard
    • Delete an Existing Holiday from the Calendar
    • Shortcut Menu
    • Freeze a Forecast
    • Resources Pane
    • Perform Project Analysis
    • Sub-Projects Page of the New Project Wizard
    • Process Complete Page of the Recalc Wizard
    • Confirmation Page of the Replace Resources Wizard
    • Project Selection Page of the Calculate Progress Wizard
    • Thresholds Tab of the Resource View
    • Confirmation Page of the New Code File Wizard
    • Process Complete Page of the Validity Check Wizard
    • Earned Preferences
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Display the Open File Dialog Box
    • Confirmation Page of the Respread Wizard
    • Edit Tab of the Resource View
    • Reporting Tab
    • Access Control Tab of the Project Properties Dialog Box
    • Save As Dialog Box (Projects)
    • Resource Selection Page of the Replace Resources Wizard
    • Resource File Structure Page of the New Resource File Wizard
    • Slip a Project
    • Set Reporting Options
    • Criteria Page of the Reclass Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Cobra Login Dialog Box
    • New File Dialog Box
    • Process Complete Page of the Calculate Progress Wizard
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Process Complete Page of the Top-Down Planning Wizard
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Cost Sets Tab of the Project Properties Dialog Box
    • All Reports Pane
    • Select Files to Restore Dialog Box
    • Run the Rolling Wave Process
    • Confirmation Page of the Apportionment Calculation Wizard
    • Classes Page of the Respread Wizard
    • Select the Level at Which to Capture Actual Costs
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Display the Cobra Explorer Panes
    • Column Width Dialog Box
    • Calendar View
    • Advance the Calendar
    • Confirmation Page of the Validity Check Wizard
    • Confirmation Page of the Freeze Forecast Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Integration Tab
    • Cost Sets Page of the Freeze Forecast Wizard
    • Results Pane of the Analyze Form
    • Notes Tab of the Project View
    • Date Range Page of the Recalc Wizard
    • Add a Child Code to a Code
    • Save As Dialog Box (Ancillary Files)
    • Period Labels Page of the New Calendar File Wizard
    • Rename a Project
    • Options Page of the Advance Calendar Wizard
    • Edit Tab of the Project View
    • Reorder Codes
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Process Complete Page of the Slip Wizard
    • Access Control Page of the New Resource File Wizard
    • Reclass a Class
    • Fields Page of the New Project Wizard
  • cobra views
    • Insert Column Dialog Box
    • Rename Dialog Box
    • Projects Pane Column Definitions
    • Rates Pane Column Definitions
    • Batch Reports Pane Column Definitions
    • Batch Reports Pane
    • Calendars Pane Column Definitions
    • Personal Reports Pane
    • Cobra Login Dialog Box
    • Projects Pane
    • Change Password Dialog Box
    • Find Dialog Box
    • About Deltek Cobra Dialog Box
    • Reports Pane Column Definitions
    • Change Password Dialog Box
    • Save As Dialog Box (Ancillary Files)
    • Cobra Explorer
    • Open File Dialog Box
    • Open File Dialog Box
    • Codes Pane
    • Resources Pane Column Definitions
    • Lookup Dialog Box
    • Standard Dialog Boxes and Procedures
    • Calendars Pane
    • Codes Pane Column Definitions
    • Purge Dialog Box
    • Rates Pane
    • Save As Dialog Box (Projects)
    • Edit Column Dialog Box
    • New File Dialog Box
    • Resources Pane
    • Save As Dialog Box (Projects)
    • Cobra Login Dialog Box
    • New File Dialog Box
    • All Reports Pane
    • Display the Cobra Explorer Panes
    • Column Width Dialog Box
    • Save As Dialog Box (Ancillary Files)
  • cobra web service
    • Grant the Service Account Access to the Database
    • Cobra Web Service Instance Settings
    • Remove the Cobra Web Service Host from Windows Services
    • Provide Access to the [NT AuthoritySystem] User to the Database
    • The encryption type requested is not supported by the KDC
    • Configure a New Instance
    • Enable the WCF Trace Log
    • Configure the Cobra Web Service Instances and/or Gateway using Cobra Web Service Management Tool
    • Deploy the Cobra Web Service ClientAPI
    • Configure the Gateway
    • The encryption type requested is not supported by the KDC
    • Uninstall an Instance or the Gateway
    • Troubleshooting Cobra Web Service Issues
    • Cobra Web Service Management Tool
    • Configuring the Cobra Web Service to Use Secure Socket Layers
    • Cobra Web Service Log
    • Cobra Web Service Management Tool Interface
    • Bind the Windows Server Certificate to the Cobra Web Service HTTPS Ports
    • Stop an Instance or the Gateway
    • The encryption type requested is not supported by the KDC
    • Procedures
    • Deltek Products That Utilize the Cobra Web Service
    • Right Pane of the Cobra Web Service Management Tool
    • Using the Cobra Web Service ClientAPI in Your Application
    • Run the SampleClientAPI Files
    • Enable the WCF Trace Log
    • Explaining the SampleClientAPI Code
    • Obtain the Authentication Certificate Information on the Cobra Web Service Machines
    • Left Pane of the Cobra Web Service Management Tool
    • Create a Service Account for the Cobra Web Service
    • The encryption type requested is not supported by the KDC
    • Create a Sample Actual Cost Integration File
    • Deploy the Cobra Web Service Host
    • The encryption type requested is not supported by the KDC
    • Restart an Instance or the Gateway
    • Cobra Web Service ClientAPI Example
    • Configure the Cobra Web Service When Using Windows Authentication
    • Cobra Web Service Gateway Settings
  • code
    • Performance Data Page of the wInsight Wizard
    • Code Assignments Tab of the Project Properties Dialog Box
    • Import File Field Mapper Page of the Integration Wizard
    • Rename Work Package Dialog Box
    • Display the Code View using the Codes Group Bar
    • Application Preferences
    • Add a Note to a Code
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Rename Dialog Box
    • Add Work Package Dialog Box
    • Reorder Resources
    • Preparing the Primavera Schedule
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Copy Work Package Dialog Box
    • Results Page of the ANSI EIA X12 Wizard
    • Copy Project Codes Dialog Box
    • Spreadsheet Pane of the Project View
    • Explanation of Variance Narrative Tags
    • Thresholds Tab of the Code File Properties Dialog Box
    • Report Criterion Parameters
    • Get Cobra Spread Process
    • Copy Control Account Dialog Box
    • Reorder Resources/Codes Dialog Box
    • Use a Code File in Multiple Projects
    • Work Package Codes Page of the wInsight Wizard
    • Validity Check Process
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Structure Tab of the Code File Properties Dialog Box
    • Sub-Totals Page of the Report Wizard
    • Thresholds Tab of the Code View
    • Calculations Tab of the Resource View
    • Variance Thresholds
    • Reporting
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Copy Down Code Assignments to Child Resources
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • New Filter Expression Dialog Box of the Report Wizard
    • Display the Code View using the Cobra Button
    • Integration Wizard
    • Access Control Tab of the Code File Properties Dialog Box
    • Date Selection Page of the Integration Wizard-Open Plan
    • Add a Code to a Code File
    • Export Structures Page of the wInsight Wizard
    • Code Fields Page of the New Code File Wizard
    • Copy Down Threshold Values to Child Codes
    • The Field Mapper
    • Files Tab of the Project Properties Dialog Box
    • Procedures
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Add Control Account Dialog Box
    • Resources and Rates Page of the Integration Wizard
    • Rename Control Account Dialog Box
    • Report Categories
    • Security Options for the Analyze Process
    • Integration Tab of the Application Preferences Dialog Box
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Ancillary File Validations Page of the Validity Check Wizard
    • General Information Page of the New Code File Wizard
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Resources
    • Data Import-Ancillary Data
    • Project Code Assignments Page of the New Project Wizard
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Display the New Project Wizard
    • Variance Thresholds
    • Required Template Files
    • Save As Dialog Box (Ancillary Files)
    • Manage Sorts Dialog Box of the Report Wizard
    • Resource File Information Tags
    • Copy Child Codes to a Code
    • Import File Validation
    • File Selection Page of the Integration Wizard
    • Filter Page of the Integration Wizard-Files
    • Project Selection Page of the Reclass Wizard
    • Access Control Page of the New Code File Wizard
    • Master Project Versus Individual Projects
    • Custom Cost Classes
    • Open File Dialog Box
    • Copy Down Code Assignments to Child Codes
    • Codes and the Integration Wizard
    • Open File Dialog Box
    • Class Information Tags
    • Codes Grid of the Code View
    • Code Fields Page of the New Resource File Wizard
    • Report Types
    • Data Import Using Scheduling Tools and Files
    • Code View
    • Structures Section of the XML File
    • XML Configuration File
    • Lookup Dialog Box
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Control Account Fields Versus Codes
    • Results Tab of the Resource File Properties Dialog Box
    • Enable a User to Access a Code File
    • Set Threshold Values for a Code
    • Move Work Package Dialog Box
    • Purge Dialog Box
    • Cobra Components
    • Log Change Comment Dialog Box
    • Delete a Code
    • Create a New Code File
    • Criteria Selection Page of the Recalc Wizard
    • Resources and Code Files
    • Types of Code Files
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • Code File Security
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Copy Codes to Another Project
    • Export Structures Page of the ANSI EIA X12 Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • New File Dialog Box
    • Code File Structure Page of the New Code File Wizard
    • Data Import-Actual Costs
    • Shortcut Menu
    • Perform Project Analysis
    • Codes Page of the Integration Wizard-MS Project
    • Code File Structures
    • Validate Code Assignments — Solve Roll-Up Issues
    • Confirmation Page of the New Code File Wizard
    • Loading Resource Files from Open Plan
    • Resource Calculation Tags
    • Resources
    • Resource File Structure Page of the New Resource File Wizard
    • Criteria Page of the Reclass Wizard
    • Codes
    • Filter Page of the Integration Wizard
    • Resource Tags
    • New File Dialog Box
    • Loading Resource Files from Open Plan
    • Code Usage in Cobra
    • Codes Page of the Integration Wizard-Open Plan
    • Results Pane of the Analyze Form
    • SQL Language Extended Support
    • Data Formats
    • Add a Child Code to a Code
    • Save As Dialog Box (Ancillary Files)
    • Resource Components
    • Options Page of the Advance Calendar Wizard
    • Reorder Codes
    • Add Resource Results Dialog Box
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Set Up Projects and Project Baselines
    • Fields Page of the New Project Wizard
  • code assignment
    • Code Assignments Tab of the Project Properties Dialog Box
    • Copy Project Codes Dialog Box
    • Procedures
    • Copy Codes to Another Project
    • Assign Codes to a Project
  • code assignments tab
  • code edit tab
  • code fields page
    • Code Fields Page of the New Code File Wizard
    • Code Fields Page of the New Rate File Wizard
    • Code Fields Page of the New Resource File Wizard
  • code fields tab
    • Code Fields Tab of the Resource File Properties Dialog Box
    • Code Fields Tab of the Code File Properties Dialog Box
    • Code Fields Tab of the Rate File Properties Dialog Box
  • code file
    • Code Assignments Tab of the Project Properties Dialog Box
    • Rename Work Package Dialog Box
    • Add a Note to a Code
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Reorder Resources
    • Action Selection Page of the Integration Wizard
    • Copy Work Package Dialog Box
    • Spreadsheet Pane of the Project View
    • Thresholds Tab of the Code File Properties Dialog Box
    • Copy Control Account Dialog Box
    • Reorder Resources/Codes Dialog Box
    • Use a Code File in Multiple Projects
    • Validity Check Process
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Structure Tab of the Code File Properties Dialog Box
    • Sub-Totals Page of the Report Wizard
    • Thresholds Tab of the Code View
    • Reporting
    • Thresholds Page of the New Code File Wizard
    • Projects
    • Access Control Tab of the Code File Properties Dialog Box
    • Add a Code to a Code File
    • Export Structures Page of the wInsight Wizard
    • Code Fields Page of the New Code File Wizard
    • Copy Down Threshold Values to Child Codes
    • The Field Mapper
    • Files Tab of the Project Properties Dialog Box
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Add Control Account Dialog Box
    • Resources and Rates Page of the Integration Wizard
    • Rename Control Account Dialog Box
    • Report Categories
    • Enable a Group to Access a Code File
    • Ancillary File Validations Page of the Validity Check Wizard
    • General Information Page of the New Code File Wizard
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Resources
    • Project Code Assignments Page of the New Project Wizard
    • Display the New Project Wizard
    • Required Template Files
    • Resource File Information Tags
    • Access Control Page of the New Code File Wizard
    • Custom Cost Classes
    • Codes and the Integration Wizard
    • Class Information Tags
    • Codes Grid of the Code View
    • Code Fields Page of the New Resource File Wizard
    • Report Types
    • Data Import Using Scheduling Tools and Files
    • Code View
    • Structures Section of the XML File
    • XML Configuration File
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Enable a User to Access a Code File
    • Set Threshold Values for a Code
    • Move Work Package Dialog Box
    • Purge Dialog Box
    • Delete a Code
    • Create a New Code File
    • Resources and Code Files
    • Types of Code Files
    • Additional Project Files
    • Export Structures Page of the ANSI EIA X12 Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Code File Structure Page of the New Code File Wizard
    • Shortcut Menu
    • Codes Page of the Integration Wizard-MS Project
    • Code File Structures
    • Validate Code Assignments — Solve Roll-Up Issues
    • Confirmation Page of the New Code File Wizard
    • Notes Tab of the Code View
    • Loading Resource Files from Open Plan
    • Resources
    • Criteria Page of the Reclass Wizard
    • Codes
    • Loading Resource Files from Open Plan
    • Codes Page of the Integration Wizard-Open Plan
    • Add a Child Code to a Code
    • Reorder Codes
    • Set Up Projects and Project Baselines
    • Fields Page of the New Project Wizard
  • code file properties
    • General Tab of the Code File Properties Dialog Box
    • Code File Properties Dialog Box
    • Display the Code File Properties Dialog Box Tabs without Opening a Code File
    • Display the Code File Properties Dialog Box Tabs from an Open Code File
    • Procedures
  • code file properties dialog box
    • Thresholds Tab of the Code File Properties Dialog Box
    • Structure Tab of the Code File Properties Dialog Box
    • Access Control Tab of the Code File Properties Dialog Box
    • Enable a Group to Access a Code File
    • Code Fields Tab of the Code File Properties Dialog Box
    • Enable a User to Access a Code File
    • Shortcut Menu
  • code file structure page
  • code view
    • Procedures
    • Display the Code View using the Codes Group Bar
    • Add a Note to a Code
    • Thresholds Tab of the Code File Properties Dialog Box
    • Reorder Resources/Codes Dialog Box
    • Structure Tab of the Code File Properties Dialog Box
    • Thresholds Tab of the Code View
    • Display the Code View using the Cobra Button
    • Access Control Tab of the Code File Properties Dialog Box
    • Copy Down Threshold Values to Child Codes
    • Enable a Group to Access a Code File
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Copy Child Codes to a Code
    • Copy Down Code Assignments to Child Codes
    • Codes Grid of the Code View
    • Code View
    • Procedures
    • Enable a User to Access a Code File
    • Set Threshold Values for a Code
    • Delete a Code
    • Notes Tab of the Code View
    • Add a Child Code to a Code
    • Reorder Codes
  • coded ranges
    • Coded Ranges Method
    • Forecast Class Page of the New Class Wizard
  • codes
    • Code Assignments Tab of the Project Properties Dialog Box
    • Code the Resources for IPMR Format 2 Reports
    • Codes and the Report Wizard
    • Copy Down Codes Dialog Box
    • Copy Children Dialog Box
    • Copy Down Codes Dialog Box
    • Copy Children Dialog Box
    • Copy Codes to Another Project
    • Procedures
    • Assign Codes to a Project
  • codes and structures page
  • codes grid
    • Codes Grid of the Code View
    • Shortcut Menu
    • Add a Child Code to a Code
  • codes page
    • Codes Page of the Integration Wizard
    • Codes Page of the Integration Wizard-Primavera
    • Codes Page of the Integration Wizard-MS Project
    • Codes Page of the Integration Wizard-Open Plan
  • codes pane
    • Codes Pane
    • Codes Pane Column Definitions
    • Shortcut Menu
  • codes tab
  • column
    • Code Assignments Tab of the Project Properties Dialog Box
    • Import File Field Mapper Page of the Integration Wizard
    • Insert Column Dialog Box
    • IPMR Format 2 Summary Page of the Report Wizard
    • Resource Assignment Percent Complete Dialog Box
    • Add Work Package Dialog Box
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Analyze Preferences
    • Report Template Format
    • Data Dictionary
    • Spreadsheet Pane of the Project View
    • Audit Log Comparison Page of the Project Audit Wizard
    • Copy Preferences Dialog Box
    • Report Criterion Parameters
    • File Format for Importing Apportionment Mapping
    • Work Package Codes Page of the wInsight Wizard
    • Analyze Options Dialog Box
    • Class and Results Page of the Integration Wizard
    • Personal Reports Pane
    • Copy Down Code Assignments to Child Resources
    • New Filter Expression Dialog Box of the Report Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Code Fields Page of the New Code File Wizard
    • The Field Mapper
    • Field Mapper Page of the Integration Wizard
    • Remove a Column from a View
    • Add Control Account Dialog Box
    • Status Page of the Integration Wizard-Files
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Spreadsheet Pane Column Definitions
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Calendars
    • Insert a Column in a View
    • Codes Grid of the Code View
    • Code Fields Page of the New Resource File Wizard
    • Report Types
    • Integration Configuration Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Adjust Budget Spreads Manually
    • Edit Exported Data in Excel
    • Formula Tags
    • Configuration Security Dialog Box
    • Edit Column Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Resources Pane
    • Planning Reports
    • Earned Preferences
    • New Sort Expression Dialog Box of the Report Wizard
    • Status Page of the Integration Wizard
    • Milestones/Steps Tab of the Project View
    • Cost Sets Tab of the Project Properties Dialog Box
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Process Logs Dialog Box
    • Calendar View
    • Results Pane of the Analyze Form
    • Data Formats
    • Adjust Column Width
    • Calendar Sets
    • Column Reports
    • Add Resource Results Dialog Box
    • Time-phased Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Results or Field Names
    • Fields Page of the New Project Wizard
  • command line parameters
    • Pass Command Line Parameters using the New Application Shortcut
    • Running Cobra with Command Line Parameters
    • Running Cobra with Command Line Parameters
    • Running Cobra with Command Line Parameters
  • concurrency
    • The server was unable to process the request due to an internal error
    • Data Access Tab of the Application Preferences Dialog Box
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • Use the Process Queue Manager form in PM Compass to Check Job Status
    • View Job Status and Process Logs
    • The encryption type requested is not supported by the KDC
    • Use the Process Queue Manager form in PM Compass to Check Job Status
    • Concurrent Apportionment Calculations
    • The server was unable to process the request due to an internal error
    • The server was unable to process the request due to an internal error
    • The encryption type requested is not supported by the KDC
    • Troubleshooting Concurrency Issues
    • Use the Process Queue Manager form in PM Compass to Check Job Status
    • Troubleshooting Cobra Web Service Issues
    • Run Page of the Calculate Progress Wizard
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • Concurrent Progress Calculations
    • The encryption type requested is not supported by the KDC
    • Concurrency in Cobra
    • Run Page of the Calculate Forecast Wizard
    • Troubleshooting Concurrency Issues
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • Run Concurrent Progress Calculations
    • The server was unable to process the request due to an internal error
    • View Job Status and Process Logs in PM Compass
    • View Job Status and Process Logs in Cobra
    • Troubleshooting Concurrency Issues
    • Concurrent Forecast Calculations
    • Troubleshooting Concurrency Issues
    • The encryption type requested is not supported by the KDC
    • The encryption type requested is not supported by the KDC
    • Run Concurrent Forecast Calculations
    • Use the Process Queue Manager form in PM Compass to Check Job Status
  • concurrent
    • Load an Import File with Multiple Projects Concurrently
    • Multi-Project Concurrent Integration
    • Run Concurrent Apportionment Calculations
    • Run Page of the Apportionment Calculation Wizard
  • configuration
    • Confirmation Page of the Integration Wizard
    • Configuration Security
    • Save and Load Page of the Integration Wizard
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Process Running Page of the wInsight Wizard
    • Reporting
    • Back Up Your Data
    • Integration Configuration Page of the Integration Wizard
    • Deploy the Cobra Web Service ClientAPI
    • Results Page of the Integration Wizard
    • Select Configuration Page of the Update Open Plan Resources Wizard
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
    • Hook Program Methods
    • Integrate Ancillary Data Process
    • Filter Page of the Integration Wizard-Files
    • Create Project from Template Process
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Integration Configuration Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Data Import Using Scheduling Tools and Files
    • XML Configuration File
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
    • Configuration Page of the wInsight Wizard
    • Integration Configuration Page of the Integration Wizard
    • Running the Process or Operation
    • wInsight Database Page of the wInsight Wizard
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Configuration Security Dialog Box
    • Cobra 8.4 Help System
    • XML Configuration Object Interface
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Filter Page of the Integration Wizard
    • API Script to Create a New Project from a Project Template
  • configuration page
  • configuration security
  • configuration security dialog box
  • configuration selection page
  • configurations
  • configure dialog box
  • confirmation page
    • Confirmation Page of the Integration Wizard
    • Confirmation Page of the New Project Wizard
    • Confirmation Page of the Slip Wizard
    • Confirmation Page of the Calculate Progress Wizard
    • Confirmation Page of the New Resource File Wizard
    • Confirmation Page of the Report Wizard
    • Confirmation Page of the Update Codes Wizard
    • Confirmation Page of the Add Rate Set Wizard
    • Confirmation Page of the Top-Down Planning Wizard
    • Confirmation Page of the Replan Wizard
    • Confirmation Page of the Reclass Wizard
    • Confirmation Page of the ANSI EIA X12 Wizard
    • Confirmation Page of the Assignment Import/Export Wizard
    • Confirmation Page of the Update Totals Wizard
    • Confirmation Page of the Integration Wizard
    • Confirmation Page of the New Calendar File Wizard
    • Confirmation Page of the New Class Wizard
    • Confirmation Page of the Rolling Wave Wizard
    • Confirmation Page of the Advance Calendar Wizard
    • Confirmation Page of the Zero-Out Data Wizard
    • Confirmation Page of the New Rate File Wizard
    • Confirmation Page of the Cost Data Wizard
    • Confirmation Page of the Replace Resources Wizard
    • Confirmation Page of the New Code File Wizard
    • Confirmation Page of the Project Audit Wizard
    • Confirmation Page of the Respread Wizard
    • Confirmation Page of the Calculate Forecast Wizard
    • Confirmation Page of the wInsight Wizard
    • Confirmation Page of the Recalc Wizard
    • Confirmation Page of the Update Open Plan Resources Wizard
    • Confirmation Page of the Apportionment Calculation Wizard
    • Confirmation Page of the Integration Wizard
    • Confirmation Page of the Validity Check Wizard
    • Confirmation Page of the Freeze Forecast Wizard
    • Confirmation Page of the Export Calendar to Open Plan Wizard
    • Confirmation Page of the Integration Wizard
    • Confirmation Page of the Align Time-phased Dates Wizard
  • connection selection page
  • control account
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Rename Work Package Dialog Box
    • Criteria Page of the Slip Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • Code Files
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Color Band
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Preparing the Primavera Schedule
    • Report Template Format
    • Work Package Name Page of the Replan Wizard
    • Rename a Work Package
    • Settings Page of the New Project Wizard
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Copy Work Package Dialog Box
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Baseline Tags
    • Perform Apportionment Mapping
    • Copy Control Account Dialog Box
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Validity Check Process
    • Sub-Totals Page of the Report Wizard
    • Class and Results Page of the Integration Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Actual Costs Preferences
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • Export and Import Time-Phased Resource Assignments
    • New Filter Expression Dialog Box of the Report Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Calculated Fields
    • The Field Mapper
    • Assign Control Account and Work Package Structures to a Project
    • Files Tab of the Project Properties Dialog Box
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • Add a New Work Package using the Dialog Box
    • EPM Security Administrator Functions
    • Add Control Account Dialog Box
    • Rename Control Account Dialog Box
    • Project Selection Page of the Update Totals Wizard
    • Adding a New Control Account
    • Recalc Preferences
    • Security Options for the Analyze Process
    • Integration Tab of the Application Preferences Dialog Box
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Supported Processes, Operations, and Data
    • Update EAC Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Prompt Level Page of the Project Audit Wizard
    • Spreadsheet Pane Column Definitions
    • Resources
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Cost Sets Page of the Report Wizard
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Copy a Work Package
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Control Accounts and Work Packages
    • Import File Validation
    • Import Location Page of the Assignment Import Wizard
    • Filter Page of the Integration Wizard-Files
    • Project Selection Page of the Reclass Wizard
    • Notes Page of the Integration Wizard
    • New Calculated Field Dialog Box
    • Master Project Versus Individual Projects
    • Progress Techniques
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • Calculated Field Expression Dialog Box
    • Codes and the Integration Wizard
    • Report Types
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Display the Rename Control Account Dialog Box
    • Lookup Dialog Box
    • Move a Control Account
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Display the Copy Control Account Dialog Box
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Rename a Control Account
    • Control Account Fields Versus Codes
    • Calculated Fields Dialog Box
    • Move Work Package Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • Resource Assignments
    • Forecast Calculations
    • Purge Dialog Box
    • Log Change Comment Dialog Box
    • Reclass Preferences
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Add a New Control Account using the Dialog Box
    • Reconcile Milestone Weights
    • Integration Wizard Preferences
    • Criteria Selection Page of the Recalc Wizard
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Export Structures Page of the ANSI EIA X12 Wizard
    • Display the Move Control Account Dialog Box
    • Options Page of the Replan Wizard
    • Change Management Tags
    • Data Import-Actual Costs
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Fields Dialog Box
    • Perform Project Analysis
    • Validate Code Assignments — Solve Roll-Up Issues
    • Considerations When Creating Field Names
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Resources
    • Slip a Project
    • Criteria Page of the Reclass Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Filter Page of the Integration Wizard
    • Control Account and Work Package Note Tags
    • Cobra Web Service
    • Process Lock
    • Options Page of the Calculate Forecast Wizard
    • Process Logs Dialog Box
    • Update Totals Process
    • Select the Level at Which to Capture Actual Costs
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
    • Notes Tab of the Project View
    • Data Formats
    • Column Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Included Costs Page of the Integration Wizard
    • Manual Forecasts
    • Set Up Projects and Project Baselines
    • Fields Page of the New Project Wizard
  • control account codes page
  • control account manager
    • Import File Field Mapper Page of the Integration Wizard
    • Criteria Page of the Replan Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Criteria Selection Page of the Respread Wizard
    • Criteria Selection Page of the Recalc Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • General Tab of the Project View
    • Criteria Page of the Reclass Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
    • Schedule Mapping Page of the Integration Wizard-MS Project
  • copy
  • copy batch report
  • copy batch report dialog box
    • Copy Batch Report Dialog Box
    • Display the Copy Batch Report Dialog Box
  • copy child resources
  • copy children
    • Copy Children Dialog Box
    • Copy Children Dialog Box
  • copy children dialog box
    • Display the Copy Children Dialog Box
    • Copy Children Dialog Box
    • Copy Children Dialog Box
    • Display the Copy Children Dialog Box
  • copy class
  • copy control account dialog box
  • copy down codes
    • Copy Down Codes Dialog Box
    • Copy Down Codes Dialog Box
  • copy down codes dialog box
    • Copy Down Codes Dialog Box
    • Display the Copy Down Codes Dialog Box
    • Copy Down Codes Dialog Box
    • Display the Copy Down Codes Dialog Box
  • copy filter dialog box
  • copy project codes dialog box
  • copy resource calculation
  • copy resource calculation dialog box
    • Copy Resource Calculations Dialog Box
    • Display the Copy Resource Calculations Dialog Box
  • copy sort dialog box
  • copy threshold values
  • copy work package
  • copy work package dialog box
  • cost
    • Performance Data Page of the wInsight Wizard
    • Milestones/Steps
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • Code Files
    • Log Transaction Page of the Project Audit Wizard
    • Spread Curves Tab of the Application Preferences Dialog Box
    • First Result and Derived Costs
    • Preparing the Primavera Schedule
    • Report Template Format
    • Delete a Cost Set
    • Settings Page of the New Project Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Results Page of the ANSI EIA X12 Wizard
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Baseline Tags
    • Thresholds Tab of the Code File Properties Dialog Box
    • Get Cobra Spread Process
    • Validity Check Process
    • Analyze Options Dialog Box
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Thresholds Tab of the Code View
    • Class and Results Page of the Integration Wizard
    • Variance Thresholds
    • Project Selection Page of the Respread Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Actual Costs Preferences
    • Projects
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Cost Set Information Tags
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Statistical Forecasts
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • EPM Security Administrator Functions
    • Project Selection Page of the Update Totals Wizard
    • Report Categories
    • Recalc Preferences
    • Integration Tab of the Application Preferences Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Spreadsheet Pane Column Definitions
    • Resources
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Calendars
    • Cost Sets Page of the Report Wizard
    • Variance Thresholds
    • Calculate Progress
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Project Selection Page of the Freeze Forecast Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Custom Cost Classes
    • Apportionment Process
    • Report Types
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Copy Existing Cost Sets to a Project
    • Data Import Using Scheduling Tools and Files
    • Structures Section of the XML File
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • Resource Assignments
    • Include in EAC Cost Set Page of the New Class Wizard
    • Forecast Calculations
    • Contract Information Tab of the Project Properties Dialog Box
    • Flag Periods
    • Reclass Preferences
    • Set Project Baseline Page of the Project Audit Wizard
    • Adjust Budget Spreads Manually
    • Criteria Selection Page of the Recalc Wizard
    • Resources and Code Files
    • Element of Cost Page of the wInsight Wizard
    • Recalc
    • Frozen Forecasts
    • Options Page of the Replan Wizard
    • Change Management Tags
    • Cobra 8.4 Help System
    • Data Import-Actual Costs
    • Retain EAC
    • Resources Pane
    • Examples of Statistical Forecast Calculations
    • Process Complete Page of the Recalc Wizard
    • Thresholds Tab of the Resource View
    • Earned Preferences
    • Resources
    • Project Selection Page of the Top-Down Planning Wizard
    • Codes
    • Process Lock
    • Options Page of the Calculate Forecast Wizard
    • Cost Sets Tab of the Project Properties Dialog Box
    • Entering Actual Costs Manually
    • Include in Budget Cost Set Page of the New Class Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
    • Results Pane of the Analyze Form
    • Date Range Page of the Recalc Wizard
    • Calendar Sets
    • Resource Components
    • Column Reports
    • Ancillary Files Page of the New Project Wizard
    • Time-phased Reports
    • Results or Field Names
    • Control Account Versus Work Package Level
    • Included Costs Page of the Integration Wizard
    • Set Up Projects and Project Baselines
    • Reclass a Class
  • cost data
    • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
    • Cost Data Export
  • cost data export
    • Export Structures Page of the Cost Data Wizard
    • Cost Sets Page of the Cost Data Wizard
    • Export Cost Data
    • Cost Data Export Process
    • Process Complete Page of the Cost Data Wizard
    • Procedures
    • Project and Format Page of the Cost Data Wizard
    • Data Options Page of the Cost Data Wizard
    • Integration Tab of the Application Preferences Dialog Box
    • Configuration Selection Page of the Cost Data Wizard
    • Cost Data Export
    • Confirmation Page of the Cost Data Wizard
    • Access Control Page of the Cost Data Wizard
    • Process Logs Dialog Box
    • Save and Run Page of the Cost Data Wizard
  • cost data wizard
    • Configuration Security
    • Export Structures Page of the Cost Data Wizard
    • Cost Sets Page of the Cost Data Wizard
    • Export Cost Data
    • Cost Data Export Process
    • Process Complete Page of the Cost Data Wizard
    • Procedures
    • Project and Format Page of the Cost Data Wizard
    • Data Options Page of the Cost Data Wizard
    • Configuration Selection Page of the Cost Data Wizard
    • Cost Data Wizard
    • Codes and Structures Page of the Cost Data Wizard
    • Configuration Security Dialog Box
    • Confirmation Page of the Cost Data Wizard
    • Access Control Page of the Cost Data Wizard
    • Process Running Page of the Cost Data Wizard
    • Save and Run Page of the Cost Data Wizard
  • cost set
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Report Template Format
    • Delete a Cost Set
    • Validity Check Process
    • Sub-Totals Page of the Report Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Cost Set Information Tags
    • General Tab of the Application Preferences Dialog Box
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Project Selection Page of the Update Totals Wizard
    • Cost Sets Page of the Report Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Project Selection Page of the Freeze Forecast Wizard
    • Custom Cost Classes
    • Report Types
    • Copy Existing Cost Sets to a Project
    • Class Settings Page for Earned Class of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Add a Class to a Cost Set
    • Frozen Forecasts
    • Classes and Cost Sets
    • Options Page of the Calculate Forecast Wizard
    • Cost Sets Tab of the Project Properties Dialog Box
    • Include in Budget Cost Set Page of the New Class Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
    • Column Reports
    • Time-phased Reports
  • cost sets page
    • Cost Sets Page of the Cost Data Wizard
    • Cost Sets Page of the Report Wizard
    • Cost Sets Page of the wInsight Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
  • cost sets tab
  • costs
  • criteria page
    • Criteria Page of the Slip Wizard
    • Criteria Page of the Replan Wizard
    • Criteria Page of the Update Open Plan Resources Wizard
    • Criteria Page of the Reclass Wizard
  • criteria selection page
    • Criteria Selection Page of the Respread Wizard
    • Criteria Selection Page of the Recalc Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Criteria Selection Page of the Zero-Out Data Wizard
    • Criteria Selection Page of the Freeze Forecast Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
  • currency
    • Performance Data Page of the wInsight Wizard
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Report Template Format
    • Settings Page of the New Project Wizard
    • Spreadsheet Pane of the Project View
    • Calculations Tab of the Resource View
    • Update EAC Dialog Box
    • Spreadsheet Pane Column Definitions
    • Miscellaneous Page of the wInsight Wizard
    • Required Template Files
    • Resource File Information Tags
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Custom Cost Classes
    • XML Configuration File
    • Results Tab of the Resource File Properties Dialog Box
    • Log Operation Page of the Project Audit Wizard
    • Set Project Baseline Page of the Project Audit Wizard
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • Earned Preferences
    • Resource Calculation Tags
    • Style Page of the Report Wizard
    • Options Page of the Calculate Forecast Wizard
    • Resource Components
    • Add Resource Results Dialog Box
    • Results or Field Names
  • custom hooks
    • Application Preferences
    • General Tab of the Application Preferences Dialog Box
    • Integration Tab of the Application Preferences Dialog Box
    • Hook Program Methods
    • MsgLogger Object Interface
    • XML Configuration File
    • Customization of Integration Process
    • XML Configuration Object Interface
    • Customization of Processes
    • Custom Hooks
  • custom menu tab
  • custom table
  • data
    • Data Tool
    • Performance Data Page of the wInsight Wizard
    • Confirmation Page of the Integration Wizard
    • Code Assignments Tab of the Project Properties Dialog Box
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Create Windows Shortcut for the API Script
    • Application Preferences
    • Insert Column Dialog Box
    • Save and Load Page of the Integration Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • SQL Command Utility
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Process Running Page of the wInsight Wizard
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Preparing the Primavera Schedule
    • Report Template Format
    • Process Logs
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Data Dictionary
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Results Page of the ANSI EIA X12 Wizard
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Process Running Page of the Project Audit Wizard
    • Perform Apportionment Mapping
    • Report Criterion Parameters
    • File Format for Importing Apportionment Mapping
    • Use a Code File in Multiple Projects
    • Work Package Codes Page of the wInsight Wizard
    • Validity Check Process
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Class and Results Page of the Integration Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Back Up Your Data
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Integration Wizard
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Results Page of the Integration Wizard
    • Process Complete Page of the ANSI EIA X12 Wizard
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • EPM Security Administrator Functions
    • Confirmation Page of the ANSI EIA X12 Wizard
    • Resources and Rates Page of the Integration Wizard
    • Project Selection Page of the Calculate Forecast Wizard
    • Project Selection Page of the Update Totals Wizard
    • Status Page of the Integration Wizard-Files
    • Report Categories
    • Integration Tab of the Application Preferences Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • File Format for Importing Status Information
    • General Information Page of the New Code File Wizard
    • Select Configuration Page of the Update Open Plan Resources Wizard
    • Data Import-Ancillary Data
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Set the Date Format
    • Calendars
    • Actual Cost Import File
    • Cost Sets Page of the Report Wizard
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
    • Data Import-Budget Data
    • Manage Sorts Dialog Box of the Report Wizard
    • Hook Program Methods
    • Insert a Column in a View
    • Import File Validation
    • File Selection Page of the Integration Wizard
    • Integrate Ancillary Data Process
    • Filter Page of the Integration Wizard-Files
    • Notes Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • SQL Command Process
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • Apportionment Process
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Report Types
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • User Preferences Dialog Box
    • Integration Configuration Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Data Import Using Scheduling Tools and Files
    • Code View
    • XML Configuration File
    • Process Running Page of the ANSI EIA X12 Wizard
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
    • Custom Project Tables
    • Sample Earned Value Calculation
    • Configuration Page of the wInsight Wizard
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Results Tab of the Resource File Properties Dialog Box
    • Forecast Calculations
    • Template Resource Files
    • Calendar Page of the Integration Wizard
    • Import Budget Data into Cobra
    • Log Operation Page of the Project Audit Wizard
    • Customization of Integration Process
    • Flag Periods
    • Log Change Comment Dialog Box
    • Data Import from Primavera
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • wInsight Database Page of the wInsight Wizard
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Save As Dialog Box (Projects)
    • Integration Wizard Preferences
    • Edit Exported Data in Excel
    • Copy Project Process
    • Element of Cost Page of the wInsight Wizard
    • Edit Column Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Export Structures Page of the ANSI EIA X12 Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Options Page of the Replan Wizard
    • Cobra 8.4 Help System
    • Shortcut Menu
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Codes Page of the Integration Wizard-MS Project
    • Project Selection Page of the Calculate Progress Wizard
    • XML Configuration Object Interface
    • Validate Code Assignments — Solve Roll-Up Issues
    • Process Log Viewer
    • New Sort Expression Dialog Box of the Report Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Status Page of the Integration Wizard
    • Save As Dialog Box (Projects)
    • Style Page of the Report Wizard
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Codes
    • Filter Page of the Integration Wizard
    • Default Rates Page of the New Resource File Wizard
    • Process Complete Page of the wInsight Wizard
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Run the Rolling Wave Process
    • Process Logs Dialog Box
    • Manage Filters Dialog Box of the Report Wizard
    • Codes Page of the Integration Wizard-Open Plan
    • Data Formats
    • Date Range Page of the Recalc Wizard
    • Calendar Sets
    • Resource Components
    • Customization of Processes
    • Options Page of the Advance Calendar Wizard
    • Column Reports
    • Shortcut Menu
    • Ancillary Files Page of the New Project Wizard
    • Time-phased Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Reports Tab of the Application Preferences Dialog Box
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Included Costs Page of the Integration Wizard
    • Set Up Projects and Project Baselines
    • Report Templates
  • data conversion
  • data export
    • SQL Command Utility
    • Narrative Export Process
    • Export Structures Page of the Cost Data Wizard
    • Cost Sets Page of the Cost Data Wizard
    • Export Cost Data
    • Process Complete Page of the Cost Data Wizard
    • Project and Format Page of the Cost Data Wizard
    • SQL Command Process
    • User Preferences Dialog Box
    • wInsight Wizard
    • Configuration Page of the wInsight Wizard
    • Configuration Selection Page of the Cost Data Wizard
    • Cost Data Wizard
    • Cost Data Export
    • Cobra to wInsight Data Export
    • Cobra 8.4 Help System
    • Confirmation Page of the Cost Data Wizard
    • Data Export
    • Access Control Page of the Cost Data Wizard
    • Process Running Page of the Cost Data Wizard
    • Data Formats
    • wInsight DTD
    • Save and Run Page of the Cost Data Wizard
  • data import
    • Save and Load Page of the Integration Wizard
    • Edit Exported Data in Excel
  • data import actual cost
    • Confirmation Page of the Integration Wizard
    • Save and Load Page of the Integration Wizard
    • First Result and Derived Costs
    • Class and Results Page of the Integration Wizard
    • Cumulative versus Current Period Costs
    • Process Running Page of the Integration Wizard
    • Process Running Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • The Field Mapper
    • Field Mapper Page of the Integration Wizard
    • Import File Preparation
    • Entering Actual Costs
    • Actual Cost Import File
    • Import File Validation
    • Master Project Versus Individual Projects
    • Integration Configuration Page of the Integration Wizard
    • Entering Actual Costs Using an Import File
    • Control Account Fields Versus Codes
    • Cost Classes
    • Loading Actual Cost Records from a CSV File
    • Integration Wizard-Actual Costs
    • File Selection Page of the Integration Wizard
    • Database Table Selection Page of the Integration Wizard
    • Data Import-Actual Costs
    • Access Control Page of the Integration Wizard
    • Process Complete Page of the Integration Wizard
    • Entering Actual Costs Manually
    • Data Formats
    • Control Account Versus Work Package Level
    • Included Costs Page of the Integration Wizard
    • Options Page of the Integration Wizard
  • data import ancillary data
  • data import apportionment definition
    • Process Running Page of the Integration Wizard
    • Integration Wizard-Apportionment Definition and Mapping Data
    • Process Complete Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
    • Data Import-Apportionment Definition
    • Edit Exported Data in Excel
    • Data Import-Apportionment Definition and Mapping Data
    • Data Import-Apportionment Mapping
    • File Format for Importing Apportionment Definition
    • Confirmation Page of the Integration Wizard
  • data import apportionment mapping
    • Process Running Page of the Integration Wizard
    • Integration Wizard-Apportionment Definition and Mapping Data
    • Process Complete Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
    • Edit Exported Data in Excel
    • Data Import-Apportionment Definition and Mapping Data
    • Data Import-Apportionment Mapping
    • File Format for Importing Apportionment Definition
    • Confirmation Page of the Integration Wizard
  • data import budget data
  • data import status data
  • data locking
  • data options
  • data source
    • ODBC DSN
    • Cobra Database
  • data tool
    • ODBC DSN
    • Add Results to a Resource
    • Cobra Database
    • Results Tab of the Resource File Properties Dialog Box
  • database
    • Data Tool
    • Save and Load Page of the Integration Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • SQL Command Utility
    • Preparing the Primavera Schedule
    • Process Logs
    • Data Dictionary
    • Report Criterion Parameters
    • Work Package Codes Page of the wInsight Wizard
    • Send a Message to Users
    • Integration Configuration Page of the Integration Wizard
    • Results Page of the Integration Wizard
    • Recalc Preferences
    • Configure Cobra to Work with Microsoft Project Server
    • Miscellaneous Page of the wInsight Wizard
    • Batch Reports Dialog Box
    • Integrate Ancillary Data Process
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Integration Configuration Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Configuration Page of the wInsight Wizard
    • Integration Configuration Page of the Integration Wizard
    • Preparing the Open Plan Schedule
    • Cobra Database
    • Results Tab of the Resource File Properties Dialog Box
    • Display a Login Message
    • wInsight Database Page of the wInsight Wizard
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Process Logs Dialog Box
    • SQL Language Extended Support
    • Results or Field Names
  • database table selection page
  • date range page
    • Date Range Page of the Respread Wizard
    • Date Range Page of the Recalc Wizard
    • Date Range Page of the Zero-Out Data Wizard
    • Date Range Page of the Reclass Wizard
  • date selection page
    • Date Selection Page of the Integration Wizard-MS Project
    • Date Selection Page of the Integration Wizard-Open Plan
    • Date Selection Page of the Integration Wizard
    • Date Selection Page of the Integration Wizard-Primavera
  • dcde
    • Export Cost Data
    • Exported Cost Data File
    • Procedures
    • Data Options Page of the Cost Data Wizard
    • Cost Data Wizard
    • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
    • Cost Data Export
    • Save and Run Page of the Cost Data Wizard
  • DCDE
    • Export Cost Data
    • Procedures
    • Data Options Page of the Cost Data Wizard
    • Cost Data Wizard
    • Cost Data Export
  • debug logs
    • Data Access Tab of the Application Preferences Dialog Box
    • ProcessLog.xml Log File
    • Procedures
    • Log SQL Statements in ClientDebugLog.xml
    • Debug Logs
    • ClientDebugLog.xml Log File
    • Log Memory Usage Details
    • Disable the Automatic Archiving of ClientDebugLog.xml Log File
    • Edit IdeaBlade.ibconfig File
    • ServerDebugLog.xml Log File
    • Log SQL Statements in ServerDebugLog.xml
    • Logging of Memory Usage Details
  • debugging
    • Log Memory Usage Details
    • Logging of Memory Usage Details
  • definition and mapping
    • Process Running Page of the Integration Wizard
    • Integration Wizard-Apportionment Definition and Mapping Data
    • Process Complete Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
    • Edit Exported Data in Excel
    • Data Import-Apportionment Definition and Mapping Data
    • Data Import-Apportionment Mapping
    • File Format for Importing Apportionment Definition
    • Confirmation Page of the Integration Wizard
  • delete calendar periods
  • delete holiday
  • deltek common data
    • Export Structures Page of the Cost Data Wizard
    • Cost Sets Page of the Cost Data Wizard
    • Process Complete Page of the Cost Data Wizard
    • Procedures
    • Project and Format Page of the Cost Data Wizard
    • Data Options Page of the Cost Data Wizard
    • Integration Tab of the Application Preferences Dialog Box
    • Configuration Selection Page of the Cost Data Wizard
    • Cost Data Wizard
    • Cost Data Export
    • Confirmation Page of the Cost Data Wizard
    • Access Control Page of the Cost Data Wizard
    • Process Running Page of the Cost Data Wizard
    • Save and Run Page of the Cost Data Wizard
  • deltek cost data
  • details tab
    • Details Tab of the Resource View
    • Details Tab of the Code View
  • developer resources
  • dialog box
    • Display the Rate File Properties Dialog Box Tabs without Opening a Rate File
    • Code Assignments Tab of the Project Properties Dialog Box
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Confirmation Page of the New Project Wizard
    • Rename Work Package Dialog Box
    • Application Preferences
    • Criteria Page of the Slip Wizard
    • Copy Batch Report Dialog Box
    • Enable a User to Access a Resource File
    • Insert Column Dialog Box
    • Data Access Tab of the Application Preferences Dialog Box
    • Resource Assignment Percent Complete Dialog Box
    • Code Fields Tab of the Resource File Properties Dialog Box
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Rename Dialog Box
    • Add Work Package Dialog Box
    • Reorder Resources
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Analyze Preferences
    • General Tab of the Code File Properties Dialog Box
    • Errors Dialog Box of the Process Log Viewer
    • Rename a Work Package
    • Backup Dialog Box
    • Settings Page of the New Project Wizard
    • Confirmation Page of the New Resource File Wizard
    • Copy Work Package Dialog Box
    • Copy Project Codes Dialog Box
    • Perform Apportionment Mapping
    • Copy Preferences Dialog Box
    • New Filter Dialog Box of the Report Wizard
    • Calendar File Properties Dialog Box
    • Copy Control Account Dialog Box
    • Reorder Resources/Codes Dialog Box
    • Progress Techniques
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Analyze Options Dialog Box
    • Rename an Ancillary File
    • Spread Budgets Using Pre-defined Spread Methods
    • Project Codes Tab of the Application Preferences Dialog Box
    • Create a New Resource File
    • Display the Open File Dialog Box
    • Resource File Security
    • Thresholds Tab of the Code View
    • Calculations Tab of the Resource View
    • Project Selection Page of the Respread Wizard
    • Merge Sub-Projects into a New Project
    • Display the Resource File Properties Dialog Box Tabs from an Open Resource File
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Back Up Your Data
    • Actual Costs Preferences
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Cobra Login Dialog Box
    • Copy Project Preferences
    • New Filter Expression Dialog Box of the Report Wizard
    • Replan Preferences
    • Access Control Tab of the Resource File Properties Dialog Box
    • Report Properties Dialog Box
    • Copy Child Resources to a Resource
    • Access Control Tab of the Code File Properties Dialog Box
    • General Tab of the Application Preferences Dialog Box
    • Change Password Dialog Box
    • Code Fields Page of the New Code File Wizard
    • Calculate Hours Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Edit Calendar Sets
    • Backup Dialog Box
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Add a New Work Package using the Dialog Box
    • EPM Security Administrator Functions
    • Add Control Account Dialog Box
    • Preferences Tab of the Project Properties Dialog Box
    • Rename Control Account Dialog Box
    • Project Selection Page of the Update Totals Wizard
    • Report Categories
    • Recalc Preferences
    • Integration Tab of the Application Preferences Dialog Box
    • Save As Dialog Box (Merging Projects)
    • Update EAC Dialog Box
    • Add Apportionment Source Dialog Box
    • Find Dialog Box
    • Apportionment Dialog Box
    • General Information Page of the New Code File Wizard
    • Save a Project as a Different Project
    • About Deltek Cobra Dialog Box
    • Results Page of the Report Wizard
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Project Dates Page of the New Project Wizard
    • General Information Page of the New Class Wizard
    • Project Code Assignments Page of the New Project Wizard
    • Open Dialog Box of the Calculated Results Wizard
    • Apportionment Setup Steps
    • Set a Maximum Number of Login Tries
    • Set the Date Format
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Calendars
    • Delete a Result from a Resource
    • Change Password Dialog Box
    • Additional Information in Resources
    • Save As Dialog Box (Ancillary Files)
    • Associate an Earned Value Class with a Forecast Class
    • Locate Custom Application Dialog Box
    • Copy a Work Package
    • Batch Reports Dialog Box
    • Insert a Column in a View
    • General Tab of the Classes Tab
    • Configure the Application Settings
    • Add a Resource Assignment
    • Other Tab of the Application Preferences Dialog Box
    • Import Location Page of the Assignment Import Wizard
    • Access Control Page of the New Code File Wizard
    • General Tab of the Resource File Properties Dialog Box
    • Progress Techniques
    • Order Resource Results Dialog Box
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Open File Dialog Box
    • Move a Work Package
    • Open File Dialog Box
    • Codes Grid of the Code View
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Code Fields Page of the New Resource File Wizard
    • Code File Properties Dialog Box
    • Add Results to a Resource
    • Target Class Page of the Reclass Wizard
    • User Preferences Dialog Box
    • Calculated Results Dialog Box
    • Copy Existing Cost Sets to a Project
    • Structure Tab of the Resource File Properties Dialog Box
    • Code View
    • Lookup Dialog Box
    • Move a Control Account
    • Add Calculated Result Dialog Box of the Calculated Results Wizard
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Thresholds Page of the New Resource File Wizard
    • Rename a Control Account
    • Results Tab of the Resource File Properties Dialog Box
    • Enable a User to Access a Code File
    • Move Work Package Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • New Sort Dialog Box of the Report Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Notes Tab of the Resource View
    • Purge Dialog Box
    • Flag Periods
    • Display a Login Message
    • Log Change Comment Dialog Box
    • SQL Command Utility Dialog Box
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
    • Reclass Preferences
    • Procedures
    • Add a New Control Account using the Dialog Box
    • Adjust Budget Spreads Manually
    • Delete a Code
    • Display the Code File Properties Dialog Box Tabs without Opening a Code File
    • Display the Resource File Properties Dialog Box Tabs without Opening a Resource File
    • Reconcile Milestone Weights
    • Create a New Code File
    • Save Graph Reports as Graphic Files
    • Access Control Page of the New Project Wizard
    • Save As Dialog Box (Projects)
    • Integration Wizard Preferences
    • Criteria Selection Page of the Recalc Wizard
    • Run the SQL Command Utility
    • Move Control Account Dialog Box
    • Configuration Security Dialog Box
    • Enable a Group to Access a Calendar File
    • Code Fields Tab of the Rate File Properties Dialog Box
    • Copy Narrative Information
    • Edit Column Dialog Box
    • Copy Codes to Another Project
    • New File Dialog Box
    • Options Page of the Replan Wizard
    • Spread Curve Dialog Box
    • Code File Structure Page of the New Code File Wizard
    • Set Maximum Time of Inactivity
    • Shortcut Menu
    • Perform Project Analysis
    • Sub-Projects Page of the New Project Wizard
    • Add Apportionment Target Dialog Box
    • Thresholds Tab of the Resource View
    • Confirmation Page of the New Code File Wizard
    • Earned Preferences
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Display the Open File Dialog Box
    • New Sort Expression Dialog Box of the Report Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Turn Windows Authentication On or Off
    • Access Control Tab of the Project Properties Dialog Box
    • Save As Dialog Box (Projects)
    • Resource Selection Page of the Replace Resources Wizard
    • Resource File Structure Page of the New Resource File Wizard
    • Criteria Page of the Reclass Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Cobra Login Dialog Box
    • New File Dialog Box
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Edit Calendar Set Dialog Box
    • Cost Sets Tab of the Project Properties Dialog Box
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Select Files to Restore Dialog Box
    • Process Logs Dialog Box
    • Include in Budget Cost Set Page of the New Class Wizard
    • Column Width Dialog Box
    • Resource-Loaded Schedule
    • Calendar View
    • Cost Sets Page of the Freeze Forecast Wizard
    • Results Pane of the Analyze Form
    • Warnings Dialog Box of the Process Log Viewer
    • Date Range Page of the Recalc Wizard
    • Save As Dialog Box (Ancillary Files)
    • Calendar Sets
    • Rename a Project
    • Reorder Codes
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Copy a Control Account
    • Reports Tab of the Application Preferences Dialog Box
    • Access Control Page of the New Resource File Wizard
    • Add Batch Report Dialog Box
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • dsn
  • eac
  • earned
  • earned value
    • Performance Data Page of the wInsight Wizard
    • Milestones/Steps
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Add a Second Earned Value Class to Your Project
    • Code Files
    • Select the Earned Value Method
    • ANSI Standard for Earned Value Management Systems
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Color Band
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Process Logs
    • Confirmation Page of the Calculate Progress Wizard
    • Results Page of the ANSI EIA X12 Wizard
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Thresholds Tab of the Code File Properties Dialog Box
    • Method Page of the Replan Wizard
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Progress Techniques
    • Calculate Progress Wizard
    • Thresholds Tab of the Code View
    • Reporting
    • Thresholds Page of the New Code File Wizard
    • Calculate Progress
    • Apportionment Definition Tab of the Resource View
    • Earned Value Management
    • Projects
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Progress Page of the Integration Wizard-Files
    • Status Page of the Integration Wizard-Scheduling Tools
    • General Tab of the Application Preferences Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Options Page of the Calculate Progress Wizard
    • Status Page of the Integration Wizard-Files
    • Supported Processes, Operations, and Data
    • Select the Level at Which to Capture Actual Costs
    • Select EVMS Acceptance for a Project
    • Resources
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Calendars
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • Process Running Page of the Calculate Progress Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Connecting to the Cobra Web Service Host
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Data Import Using Scheduling Tools and Files
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Thresholds Page of the New Resource File Wizard
    • Resource Assignments
    • Forecast Calculations
    • Possible Sources of Errors
    • Creating Service Operations Classes
    • Element of Cost Page of the wInsight Wizard
    • Earned Value Methods
    • Options Page of the Replan Wizard
    • Cobra 8.4 Help System
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Project Selection Page of the Calculate Progress Wizard
    • Procedures
    • Thresholds Tab of the Resource View
    • Earned Preferences
    • Status Page of the Integration Wizard
    • Resources
    • Advance Calendar Process
    • Cobra Web Service
    • Process Complete Page of the Calculate Progress Wizard
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Process Logs Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Include in Budget Cost Set Page of the New Class Wizard
    • Calendar View
    • Included Budget Classes Tab of the Classes Tab
    • Column Reports
    • Ancillary Files Page of the New Project Wizard
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Set Up Projects and Project Baselines
  • earned value method
  • earned value page
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Progress Page of the Integration Wizard-Files
    • Progress Page of the Integration Wizard
  • earned value technique
    • Progress Techniques
    • Progress Techniques
  • edit batch report
  • edit batch report dialog box
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Display the Edit Batch Report Dialog Box
  • edit calendar set
  • edit connection dialog box
    • Edit Connection Dialog Box of the Integration Wizard
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Edit Connection Dialog Box of the wInsight Wizard
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
  • edit filter expression dialog box
  • edit sort expression dialog box
  • edit tab
  • element
    • Element of Cost Page of the wInsight Wizard
    • Element of Cost
  • element of cost
    • Details Tab of the Resource View
    • Sub-Totals Page of the Report Wizard
    • Resources Grid of the Resource View
    • Assign Element of Cost to a Resource
    • Copy Element of Cost Value to Child Resources
    • Cost Data Export
    • Element of Cost Page of the wInsight Wizard
    • Element of Cost
  • element of cost page
  • eoc
    • Details Tab of the Resource View
    • Sub-Totals Page of the Report Wizard
    • Resources Grid of the Resource View
    • Assign Element of Cost to a Resource
    • Copy Element of Cost Value to Child Resources
    • Cost Data Wizard
    • Cost Data Export
    • Element of Cost Page of the wInsight Wizard
    • Element of Cost
  • EOC
    • Cost Data Export
    • Element of Cost
  • estimate
  • evms
  • evt
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Resource Assignment Percent Complete Dialog Box
    • Calculate Progress Process
    • Assign a Progress Technique to a Work Package
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Preparing the Primavera Schedule
    • Audit Reports
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Progress Page of the Integration Wizard-Files
    • Status Page of the Integration Wizard-Scheduling Tools
    • General Tab of the Application Preferences Dialog Box
    • Spreadsheet Pane Column Definitions
    • Apportionment Setup Steps
    • Calculate Progress
    • How Cobra Calculates Progress to Determine Earned Value
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Earned Preferences
    • Milestones/Steps Tab of the Project View
    • Status File Field Mapper Page of the Integration Wizard
    • Set Up Projects and Project Baselines
  • explorer
  • export calendar
    • Process Complete Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Confirmation Page of the Export Calendar to Open Plan Wizard
  • export calendar op wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Confirmation Page of the Export Calendar to Open Plan Wizard
  • export calendar to op wizard
    • Calendar Export to Open Plan
    • Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Calendar Selection Page of the Export Calendar to Open Plan Wizard
  • export calendar to opwizard
    • Procedures
    • Export a Calendar to Open Plan
  • export location page
  • export structures page
    • Export Structures Page of the Cost Data Wizard
    • Export Structures Page of the wInsight Wizard
    • Export Structures Page of the ANSI EIA X12 Wizard
  • field mapper page
  • field name
    • Data Tool
    • Rename Work Package Dialog Box
    • Insert Column Dialog Box
    • Color Band
    • Copy Control Account Dialog Box
    • General Tab of the Application Preferences Dialog Box
    • Add Control Account Dialog Box
    • Rename Control Account Dialog Box
    • Resources
    • Resource File Information Tags
    • Insert a Column in a View
    • Results Tab of the Resource File Properties Dialog Box
    • Edit Column Dialog Box
    • Considerations When Creating Field Names
    • Resource Calculation Tags
    • Resources
    • Add Resource Results Dialog Box
    • Status File Field Mapper Page of the Integration Wizard
    • Results or Field Names
  • file
    • Performance Data Page of the wInsight Wizard
    • Confirmation Page of the Integration Wizard
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Confirmation Page of the New Project Wizard
    • Enable a User to Access a Resource File
    • Insert Column Dialog Box
    • Save and Load Page of the Integration Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • Access Control Tab of the Calendar File Properties Dialog Box
    • SQL Command Utility
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Process Running Page of the wInsight Wizard
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Rename Dialog Box
    • Reorder Resources
    • Analyze Preferences
    • First Result and Derived Costs
    • Preparing the Primavera Schedule
    • Report Template Format
    • Errors Dialog Box of the Process Log Viewer
    • Process Logs
    • Settings Page of the New Project Wizard
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Confirmation Page of the New Resource File Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Results Page of the ANSI EIA X12 Wizard
    • Spreadsheet Pane of the Project View
    • Restore Process
    • Batch Report Process
    • File Format for Importing Apportionment Mapping
    • Get Cobra Spread Process
    • Reorder Resources/Codes Dialog Box
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Use a Code File in Multiple Projects
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Work Package Codes Page of the wInsight Wizard
    • Validity Check Process
    • Analyze Options Dialog Box
    • Rename an Ancillary File
    • Spread Budgets Using Pre-defined Spread Methods
    • Create a New Resource File
    • Codes
    • Structure Tab of the Code File Properties Dialog Box
    • Sub-Totals Page of the Report Wizard
    • Resource File Security
    • Thresholds Tab of the Code View
    • Class and Results Page of the Integration Wizard
    • Calculations Tab of the Resource View
    • Variance Thresholds
    • Reporting
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Back Up Your Data
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • Export and Import Time-Phased Resource Assignments
    • Delete Calendar Sets
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Integration Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Copy Child Resources to a Resource
    • Access Control Tab of the Code File Properties Dialog Box
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Change Password Dialog Box
    • Code Fields Page of the New Code File Wizard
    • Calendars Section of the XML File
    • The Field Mapper
    • Deploy the Cobra Web Service ClientAPI
    • Calculate Hours Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Edit Calendar Sets
    • Results Page of the Integration Wizard
    • Process Complete Page of the ANSI EIA X12 Wizard
    • Field Mapper Page of the Integration Wizard
    • Report Wizard
    • Include in Actuals Cost Set Page of the New Class Wizard
    • EPM Security Administrator Functions
    • EarnedValues Section of the XML File
    • Confirmation Page of the ANSI EIA X12 Wizard
    • Resources and Rates Page of the Integration Wizard
    • Status Page of the Integration Wizard-Files
    • Report Categories
    • Integration Tab of the Application Preferences Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Ancillary File Validations Page of the Validity Check Wizard
    • General Information Page of the New Code File Wizard
    • Save a Project as a Different Project
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Configure Cobra to Work with Microsoft Project Server
    • Project Dates Page of the New Project Wizard
    • General Information Page of the New Class Wizard
    • Data Import-Ancillary Data
    • Project Code Assignments Page of the New Project Wizard
    • Miscellaneous Page of the wInsight Wizard
    • Backup Project Process
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Actual Cost Import File
    • Delete a Result from a Resource
    • Cost Sets Page of the Report Wizard
    • Variance Thresholds
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
    • Required Template Files
    • Change Password Dialog Box
    • Save As Dialog Box (Ancillary Files)
    • Manage Sorts Dialog Box of the Report Wizard
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Hook Program Methods
    • Locate Custom Application Dialog Box
    • Batch Reports Dialog Box
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Import File Validation
    • File Selection Page of the Integration Wizard
    • Import Location Page of the Assignment Import Wizard
    • Integrate Ancillary Data Process
    • Confirmation Page of the New Calendar File Wizard
    • Filter Page of the Integration Wizard-Files
    • Notes Page of the Integration Wizard
    • Log SQL Statements in ClientDebugLog.xml
    • Access Control Page of the New Code File Wizard
    • File Selection Page of the Integration Wizard
    • Master Project Versus Individual Projects
    • Create Project from Template Process
    • SQL Command Process
    • General Tab of the Resource File Properties Dialog Box
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Order Resource Results Dialog Box
    • Confirmation Page of the New Class Wizard
    • Open File Dialog Box
    • Codes and the Integration Wizard
    • Open File Dialog Box
    • Delete a Resource from a Resource File
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Codes Grid of the Code View
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Code Fields Page of the New Resource File Wizard
    • Report Types
    • Add Results to a Resource
    • User Preferences Dialog Box
    • Integration Configuration Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Structure Tab of the Resource File Properties Dialog Box
    • Code View
    • Structures Section of the XML File
    • XML Configuration File
    • Process Running Page of the ANSI EIA X12 Wizard
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
    • Lookup Dialog Box
    • Assign a Rate Set to a Result
    • Configuration Page of the wInsight Wizard
    • Integration Configuration Page of the Integration Wizard
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • API Script
    • Control Account Fields Versus Codes
    • Results Tab of the Resource File Properties Dialog Box
    • Enable a User to Access a Code File
    • Class Settings Page for Earned Class of the New Class Wizard
    • Units Section of the XML File
    • Include in EAC Cost Set Page of the New Class Wizard
    • Notes Tab of the Resource View
    • Calendar Page of the Integration Wizard
    • Purge Dialog Box
    • Import Budget Data into Cobra
    • Customization of Integration Process
    • Flag Periods
    • SQL Command Utility Dialog Box
    • Periods Page of the New Calendar File Wizard
    • Loading Actual Cost Records from a CSV File
    • Adjust Budget Spreads Manually
    • Delete a Code
    • Reconcile Milestone Weights
    • Create a New Code File
    • wInsight Database Page of the wInsight Wizard
    • Save Graph Reports as Graphic Files
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Access Control Page of the New Project Wizard
    • Save As Dialog Box (Projects)
    • Integration Wizard Preferences
    • Edit Exported Data in Excel
    • Run the SQL Command Utility
    • Configuration Security Dialog Box
    • Enable a Group to Access a Calendar File
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • Edit Column Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Export Structures Page of the ANSI EIA X12 Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • New File Dialog Box
    • Cobra 8.4 Help System
    • Code File Structure Page of the New Code File Wizard
    • Data Import-Actual Costs
    • Delete an Existing Holiday from the Calendar
    • Shortcut Menu
    • Sub-Projects Page of the New Project Wizard
    • Codes Page of the Integration Wizard-MS Project
    • XML Configuration Object Interface
    • Thresholds Tab of the Resource View
    • Confirmation Page of the New Code File Wizard
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Process Log Viewer
    • Status Page of the Integration Wizard
    • Disable the Automatic Archiving of ClientDebugLog.xml Log File
    • Save As Dialog Box (Projects)
    • Resource Selection Page of the Replace Resources Wizard
    • Resource File Structure Page of the New Resource File Wizard
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Codes
    • Filter Page of the Integration Wizard
    • New File Dialog Box
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Manpowers Section of the XML File
    • Milestones/Steps Tab of the Project View
    • Process Complete Page of the wInsight Wizard
    • Select Files to Restore Dialog Box
    • Process Logs Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Include in Budget Cost Set Page of the New Class Wizard
    • ServerDebugLog.xml Log File
    • Resource-Loaded Schedule
    • Manage Filters Dialog Box of the Report Wizard
    • Log SQL Statements in ServerDebugLog.xml
    • Calendar View
    • Codes Page of the Integration Wizard-Open Plan
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
    • SQL Language Extended Support
    • Notes Tab of the Project View
    • Warnings Dialog Box of the Process Log Viewer
    • Data Formats
    • Add a Child Code to a Code
    • Save As Dialog Box (Ancillary Files)
    • Period Labels Page of the New Calendar File Wizard
    • API Script to Create a New Project from a Project Template
    • Customization of Processes
    • Rename a Project
    • Options Page of the Advance Calendar Wizard
    • Reorder Codes
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Status File Field Mapper Page of the Integration Wizard
    • Access Control Page of the New Resource File Wizard
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Included Costs Page of the Integration Wizard
    • Set Up Projects and Project Baselines
    • Report Templates
    • Fields Page of the New Project Wizard
  • file backup
  • file level security
  • file restoration
    • Restore Dialog Box
    • Restore Dialog Box
  • file restore
    • File Restore
    • Restore Data from a Backup File
  • file selection page
    • File Selection Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
  • files tab
  • filter
  • filter and sort page
  • filter page
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Filter Page of the Integration Wizard-Files
    • Filter Page of the Integration Wizard
  • filtering
    • Filters
    • Apply a Filter to a Column in the Spreadsheet Pane
    • Spreadsheet Pane of the Project View
    • Standard Filter Dialog Box
    • Clear the Filter
    • Advanced Filter Dialog Box
    • Filter by Classes or Cost Sets
  • filters
    • Filters
    • Apply a Filter to a Column in the Spreadsheet Pane
    • Spreadsheet Pane of the Project View
    • Standard Filter Dialog Box
    • File Backup
    • Clear the Filter
    • Advanced Filter Dialog Box
  • find
  • find dialog box
  • find function
  • flag period
  • flag periods
  • forecast
    • Calculate Forecast
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Export Time-Phased Resource Assignments to Excel
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Application Preferences
    • Coded Ranges Method
    • Progressing
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Forecast Preferences
    • Procedures
    • Preparing the Primavera Schedule
    • Initialize Forecast Process
    • Process Logs
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Baseline Tags
    • Process Running Page of the Calculate Forecast Wizard
    • Reconcile Budgets and Forecasts
    • Validity Check Process
    • Import Time-Phased Resource Assignments from Excel
    • Actual Costs Preferences
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Calculate Forecast Process
    • Process Complete Page of the Calculate Forecast Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Included Actual Classes Tab of the Classes Tab
    • Statistical Forecasts
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Procedures
    • Project Selection Page of the Calculate Forecast Wizard
    • Status Page of the Integration Wizard-Files
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Supported Processes, Operations, and Data
    • Update EAC Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Assign a Forecast Method to a Forecast Class
    • Project Dates Page of the New Project Wizard
    • Resources
    • General Information Page of the New Class Wizard
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • Project Selection Page of the Reclass Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Project Selection Page of the Freeze Forecast Wizard
    • General Information Page of the New Calendar File Wizard
    • Process Complete Page of the Freeze Forecast Wizard
    • Connecting to the Cobra Web Service Host
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Multiproject Operations (Master and Subprojects)
    • Apportionment Process
    • Class Information Tags
    • Milestone Tags
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Include in EAC Cost Set Page of the New Class Wizard
    • Forecast Calculations
    • Included Earned Classes Tab of the Classes Tab
    • Running the Process or Operation
    • Process Running Page of the Freeze Forecast Wizard
    • Reclass Preferences
    • Creating Service Operations Classes
    • Calculate Forecast Wizard
    • Element of Cost Page of the wInsight Wizard
    • Recalc
    • Frozen Forecasts
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Create a Forecast
    • Cobra 8.4 Help System
    • Retain EAC
    • Freeze a Forecast
    • Forecast Details Pane
    • Examples of Statistical Forecast Calculations
    • Take your Implementation a Step Further
    • Status Page of the Integration Wizard
    • Resources
    • Confirmation Page of the Calculate Forecast Wizard
    • Forecasts
    • Project Selection Page of the Top-Down Planning Wizard
    • Cobra Web Service
    • Process Lock
    • Criteria Selection Page of the Freeze Forecast Wizard
    • Forecast Class Selection Page of the Calculate Forecast Wizard
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Process Logs Dialog Box
    • Update Totals Process
    • Confirmation Page of the Freeze Forecast Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Cost Sets Page of the Freeze Forecast Wizard
    • Results Pane of the Analyze Form
    • Resource Components
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Set Up Projects and Project Baselines
    • Reclass a Class
  • forecast class
    • Coded Ranges Method
    • Forecast Details Pane
  • forecast class selection page
  • forecast method
  • format 3
    • Baseline Tags
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Calendars
    • Log Change Comment Dialog Box
    • Add Resource Results Dialog Box
  • formula
  • freeze forecast
  • freeze forecast wizard
    • Procedures
    • Freeze Forecast
    • Project Selection Page of the Freeze Forecast Wizard
    • Process Complete Page of the Freeze Forecast Wizard
    • Process Running Page of the Freeze Forecast Wizard
    • Freeze a Forecast
    • Freeze Forecast Wizard
    • Criteria Selection Page of the Freeze Forecast Wizard
    • Confirmation Page of the Freeze Forecast Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
  • gateway
  • general information page
    • General Information Page of the New Project Wizard
    • General Information Page of the New Code File Wizard
    • General Information Page of the New Class Wizard
    • General Information Page of the New Calendar File Wizard
    • General Information Page of the New Rate File Wizard
    • General Information Page of the New Resource File Wizard
    • General Information Page of the Add Rate Set Wizard
    • General Information Page of the Update Open Plan Resources Wizard
  • general tab
    • Resource Assignment Percent Complete Dialog Box
    • General Tab of the Code File Properties Dialog Box
    • Progress Techniques
    • General Tab of the Application Preferences Dialog Box
    • General Tab of the Report Properties Dialog Box
    • Assign a Forecast Method to a Forecast Class
    • Select EVMS Acceptance for a Project
    • Resource-Loaded Schedule
    • General Tab of the Classes Tab
    • General Tab of the Resource File Properties Dialog Box
    • Progress Techniques
    • Assign a Calendar Set to a Forecast or Budget Class
    • General Tab of the Edit Batch Report Dialog Box
    • Assign a Budget Source to a Budget Class
    • General Tab of the Rate File Properties Dialog Box
    • General Tab of the Project View
    • General Tab of the Calendar File Properties Dialog Box
    • Set Reporting Options
    • General Tab of the Add Batch Report Dialog Box
    • Resource-Loaded Schedule
    • General Tab of the Project Properties Dialog Box
  • generate
  • generate calendar periods
  • generate periods
  • generate periods dialog box
  • generate rates
  • generate rates wizard
  • graphs
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Analyze Preferences
    • Create Graph Reports from the Analyze Form
    • Analyze Options Dialog Box
    • Report Types
    • Save Graph Reports as Graphic Files
  • guidelines
  • IdeaBlade.ibconfig
    • Clear the Read-only Flag in the IdeaBlade.ibconfig File
    • Run Cobra Using a Different IdeaBlade.ibconfig File
  • IdeaBlade.ibconfig
  • import file
    • Multi-Project Concurrent Integration
    • Import File with Data from Multiple Projects
    • Import File Example
  • import file field mapper
  • inactivity
    • Set a Maximum Number of Login Tries
    • Set Maximum Time of Inactivity
    • Turn Windows Authentication On or Off
  • included costs page
  • included in budget
  • included reports tab
    • Included Reports Tab of the Add Batch Report Dialog Box
    • Included Reports Tab of the Edit Batch Report Dialog Box
  • information tab
  • integrate actual cost
    • Supported Processes, Operations, and Data
    • Integrate Actual Costs Process
    • Cobra Web Service
  • integration
    • Confirmation Page of the Integration Wizard
    • Export Cost Data
    • Resource Assignments Page of the Integration Wizard-Primavera
    • Configure Cobra to Support Additional User Fields
    • Class and Results Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Field Mapper Page of the Integration Wizard
    • Multi-Project Concurrent Integration
    • Import File Preparation
    • Import File Validation
    • Using Spread
    • Integrate Actual Costs Process
    • Options for Importing from Microsoft Project
    • Integration Configuration Page of the Integration Wizard
    • Entering Actual Costs Using an Import File
    • Cost Data Wizard
    • Integration Wizard-Actual Costs
    • File Selection Page of the Integration Wizard
    • Data Import Using Files
    • Database Table Selection Page of the Integration Wizard
    • Cost Data Export
    • Integrate Project Data Process
    • Integration Wizard-Scheduling Tools and Files
    • Secure Baseline Dates
    • Access Control Page of the Integration Wizard
    • Import File with Data from Multiple Projects
    • Process Complete Page of the Integration Wizard
    • Entering Actual Costs Manually
    • Additional User Fields
    • Included Costs Page of the Integration Wizard
    • Options Page of the Integration Wizard
  • integration configuration page
    • Integration Configuration Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
  • integration tab
    • Keyboard Shortcuts
    • Integration Tab
  • integration wizard
    • Confirmation Page of the Integration Wizard
    • Configuration Security
    • Import File Field Mapper Page of the Integration Wizard
    • Connection Selection Page of the Integration Wizard
    • Save and Load Page of the Integration Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Preparing the Primavera Schedule
    • Integration Wizard-Ancillary Data
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Resources and Rates Page of the Integration Wizard (New Project)
    • Access Control Page of the Integration Wizard
    • Class and Results Page of the Integration Wizard
    • Cumulative versus Current Period Costs
    • Process Running Page of the Integration Wizard
    • Actual Costs Preferences
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • Process Running Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Integration Wizard
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • The Field Mapper
    • Results Page of the Integration Wizard
    • Field Mapper Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard
    • Project Selection Page of the Integration Wizard-Files
    • Resources and Rates Page of the Integration Wizard
    • Status Page of the Integration Wizard-Files
    • Integration Tab of the Application Preferences Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Confirmation Page of the Integration Wizard
    • File Format for Importing Status Information
    • Integration Wizard-Apportionment Definition and Mapping Data
    • File Level Security
    • Configure Cobra to Work with Microsoft Project Server
    • Entering Actual Costs
    • Data Import-Ancillary Data
    • Process Complete Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Primavera Fields Imported
    • Resource-Loaded Schedule
    • Actual Cost Import File
    • Data Import-Budget Data
    • File Selection Page of the Integration Wizard
    • Integrate Ancillary Data Process
    • Filter Page of the Integration Wizard-Files
    • Notes Page of the Integration Wizard
    • Edit Connection Dialog Box of the Integration Wizard
    • Master Project Versus Individual Projects
    • Data Import from Open Plan
    • Codes Page of the Integration Wizard
    • Codes and the Integration Wizard
    • Process Complete Page of the Integration Wizard
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Data Import-Status Data
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard
    • Process Running Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Data Import Using Scheduling Tools and Files
    • Options for Importing from Microsoft Project
    • Integration Configuration Page of the Integration Wizard
    • Preparing the Open Plan Schedule
    • Date Selection Page of the Integration Wizard
    • Codes Page of the Integration Wizard-Primavera
    • Control Account Fields Versus Codes
    • Other Options Page of the Integration Wizard
    • Calendar Page of the Integration Wizard
    • Import Budget Data into Cobra
    • Ancillary File Field Mapper Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-MS Project
    • Customization of Integration Process
    • Cost Classes
    • Periods Page of the New Calendar File Wizard
    • Loading Actual Cost Records from a CSV File
    • Data Import from Primavera
    • Data Import-Apportionment Definition
    • Data Import Using Files
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Project Selection Page of the Integration Wizard
    • Edit Exported Data in Excel
    • Configuration Security Dialog Box
    • Data Import from Microsoft Project
    • Integration Wizard-Scheduling Tools and Files
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Schedule Mapping Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard
    • Cobra 8.4 Help System
    • Save and Load Page of the Integration Wizard
    • Codes Page of the Integration Wizard-MS Project
    • Process Running Page of the Integration Wizard
    • Check Open Plan Baseline Resource Records
    • Status Page of the Integration Wizard
    • Access Control Page of the Integration Wizard
    • Import Status Data into Cobra
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Filter Page of the Integration Wizard
    • Process Complete Page of the Integration Wizard
    • Process Logs Dialog Box
    • Confirmation Page of the Integration Wizard
    • Resource-Loaded Schedule
    • Codes Page of the Integration Wizard-Open Plan
    • Data Formats
    • Customization of Processes
    • Schedule Mapping Page of the Integration Wizard-MS Project
    • Import File Example
    • Status File Field Mapper Page of the Integration Wizard
    • Confirmation Page of the Integration Wizard
    • Project Selection Page of the Integration Wizard-Scheduling Tools
    • Control Account Versus Work Package Level
    • Additional User Fields
    • Date Selection Page of the Integration Wizard-Primavera
    • Included Costs Page of the Integration Wizard
  • integration Wizard
    • Resource Assignments Page of the Integration Wizard-Primavera
    • Preparing Cobra for Schedule Integration
    • Integration Wizard Preferences
  • integration wizard
    • First Result and Derived Costs
    • File Selection Page of the Integration Wizard
    • Data Import-Apportionment Definition and Mapping Data
    • Data Import-Apportionment Mapping
    • Data Import-Actual Costs
    • File Format for Importing Apportionment Definition
  • integration wizard preferences
  • ipmdar
    • Export Cost Data
    • Exported Cost Data File
    • Procedures
    • Project and Format Page of the Cost Data Wizard
    • Data Options Page of the Cost Data Wizard
    • Contract Information Tab of the Project Properties Dialog Box
    • Cost Data Wizard
    • Cost Data Export
    • Save and Run Page of the Cost Data Wizard
  • ipmr cpr format 2
    • IPMR Format 2 Summary Page of the Report Wizard
    • Resources
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Resources
  • ipmr format 2
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code the Resources for IPMR Format 2 Reports
    • Files Tab of the Project Properties Dialog Box
    • IPMR Format 2 Summary Page of the wInsight Wizard
  • ipmr format 2 summary page
    • IPMR Format 2 Summary Page of the Report Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
  • keyboard shortcuts
    • Keyboard Shortcuts
    • Keyboard Shortcuts
    • Keyboard Shortcuts
    • Keyboard Shortcuts
    • Keyboard Shortcuts
    • Keyboard Shortcuts
  • launch
    • Set Cobra to Always Run as an Administrator
    • Launching Cobra
  • link structures page
  • log
    • Data Tool
    • Data Access Tab of the Application Preferences Dialog Box
    • Log Transaction Page of the Project Audit Wizard
    • ODBC DSN
    • Process Complete Page of the Rolling Wave Wizard
    • Project Selection Page of the Project Audit Wizard
    • Preparing the Primavera Schedule
    • Process Complete Page of the Replan Wizard
    • Errors Dialog Box of the Process Log Viewer
    • Process Logs
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Audit Reports
    • Audit Log Comparison Page of the Project Audit Wizard
    • Process Running Page of the Project Audit Wizard
    • Baseline Tags
    • Copy Preferences Dialog Box
    • Validity Check Process
    • Process Complete Page of the Export Calendar to Open Plan Wizard
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Reporting
    • Actual Costs Preferences
    • Personal Reports Pane
    • Process Complete Page of the Calculate Forecast Wizard
    • Copy Project Preferences
    • New Filter Expression Dialog Box of the Report Wizard
    • Send a Message to Users
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Process Complete Page of the Project Audit Wizard
    • Change Control Page of the Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Terminate a Session
    • Files Tab of the Project Properties Dialog Box
    • Process Complete Page of the ANSI EIA X12 Wizard
    • EPM Security Administrator Functions
    • Process Complete Page of the Apportionment Calculation Wizard
    • Report Categories
    • Integration Tab of the Application Preferences Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Prompt Level Page of the Project Audit Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Set a Maximum Number of Login Tries
    • Round off Audit Log Transactions
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Hook Program Methods
    • Import File Validation
    • Log SQL Statements in ClientDebugLog.xml
    • Audit Logging
    • MsgLogger Object Interface
    • Custom Cost Classes
    • Report Types
    • Process Complete Page of the Reclass Wizard
    • Update Transaction Changes
    • Log Operation Page of the Project Audit Wizard
    • Display a Login Message
    • Log Change Comment Dialog Box
    • Running the Process or Operation
    • Set Project Baseline Page of the Project Audit Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Log Process
    • Process Complete Page of the Advance Calendar Wizard
    • Integration Wizard Preferences
    • Configuration Security Dialog Box
    • Reconcile Project Logs Using the Project Audit Wizard
    • Set Maximum Time of Inactivity
    • Process Complete Page of the Validity Check Wizard
    • Process Log Viewer
    • New Sort Expression Dialog Box of the Report Wizard
    • Disable the Automatic Archiving of ClientDebugLog.xml Log File
    • Turn Windows Authentication On or Off
    • Codes
    • Process Complete Page of the Calculate Progress Wizard
    • Process Complete Page of the Top-Down Planning Wizard
    • Process Lock
    • Process Complete Page of the wInsight Wizard
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Process Logs Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • ServerDebugLog.xml Log File
    • Log SQL Statements in ServerDebugLog.xml
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
    • Warnings Dialog Box of the Process Log Viewer
    • Add Resource Results Dialog Box
    • Process Complete Page of the Slip Wizard
    • Process Complete Page of the Report Wizard
    • Set Up Projects and Project Baselines
  • log change comment
  • log comment page
    • Log Comment Page of the Project Audit Wizard
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
  • log file
    • Data Access Tab of the Application Preferences Dialog Box
    • ODBC DSN
    • ProcessLog.xml Log File
    • ClientDebugLog.xml Log File
    • ServerDebugLog.xml Log File
  • log in
    • Data Tool
    • Data Access Tab of the Application Preferences Dialog Box
    • Launching Cobra
    • Cobra to wInsight Data Export
    • Configuration Security Dialog Box
  • log memory
    • Log Memory Usage Details
    • Logging of Memory Usage Details
  • login message
  • login retries
    • Set a Maximum Number of Login Tries
    • Set Maximum Time of Inactivity
    • Turn Windows Authentication On or Off
  • logs
  • manage filters dialog box
  • manage sorts dialog box
  • manage view
  • master
  • master project
    • Merge Sub-Projects into a New Project
    • Remove Sub-Projects from a Master Project
    • Merge Sub-Projects into a New Project
    • Procedures
    • Remove Sub-Projects from a Master Project
    • Assign Sub-Projects to a Master Project
    • Merging a Master Project's Subprojects to Create a New Project
    • Multiproject Operations (Master and Subprojects)
    • Validate Sub-Projects
    • Validate Sub-Projects
    • Multiproject Guidelines
    • Assign Sub-Projects to a Master Project
    • Create a Master Project
  • microsoft project
    • Options for Importing from Microsoft Project
    • Data Import from Microsoft Project
    • Integration Wizard-Scheduling Tools and Files
    • Schedule Mapping Page of the Integration Wizard-MS Project
  • milestone
    • Milestones/Steps
    • Application Preferences
    • Code Files
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Preparing the Primavera Schedule
    • Progress Techniques
    • Validity Check Process
    • Progress Page of the Integration Wizard-Files
    • Status Page of the Integration Wizard-Scheduling Tools
    • Change Control Page of the Integration Wizard
    • General Tab of the Application Preferences Dialog Box
    • Status Page of the Integration Wizard-Files
    • Integration Tab of the Application Preferences Dialog Box
    • Procedures
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Milestone Tags
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Reconcile Milestone Weights
    • Integration Wizard Preferences
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Status Page of the Integration Wizard
    • Milestones/Steps Tab of the Project View
    • Status File Field Mapper Page of the Integration Wizard
    • Set Up Projects and Project Baselines
    • Reconcile Milestone Weight Variance Dialog Box
  • milestones steps tab
    • Delete Milestones or Steps
    • Procedures
    • Add Milestones or Steps
    • Milestones/Steps Tab of the Project View
    • Modify Milestones or Steps
  • move control account dialog box
  • move work package dialog box
  • multiple
  • multiple sessions
  • multiproject operations
    • Merge Sub-Projects into a New Project
    • Remove Sub-Projects from a Master Project
    • Merge Sub-Projects into a New Project
    • Procedures
    • Remove Sub-Projects from a Master Project
    • Assign Sub-Projects to a Master Project
    • Merging a Master Project's Subprojects to Create a New Project
    • Multiproject Operations (Master and Subprojects)
    • Validate Sub-Projects
    • Validate Sub-Projects
    • Multiproject Guidelines
    • Assign Sub-Projects to a Master Project
    • Create a Master Project
  • multiprojects
    • Merge Sub-Projects into a New Project
    • Remove Sub-Projects from a Master Project
    • Merge Sub-Projects into a New Project
    • Procedures
    • Remove Sub-Projects from a Master Project
    • Assign Sub-Projects to a Master Project
    • Merging a Master Project's Subprojects to Create a New Project
    • Multiproject Operations (Master and Subprojects)
    • Validate Sub-Projects
    • Validate Sub-Projects
    • Multiproject Guidelines
    • Assign Sub-Projects to a Master Project
    • Create a Master Project
  • names
    • Considerations When Creating Names in Cobra
    • Considerations When Creating Names in Cobra
  • new calendar file wizard
    • Display the New Calendar File Wizard
    • Create a New Calendar
    • New Calendar File Wizard
    • Confirmation Page of the New Calendar File Wizard
    • Access Control Page of the New Calendar File Wizard
    • Productive Hours Page of the New Calendar File Wizard
    • Calendar Sets
  • new class wizard
    • Add a Second Earned Value Class to Your Project
    • Delete a Cost Set
    • Copy Classes Dialog Box
    • Display the New Class Wizard
    • Copy Cost Sets Dialog Box
    • Create a New Class
    • Confirmation Page of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • Create a New Cost Set
    • Procedures
    • New Class Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
  • new class Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Forecast Class Page of the New Class Wizard
    • Include in Actuals Cost Set Page of the New Class Wizard
    • General Information Page of the New Class Wizard
    • Class Settings Page for Budget Class of the New Class Wizard
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Class Settings Page for Earned Class of the New Class Wizard
    • Include in Earned Cost Set Page of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Include in Budget Cost Set Page of the New Class Wizard
  • new code file wizard
    • Thresholds Tab of the Code File Properties Dialog Box
    • Structure Tab of the Code File Properties Dialog Box
    • Thresholds Page of the New Code File Wizard
    • Access Control Tab of the Code File Properties Dialog Box
    • Code Fields Page of the New Code File Wizard
    • General Information Page of the New Code File Wizard
    • New Code File Wizard
    • Access Control Page of the New Code File Wizard
    • Procedures
    • Enable a User to Access a Code File
    • Create a New Code File
    • Display the New Code File Wizard
    • Code File Structure Page of the New Code File Wizard
    • Code File Structures
    • Confirmation Page of the New Code File Wizard
  • new connection dialog box
    • Preparing the Primavera Schedule
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • New Connection Dialog Box of the Integration Wizard
    • New Connection Dialog Box of the wInsight Wizard
  • new file dialog box
    • Display the New Calendar File Wizard
    • Display the New File Dialog Box
    • Display the New File Dialog Box
  • new project wizard
    • Code Assignments Tab of the Project Properties Dialog Box
    • Confirmation Page of the New Project Wizard
    • Rename Work Package Dialog Box
    • Procedures
    • Add Work Package Dialog Box
    • Settings Page of the New Project Wizard
    • Copy Work Package Dialog Box
    • Spreadsheet Pane of the Project View
    • General Information Page of the New Project Wizard
    • Projects
    • General Tab of the Application Preferences Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Add Control Account Dialog Box
    • Rename Control Account Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Project Dates Page of the New Project Wizard
    • Project Code Assignments Page of the New Project Wizard
    • Display the New Project Wizard
    • Move Work Package Dialog Box
    • Access Control Page of the New Project Wizard
    • Move Control Account Dialog Box
    • Create a New Project
    • Sub-Projects Page of the New Project Wizard
    • Access Control Tab of the Project Properties Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Options Page of the Advance Calendar Wizard
    • Ancillary Files Page of the New Project Wizard
    • New Project Wizard
    • Fields Page of the New Project Wizard
  • new project Wizard
  • new rate file wizard
    • Access Control Page of the New Rate File Wizard
    • Code Fields Page of the New Rate File Wizard
    • Procedures
    • General Information Page of the New Rate File Wizard
    • Confirmation Page of the New Rate File Wizard
    • Display the New Rate File Wizard
    • Create a New Rate File
  • new resource file wizard
    • Enable a User to Access a Resource File
    • Confirmation Page of the New Resource File Wizard
    • Procedures
    • Create a New Resource File
    • Resource File Security
    • Access Control Tab of the Resource File Properties Dialog Box
    • Display the New Resource File Wizard
    • General Tab of the Resource File Properties Dialog Box
    • Code Fields Page of the New Resource File Wizard
    • Structure Tab of the Resource File Properties Dialog Box
    • Thresholds Page of the New Resource File Wizard
    • Resource Results Page of the New Resource File Wizard
    • General Information Page of the New Resource File Wizard
    • Resource File Structure Page of the New Resource File Wizard
    • Default Rates Page of the New Resource File Wizard
    • Access Control Page of the New Resource File Wizard
  • not included in budget
  • notes
  • notes page
  • notes tab
    • Add a Note to a Code
    • Notes Tab of the Resource View
    • Notes Tab of the Code View
    • Notes Tab of the Project View
  • odbc
  • odc
    • Integration Tab of the Application Preferences Dialog Box
    • Cost Data Export
  • op wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Confirmation Page of the Export Calendar to Open Plan Wizard
  • open plan
    • Data Import from Open Plan
    • Integration Wizard-Scheduling Tools and Files
    • Check Open Plan Baseline Resource Records
  • operations
    • Data Access Tab of the Application Preferences Dialog Box
    • Log Transaction Page of the Project Audit Wizard
    • Use a Code File in Multiple Projects
    • Calculated Results
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Special-Purpose Operations
    • EPM Security Administrator Functions
    • Apportionment Setup Steps
    • Organize Project Information
    • Process Cycle
    • Multiproject Operations (Master and Subprojects)
    • Custom Project Tables
    • Results Tab of the Resource File Properties Dialog Box
    • Log Operation Page of the Project Audit Wizard
    • Running the Process or Operation
    • Creating Service Operations Classes
    • Recalc
    • Run the Rolling Wave Process
    • Process Logs Dialog Box
    • Set Up Projects and Project Baselines
  • options page
    • Options Page of the Respread Wizard
    • Analyze Preferences
    • Actual Costs Preferences
    • Replan Preferences
    • Options Page of the Calculate Progress Wizard
    • Options Page of the Rolling Wave Wizard
    • Recalc Preferences
    • Options Page of the Recalc Wizard
    • Reclass Preferences
    • Integration Wizard Preferences
    • Options Page of the Zero-Out Data Wizard
    • Options Page of the Replan Wizard
    • Options Page of the Reclass Wizard
    • Earned Preferences
    • Options Page of the Calculate Forecast Wizard
    • Options Page of the Advance Calendar Wizard
    • Options Page of the ANSI EIA X12 Wizard
    • Options Page of the Integration Wizard
  • oracle
    • Troubleshoot Oracle Error ORA-600 [kkqcscpcky:ficand] While Running Query with Parameter "_replace_virtual_columns=false"
    • Update the "_replace_virtual_columns" Setting
  • order
  • order resource results dialog box
  • other direct costs
    • Integration Tab of the Application Preferences Dialog Box
    • Cost Data Export
  • other functions
    • Set a Maximum Number of Login Tries
    • Set Maximum Time of Inactivity
    • Turn Windows Authentication On or Off
  • other options
    • Change Control Page of the Integration Wizard
    • Running the Process or Operation
  • overview
  • owner
    • Change Owner Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Display the Change Owner Dialog Box
    • Procedures
    • Change Ownership and Access Rights
    • Change Ownership and Access Rights Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Change Ownership and Access Rights Dialog Box
    • Change the Owner of an Object
    • Change Access Rights Dialog Box
    • Change the Access Rights of an Object
  • owner delegate
  • password
    • Create Windows Shortcut for the API Script
    • Preparing the Primavera Schedule
    • Change Password Dialog Box
    • Change Password Dialog Box
    • Connecting to the Cobra Web Service Host
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Change Your Password
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
  • paste
  • pending dates
  • personal reports pane
  • preferences
    • Forecast Preferences
    • ANSI EIA X12 Preferences
    • Analyze Preferences
    • Copy Preferences Dialog Box
    • Project Preferences
    • Copy Project Preferences
    • Replan Preferences
    • Display the Project Properties Dialog Box Tabs from an Open Project File
    • Display the Project Properties Dialog Box Tabs without Opening a Project File
    • Preferences Tab of the Project Properties Dialog Box
    • Recalc Preferences
    • Open Status Tab of the Project Properties Dialog Box
    • Reclass Preferences
    • Integration Wizard Preferences
    • Advance Calendar Preferences
    • Earned Preferences
    • Access Control Tab of the Project Properties Dialog Box
    • Procedures
  • preferences tab
    • Forecast Preferences
    • ANSI EIA X12 Preferences
    • Analyze Preferences
    • Copy Preferences Dialog Box
    • Project Preferences
    • Progress Techniques
    • Actual Costs Preferences
    • Copy Project Preferences
    • Replan Preferences
    • Display the Project Properties Dialog Box Tabs from an Open Project File
    • Display the Project Properties Dialog Box Tabs without Opening a Project File
    • Preferences Tab of the Project Properties Dialog Box
    • Recalc Preferences
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Progress Techniques
    • Open Status Tab of the Project Properties Dialog Box
    • Reclass Preferences
    • Integration Wizard Preferences
    • Advance Calendar Preferences
    • Earned Preferences
    • Access Control Tab of the Project Properties Dialog Box
    • Procedures
    • Options Page of the Advance Calendar Wizard
  • primavera
    • Primavera Fields Imported
    • Data Import from Primavera
    • Integration Wizard-Scheduling Tools and Files
  • process complete
    • Process Complete Page of the Align Time-phased Dates Wizard
    • Process Complete Page of the Cost Data Wizard
    • Process Complete Page of the Update Totals Wizard
    • Process Complete Page of the Integration Wizard
  • process complete page
    • Process Complete Page of the Rolling Wave Wizard
    • Process Complete Page of the Replan Wizard
    • Errors Dialog Box of the Process Log Viewer
    • Process Complete Page of the Export Calendar to Open Plan Wizard
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Process Complete Page of the Calculate Forecast Wizard
    • Process Complete Page of the Project Audit Wizard
    • Process Complete Page of the ANSI EIA X12 Wizard
    • Process Complete Page of the Apportionment Calculation Wizard
    • Process Complete Page of the Integration Wizard
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Process Complete Page of the Freeze Forecast Wizard
    • Process Complete Page of the Integration Wizard
    • Process Complete Page of the Reclass Wizard
    • Process Complete Page of the Respread Wizard
    • Process Complete Page of the Zero-Out Data Wizard
    • Process Complete Page of the Advance Calendar Wizard
    • Process Complete Page of the Recalc Wizard
    • Process Complete Page of the Validity Check Wizard
    • Process Log Viewer
    • Process Complete Page of the Integration Wizard
    • Process Complete Page of the Calculate Progress Wizard
    • Process Complete Page of the Top-Down Planning Wizard
    • Process Complete Page of the Replace Resources Wizard
    • Process Complete Page of the wInsight Wizard
    • Warnings Dialog Box of the Process Log Viewer
    • Process Complete Page of the Update Codes Wizard
    • Process Complete Page of the Slip Wizard
    • Process Complete Page of the Report Wizard
  • process log
  • process log viewer
    • Errors Dialog Box of the Process Log Viewer
    • Process Log Viewer
    • Process Logs Dialog Box
    • Warnings Dialog Box of the Process Log Viewer
  • process running
  • process running page
    • Process Running Page of the Apportionment Calculation Wizard
    • Process Running Page of the Reclass Wizard
    • Process Running Page of the Respread Wizard
    • Process Running Page of the wInsight Wizard
    • Process Running Page of the Top-Down Planning Wizard
    • Process Running Page of the Project Audit Wizard
    • Process Running Page of the Advance Calendar Wizard
    • Process Running Page of the Calculate Forecast Wizard
    • Process Running Page of the Replan Wizard
    • Process Running Page of the Rolling Wave Wizard
    • Process Running Page of the Integration Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Integration Wizard
    • Process Running Page of the Validity Check Wizard
    • Process Running Page of the Align Time-phased Dates Wizard
    • Process Running Page of the Update Codes Wizard
    • Process Running Page of the Slip Wizard
    • Process Running Page of the Calculate Progress Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Integration Wizard
    • Process Running Page of the ANSI EIA X12 Wizard
    • Process Running Page of the Replace Resources Wizard
    • Process Running Page of the Freeze Forecast Wizard
    • Process Running Page of the Update Totals Wizard
    • Process Running Page of the Integration Wizard
    • Process Running Page of the Recalc Wizard
    • Process Running Page of the Cost Data Wizard
    • Process Running Page of the Zero-Out Data Wizard
  • process section
    • Process Log Viewer
    • API Script to Create a New Project from a Project Template
  • processes
    • Application Processes
    • Project Processes
  • processes tab
    • Processes Tab
    • Keyboard Shortcuts
  • progress
    • Add a Second Earned Value Class to Your Project
    • Select the Earned Value Method
    • Calculate Progress Process
    • Assign a Progress Technique to a Work Package
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Audit Reports
    • Method Page of the Replan Wizard
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Progress Techniques
    • Calculate Progress
    • Progress Page of the Integration Wizard-Files
    • General Tab of the Application Preferences Dialog Box
    • Options Page of the Calculate Progress Wizard
    • Apportionment Setup Steps
    • Calculate Progress
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Possible Sources of Errors
    • Process Complete Page of the Calculate Progress Wizard
    • Status File Field Mapper Page of the Integration Wizard
  • progress technique
    • Milestones/Steps
    • Calculate Progress using the Calculated Apportionment Progress Technique
    • Progress Techniques
    • Calculate Progress
    • Progress Techniques
    • Sample Earned Value Calculation
    • Planning Reports
    • Earned Preferences
    • Advance Calendar Process
    • Milestones/Steps Tab of the Project View
  • project
    • Performance Data Page of the wInsight Wizard
    • Code Assignments Tab of the Project Properties Dialog Box
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Confirmation Page of the New Project Wizard
    • Rename Work Package Dialog Box
    • Application Preferences
    • Criteria Page of the Slip Wizard
    • Insert Column Dialog Box
    • Process Running Page of the Apportionment Calculation Wizard
    • Process Running Page of the Reclass Wizard
    • Add a Second Earned Value Class to Your Project
    • Data Access Tab of the Application Preferences Dialog Box
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • Resource Assignment Percent Complete Dialog Box
    • Log Transaction Page of the Project Audit Wizard
    • Access Control Tab of the Calendar File Properties Dialog Box
    • SQL Command Utility
    • ANSI Standard for Earned Value Management Systems
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Color Band
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Rename Dialog Box
    • Add Work Package Dialog Box
    • Process Complete Page of the Rolling Wave Wizard
    • Project Selection Page of the Project Audit Wizard
    • Analyze Preferences
    • Preparing the Primavera Schedule
    • Report Template Format
    • Delete a Cost Set
    • Process Complete Page of the Replan Wizard
    • Work Package Name Page of the Replan Wizard
    • Rename a Work Package
    • Initialize Forecast Process
    • Settings Page of the New Project Wizard
    • Date Selection Page of the Integration Wizard-MS Project
    • Project Selection Page of the Advance Calendar Wizard
    • Action Selection Page of the Integration Wizard
    • Confirmation Page of the Calculate Progress Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Copy Work Package Dialog Box
    • Copy Project Codes Dialog Box
    • Examples of Manual Forecast Calculations
    • Delete Project Process
    • Spreadsheet Pane of the Project View
    • Restore Process
    • Audit Reports
    • Audit Log Comparison Page of the Project Audit Wizard
    • Process Running Page of the Project Audit Wizard
    • Baseline Tags
    • Perform Apportionment Mapping
    • Explanation of Variance Narrative Tags
    • Copy Preferences Dialog Box
    • Process Running Page of the Advance Calendar Wizard
    • New Filter Dialog Box of the Report Wizard
    • Thresholds Tab of the Code File Properties Dialog Box
    • Process Running Page of the Calculate Forecast Wizard
    • Report Criterion Parameters
    • File Format for Importing Apportionment Mapping
    • Get Cobra Spread Process
    • Confirmation Page of the Report Wizard
    • Copy Control Account Dialog Box
    • Process Running Page of the Replan Wizard
    • Method Page of the Replan Wizard
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Advance to Period Page of the Advance Calendar Wizard
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Display the Project Properties Dialog Box from an Open Project
    • Validity Check Process
    • Analyze Options Dialog Box
    • Rename an Ancillary File
    • Spread Budgets Using Pre-defined Spread Methods
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Thresholds Tab of the Code View
    • Class and Results Page of the Integration Wizard
    • Variance Thresholds
    • Project Selection Page of the Respread Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Back Up Your Data
    • Actual Costs Preferences
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • Remove Sub-Projects from a Master Project
    • Process Complete Page of the Calculate Forecast Wizard
    • Export and Import Time-Phased Resource Assignments
    • Copy Project Preferences
    • New Filter Expression Dialog Box of the Report Wizard
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Integration Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Access Control Tab of the Code File Properties Dialog Box
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Process Complete Page of the Project Audit Wizard
    • Change Control Page of the Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Cost Set Information Tags
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Included Actual Classes Tab of the Classes Tab
    • The Field Mapper
    • Assign Control Account and Work Package Structures to a Project
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Results Page of the Integration Wizard
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Add a New Work Package using the Dialog Box
    • EPM Security Administrator Functions
    • Process Complete Page of the Apportionment Calculation Wizard
    • Add Control Account Dialog Box
    • Preferences Tab of the Project Properties Dialog Box
    • Confirmation Page of the Reclass Wizard
    • Resources and Rates Page of the Integration Wizard
    • Project Selection Page of the Calculate Forecast Wizard
    • Rename Control Account Dialog Box
    • Project Selection Page of the Update Totals Wizard
    • Status Page of the Integration Wizard-Files
    • Report Categories
    • Recalc Preferences
    • Integration Tab of the Application Preferences Dialog Box
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Supported Processes, Operations, and Data
    • Save As Dialog Box (Merging Projects)
    • Update EAC Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Procedures
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Prompt Level Page of the Project Audit Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Apportionment Dialog Box
    • Remove Sub-Projects from a Master Project
    • Assign a Forecast Method to a Forecast Class
    • General Information Page of the New Code File Wizard
    • Select EVMS Acceptance for a Project
    • Spreadsheet Pane Column Definitions
    • Save a Project as a Different Project
    • Results Page of the Report Wizard
    • Configure Cobra to Work with Microsoft Project Server
    • Project Dates Page of the New Project Wizard
    • Resources
    • General Information Page of the New Class Wizard
    • Process Running Page of the Validity Check Wizard
    • Examples of Forecast Calculations
    • Project Code Assignments Page of the New Project Wizard
    • Open Dialog Box of the Calculated Results Wizard
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Backup Project Process
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Calendars
    • Cost Sets Page of the Report Wizard
    • Variance Thresholds
    • Required Template Files
    • Organize Project Information
    • Manage Sorts Dialog Box of the Report Wizard
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Hook Program Methods
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • Copy a Work Package
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Import File Validation
    • Classes Tab of the Project Properties Dialog Box
    • Other Tab of the Application Preferences Dialog Box
    • Import Location Page of the Assignment Import Wizard
    • Integrate Ancillary Data Process
    • Filter Page of the Integration Wizard-Files
    • Project Selection Page of the Reclass Wizard
    • Process Running Page of the Slip Wizard
    • Access Control Page of the New Code File Wizard
    • Process Running Page of the Calculate Progress Wizard
    • File Selection Page of the Integration Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Process Cycle
    • Project Processes
    • Project Selection Page of the Freeze Forecast Wizard
    • Master Project Versus Individual Projects
    • Create Project from Template Process
    • Progress Techniques
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Multiproject Operations (Master and Subprojects)
    • Validations Page of the Validity Check Wizard
    • Open File Dialog Box
    • Apportionment Process
    • Replan Process
    • Access Control Page of the Report Wizard
    • Codes and the Integration Wizard
    • Open File Dialog Box
    • Class Information Tags
    • Milestone Tags
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Report Types
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • User Preferences Dialog Box
    • Integration Configuration Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Copy Existing Cost Sets to a Project
    • Process Complete Page of the Reclass Wizard
    • Data Import Using Scheduling Tools and Files
    • Code View
    • XML Configuration File
    • Custom Project Tables
    • Move a Control Account
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Rename a Control Account
    • Control Account Fields Versus Codes
    • Results Tab of the Resource File Properties Dialog Box
    • Move Work Package Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • Display the Project Properties Dialog Box without Opening the Project
    • New Sort Dialog Box of the Report Wizard
    • Update Transaction Changes
    • Include in EAC Cost Set Page of the New Class Wizard
    • Forecast Calculations
    • Template Resource Files
    • Calendar Page of the Integration Wizard
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Purge Dialog Box
    • Import Budget Data into Cobra
    • Included Earned Classes Tab of the Classes Tab
    • Log Operation Page of the Project Audit Wizard
    • Customization of Integration Process
    • Contract Information Tab of the Project Properties Dialog Box
    • Log Change Comment Dialog Box
    • Running the Process or Operation
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
    • Process Running Page of the Freeze Forecast Wizard
    • Reclass Preferences
    • Creating Service Operations Classes
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Add a New Control Account using the Dialog Box
    • Set Project Baseline Page of the Project Audit Wizard
    • Adjust Budget Spreads Manually
    • Confirmation Page of the Advance Calendar Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Milestone Weights
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Access Control Page of the New Project Wizard
    • Save As Dialog Box (Projects)
    • Process Complete Page of the Advance Calendar Wizard
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • Criteria Selection Page of the Recalc Wizard
    • Move Control Account Dialog Box
    • Configuration Security Dialog Box
    • Copy Project Process
    • Element of Cost Page of the wInsight Wizard
    • Reconcile Project Logs Using the Project Audit Wizard
    • Additional Project Files
    • Recalc
    • Edit Column Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Copy Codes to Another Project
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • New File Dialog Box
    • Options Page of the Replan Wizard
    • Spread Curve Dialog Box
    • Cobra 8.4 Help System
    • Enter Contract Information
    • Data Import-Actual Costs
    • Shortcut Menu
    • Freeze a Forecast
    • Resources Pane
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Perform Project Analysis
    • Sub-Projects Page of the New Project Wizard
    • Process Complete Page of the Recalc Wizard
    • Codes Page of the Integration Wizard-MS Project
    • Confirmation Page of the Replace Resources Wizard
    • Project Selection Page of the Calculate Progress Wizard
    • Validate Code Assignments — Solve Roll-Up Issues
    • Thresholds Tab of the Resource View
    • Process Complete Page of the Validity Check Wizard
    • Earned Preferences
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Process Log Viewer
    • New Sort Expression Dialog Box of the Report Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Status Page of the Integration Wizard
    • Confirmation Page of the Respread Wizard
    • Access Control Tab of the Project Properties Dialog Box
    • Save As Dialog Box (Projects)
    • Resource Selection Page of the Replace Resources Wizard
    • Resources
    • Slip a Project
    • Style Page of the Report Wizard
    • Set Reporting Options
    • Criteria Page of the Reclass Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Advance Calendar Process
    • Codes
    • Filter Page of the Integration Wizard
    • Control Account and Work Package Note Tags
    • Cobra Web Service
    • New File Dialog Box
    • Process Complete Page of the Calculate Progress Wizard
    • Default Rates Page of the New Resource File Wizard
    • Process Complete Page of the Top-Down Planning Wizard
    • Process Lock
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Cost Sets Tab of the Project Properties Dialog Box
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Select Files to Restore Dialog Box
    • Run the Rolling Wave Process
    • Confirmation Page of the Apportionment Calculation Wizard
    • Process Logs Dialog Box
    • Classes Page of the Respread Wizard
    • Update Totals Process
    • Select the Level at Which to Capture Actual Costs
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Resource-Loaded Schedule
    • Manage Filters Dialog Box of the Report Wizard
    • Calendar View
    • Advance the Calendar
    • Confirmation Page of the Validity Check Wizard
    • Confirmation Page of the Freeze Forecast Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
    • Results Pane of the Analyze Form
    • SQL Language Extended Support
    • Notes Tab of the Project View
    • Data Formats
    • Date Range Page of the Recalc Wizard
    • Calendar Sets
    • API Script to Create a New Project from a Project Template
    • Resource Components
    • Customization of Processes
    • Rename a Project
    • Options Page of the Advance Calendar Wizard
    • Column Reports
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Process Complete Page of the Slip Wizard
    • Time-phased Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Process Complete Page of the Report Wizard
    • Application Settings
    • Results or Field Names
    • Control Account Versus Work Package Level
    • Access Control Page of the New Resource File Wizard
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Set Up Projects and Project Baselines
    • Reclass a Class
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • project analysis
    • Create Graph Reports from the Analyze Form
    • Edit Chart Data
    • Analyze Options Dialog Box
    • Customize Graphs Using the Chart Designer
    • Save Graph Reports as XML Files
    • Graph Reports
    • Save Template Dialog Box
    • Procedures
    • Analyze
    • Security Options for the Analyze Process
    • Locate Custom Application Dialog Box
    • Procedures
    • Customize Graphs
    • Narrative Text Pane of the Analyze Form
    • Analyze Project Dialog Box
    • Select a Chart Type
    • Get Narrative Dialog Box
    • Save Graph Reports as Graphic Files
    • Copy Narrative Information
    • Print Analyze Graph Reports
    • Perform Project Analysis
    • Set Up Chart Details
    • Analyze Form
    • Results Pane of the Analyze Form
  • project and apportionment validation page
  • project audit
    • Log Transaction Page of the Project Audit Wizard
    • Project Selection Page of the Project Audit Wizard
    • Audit Reports
    • Audit Log Comparison Page of the Project Audit Wizard
    • Process Running Page of the Project Audit Wizard
    • Validity Check Process
    • Sub-Totals Page of the Report Wizard
    • Project Audit Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Process Complete Page of the Project Audit Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Files Tab of the Project Properties Dialog Box
    • Turn Project Audit On or Off
    • Edit the Project Audit Log
    • Prompt Level Page of the Project Audit Wizard
    • Reset the Baseline Using the Project Audit Wizard
    • Report Types
    • Log Comment Page of the Project Audit Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Update Transaction Changes
    • Log Operation Page of the Project Audit Wizard
    • Set Project Baseline Page of the Project Audit Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Project Logs Using the Project Audit Wizard
    • Project Audit Logging
    • Confirmation Page of the Project Audit Wizard
    • Process Lock
    • Process Logs Dialog Box
    • Procedures
    • Add Resource Results Dialog Box
  • project audit wizard
    • Log Transaction Page of the Project Audit Wizard
    • Project Selection Page of the Project Audit Wizard
    • Audit Log Comparison Page of the Project Audit Wizard
    • Process Running Page of the Project Audit Wizard
    • Project Audit Wizard
    • Process Complete Page of the Project Audit Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Turn Project Audit On or Off
    • Edit the Project Audit Log
    • Prompt Level Page of the Project Audit Wizard
    • Reset the Baseline Using the Project Audit Wizard
    • Log Comment Page of the Project Audit Wizard
    • Update Transaction Changes
    • Log Operation Page of the Project Audit Wizard
    • Set Project Baseline Page of the Project Audit Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Project Logs Using the Project Audit Wizard
    • Project Audit Logging
    • Confirmation Page of the Project Audit Wizard
    • Process Lock
    • Procedures
  • project code assignments page
  • project dates page
  • project edit tab
  • project information
    • Code Files
    • IPMR Format 2 Summary Page of the wInsight Wizard
  • project officer codes page
    • Project Officer Codes Page of the ANSI EIA X12 Wizard
    • Project Officer Codes Page of the wInsight Wizard
  • project operations
    • Use a Code File in Multiple Projects
    • Multiproject Operations (Master and Subprojects)
  • project page
    • Project and Format Page of the Cost Data Wizard
    • Project Page of the wInsight Wizard
  • project plan
    • ANSI Standard for Earned Value Management Systems
    • Audit Reports
    • Report Types
  • project planning
  • project properties
    • Code Assignments Tab of the Project Properties Dialog Box
    • Class Settings Page for Actuals Class of the New Class Wizard
    • IPMR Format 2 Summary Page of the Report Wizard
    • Forecast Class Page of the New Class Wizard
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • ANSI EIA X12 Preferences
    • Analyze Preferences
    • Delete a Cost Set
    • Copy Project Codes Dialog Box
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Copy Preferences Dialog Box
    • Procedures
    • Project Preferences
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Procedures
    • Display the Project Properties Dialog Box from an Open Project
    • Copy Classes Dialog Box
    • Project Codes Tab of the Application Preferences Dialog Box
    • Display the New Class Wizard
    • Merge Sub-Projects into a New Project
    • General Information Page of the New Project Wizard
    • Actual Costs Preferences
    • Remove Sub-Projects from a Master Project
    • Copy Project Preferences
    • Replan Preferences
    • Included Actual Classes Tab of the Classes Tab
    • Assign Control Account and Work Package Structures to a Project
    • Display the Project Properties Dialog Box Tabs from an Open Project File
    • Files Tab of the Project Properties Dialog Box
    • Procedures
    • Display the Project Properties Dialog Box Tabs without Opening a Project File
    • Sub-Projects Validation Dialog Box
    • Procedures
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Procedures
    • Budget Tab of the Project Properties Dialog Box
    • Copy Cost Sets Dialog Box
    • Add Control Account Dialog Box
    • Preferences Tab of the Project Properties Dialog Box
    • Recalc Preferences
    • Save As Dialog Box (Merging Projects)
    • Select the Level at Which to Capture Actual Costs
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Assign Ancillary Files to a Project
    • Create a New Class
    • Rolling Wave Dialog Box of the Project Properties Dialog Box
    • Remove Sub-Projects from a Master Project
    • Assign a Forecast Method to a Forecast Class
    • Select EVMS Acceptance for a Project
    • General Information Page of the New Class Wizard
    • Class Settings Page for Budget Class of the New Class Wizard
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Class Overview
    • Classes Tab of the Project Properties Dialog Box
    • Using the Selected and Secure Checkboxes
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Progress Techniques
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Procedures
    • Procedures
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • Open Status Tab of the Project Properties Dialog Box
    • Advance Calendar
    • Modify the Project Description
    • Class Settings Page for Earned Class of the New Class Wizard
    • Display the Project Properties Dialog Box without Opening the Project
    • Include in Earned Cost Set Page of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Included Earned Classes Tab of the Classes Tab
    • Contract Information Tab of the Project Properties Dialog Box
    • Procedures
    • Create a New Cost Set
    • Reclass Preferences
    • Procedures
    • Access Control Page of the New Project Wizard
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • New Class Wizard
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Copy Codes to Another Project
    • Enter Project Dates
    • Enter Contract Information
    • Assign a Rate File to a Forecast Actual or Budget Class
    • Earned Preferences
    • Project Properties Dialog Box
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Access Control Tab of the Project Properties Dialog Box
    • Set Reporting Options
    • Procedures
    • Procedures
    • Fields Tab of the Project Properties Dialog Box
    • Cost Sets Tab of the Project Properties Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Procedures
    • Assign Codes to a Project
    • Associate an Actual Class with a Forecast Class
    • Options Page of the Advance Calendar Wizard
    • Procedures
    • General Tab of the Project Properties Dialog Box
  • project properties
    • Forecast Preferences
    • Synchronize Status Dates
    • Advance Calendar Preferences
  • project properties dialog box
    • Code Assignments Tab of the Project Properties Dialog Box
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Forecast Class Page of the New Class Wizard
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Forecast Preferences
    • ANSI EIA X12 Preferences
    • Analyze Preferences
    • Delete a Cost Set
    • Copy Project Codes Dialog Box
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Copy Preferences Dialog Box
    • Procedures
    • Project Preferences
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Procedures
    • Display the Project Properties Dialog Box from an Open Project
    • Copy Classes Dialog Box
    • Project Codes Tab of the Application Preferences Dialog Box
    • Display the New Class Wizard
    • Merge Sub-Projects into a New Project
    • General Information Page of the New Project Wizard
    • Actual Costs Preferences
    • Remove Sub-Projects from a Master Project
    • Copy Project Preferences
    • Replan Preferences
    • Included Actual Classes Tab of the Classes Tab
    • Assign Control Account and Work Package Structures to a Project
    • Display the Project Properties Dialog Box Tabs from an Open Project File
    • Files Tab of the Project Properties Dialog Box
    • Procedures
    • Display the Project Properties Dialog Box Tabs without Opening a Project File
    • Sub-Projects Validation Dialog Box
    • Procedures
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Procedures
    • Budget Tab of the Project Properties Dialog Box
    • Copy Cost Sets Dialog Box
    • Add Control Account Dialog Box
    • Preferences Tab of the Project Properties Dialog Box
    • Recalc Preferences
    • Save As Dialog Box (Merging Projects)
    • Select the Level at Which to Capture Actual Costs
    • Assign Ancillary Files to a Project
    • Create a New Class
    • Rolling Wave Dialog Box of the Project Properties Dialog Box
    • Remove Sub-Projects from a Master Project
    • Assign a Forecast Method to a Forecast Class
    • Select EVMS Acceptance for a Project
    • General Information Page of the New Class Wizard
    • Synchronize Status Dates
    • Class Settings Page for Budget Class of the New Class Wizard
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Class Overview
    • Classes Tab of the Project Properties Dialog Box
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Progress Techniques
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Procedures
    • Procedures
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • Open Status Tab of the Project Properties Dialog Box
    • Procedures
    • Advance Calendar
    • Modify the Project Description
    • Class Settings Page for Earned Class of the New Class Wizard
    • Display the Project Properties Dialog Box without Opening the Project
    • Include in Earned Cost Set Page of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Add a Class to a Cost Set
    • Included Earned Classes Tab of the Classes Tab
    • Contract Information Tab of the Project Properties Dialog Box
    • Procedures
    • Create a New Cost Set
    • Reclass Preferences
    • Procedures
    • Access Control Page of the New Project Wizard
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • New Class Wizard
    • Advance Calendar Preferences
    • Copy Codes to Another Project
    • Enter Project Dates
    • Enter Contract Information
    • Assign a Rate File to a Forecast Actual or Budget Class
    • Earned Preferences
    • Project Properties Dialog Box
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Access Control Tab of the Project Properties Dialog Box
    • Set Reporting Options
    • Procedures
    • Procedures
    • Cost Sets Tab of the Project Properties Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Procedures
    • Assign Codes to a Project
    • Associate an Actual Class with a Forecast Class
    • Options Page of the Advance Calendar Wizard
    • Procedures
    • General Tab of the Project Properties Dialog Box
  • project properties dialog box
  • project replan
    • Process Complete Page of the Replan Wizard
    • Work Package Name Page of the Replan Wizard
    • Process Running Page of the Replan Wizard
    • Method Page of the Replan Wizard
    • Options Page of the Replan Wizard
    • Process Lock
  • project security
    • Give a Group Access to a Project
    • Project Security
    • Give a User Access to a Project
    • Procedures
  • project selection page
    • Project Selection Page of the Project Audit Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Project Selection Page of the Recalc Wizard
    • Project Selection Page of the Apportionment Calculation Wizard
    • Project Selection Page of the Rolling Wave Wizard
    • Project Selection Page of the Respread Wizard
    • Project Selection Page of the Zero-Out Data Wizard
    • Project Selection Page of the Integration Wizard-Files
    • Project Selection Page of the Calculate Forecast Wizard
    • Project Selection Page of the Update Totals Wizard
    • Status Page of the Integration Wizard-Files
    • Project Selection Page of the ANSI EIA X12 Wizard
    • Project Selection Page of the Reclass Wizard
    • Project Selection Page of the Freeze Forecast Wizard
    • Project Selection Page of the Replan Wizard
    • Project Selection Page of the Update Codes Wizard
    • Project Selection Page of the Replace Resources Wizard
    • Project Selection Page of the Integration Wizard
    • Project Selection Page of the Align Time-phased Dates Wizard
    • Project Selection Page of the Calculate Progress Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Status Page of the Integration Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Project Selection Page of the Validity Check Wizard
    • Project Selection Page of the Integration Wizard-Scheduling Tools
    • Project Selection Page of the Slip Wizard
  • project template
    • Settings Page of the New Project Wizard
    • General Information Page of the New Project Wizard
    • General Tab of the Application Preferences Dialog Box
    • Required Template Files
    • API Script to Create a New Project from a Project Template
  • project toolbar
  • project view
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Rename Work Package Dialog Box
    • Process Running Page of the Reclass Wizard
    • Resource Assignment Percent Complete Dialog Box
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Color Band
    • Assign a Progress Technique to a Work Package
    • Time-phase Pane of the Project View
    • Add Work Package Dialog Box
    • Copy and Paste in the Project View
    • Rename a Work Package
    • Settings Page of the New Project Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Confirmation Page of the Calculate Progress Wizard
    • Copy Work Package Dialog Box
    • Spreadsheet Pane of the Project View
    • Process Running Page of the Advance Calendar Wizard
    • Process Running Page of the Calculate Forecast Wizard
    • Copy Control Account Dialog Box
    • Update EAC
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Progress Techniques
    • Reconcile Budgets and Forecasts
    • Advance to Period Page of the Advance Calendar Wizard
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Display the Project Properties Dialog Box from an Open Project
    • Spread Budgets Using Pre-defined Spread Methods
    • Sub-Totals Page of the Report Wizard
    • Project Selection Page of the Respread Wizard
    • General Information Page of the New Project Wizard
    • Projects
    • Process Complete Page of the Calculate Forecast Wizard
    • Export and Import Time-Phased Resource Assignments
    • General Tab of the Application Preferences Dialog Box
    • Assign Control Account and Work Package Structures to a Project
    • Codes Tab of the Project View
    • Delete Milestones or Steps
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Add a New Work Package using the Dialog Box
    • Add Control Account Dialog Box
    • Confirmation Page of the Reclass Wizard
    • Project Selection Page of the Calculate Forecast Wizard
    • Rename Control Account Dialog Box
    • Project Selection Page of the Update Totals Wizard
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Update EAC Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Procedures
    • Assign a Forecast Method to a Forecast Class
    • Select EVMS Acceptance for a Project
    • Spreadsheet Pane Column Definitions
    • Save a Project as a Different Project
    • General Information Page of the New Class Wizard
    • Spread Updated Budgets for Resources
    • Add Resource Assignment Dialog Box
    • Display the New Project Wizard
    • Spread Dialog Box
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Associate an Earned Value Class with a Forecast Class
    • Copy a Work Package
    • Add a Resource Assignment
    • Explore Cobra
    • Import Location Page of the Assignment Import Wizard
    • Project Selection Page of the Reclass Wizard
    • Process Running Page of the Calculate Progress Wizard
    • Project View
    • Progress Techniques
    • Using Spread
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Move a Work Package
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Target Class Page of the Reclass Wizard
    • User Preferences Dialog Box
    • Display the Project View
    • Process Complete Page of the Reclass Wizard
    • Move a Control Account
    • Advance Calendar
    • Rename a Control Account
    • Results Tab of the Resource File Properties Dialog Box
    • Move Work Package Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • Display the Project Properties Dialog Box without Opening the Project
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Add a New Control Account using the Dialog Box
    • Adjust Budget Spreads Manually
    • Add Milestones or Steps
    • Confirmation Page of the Advance Calendar Wizard
    • Reconcile Milestone Weights
    • Data Entry in the Time-phase Pane
    • Process Complete Page of the Advance Calendar Wizard
    • Assign a Budget Source to a Budget Class
    • Shortcut Menu
    • Criteria Selection Page of the Recalc Wizard
    • Move Control Account Dialog Box
    • Time-phase Detail Pane of the Project View
    • Tabbed Pane of the Project View
    • Spread Curve Dialog Box
    • Enter Contract Information
    • General Tab of the Project View
    • Forecast Details Pane
    • Process Complete Page of the Recalc Wizard
    • Confirmation Page of the Replace Resources Wizard
    • Project Selection Page of the Calculate Progress Wizard
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Confirmation Page of the Respread Wizard
    • Resource Selection Page of the Replace Resources Wizard
    • Set Reporting Options
    • Criteria Page of the Reclass Wizard
    • Process Complete Page of the Calculate Progress Wizard
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Classes Page of the Respread Wizard
    • Update Totals Process
    • Select the Level at Which to Capture Actual Costs
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Advance the Calendar
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
    • Notes Tab of the Project View
    • Date Range Page of the Recalc Wizard
    • Time-phase Pane Field Descriptions
    • Modify Milestones or Steps
    • Options Page of the Advance Calendar Wizard
    • Add Resource Results Dialog Box
    • Copy a Control Account
    • Manual Forecasts
    • Reclass a Class
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • projects
    • Rename Work Package Dialog Box
    • Assign a Progress Technique to a Work Package
    • Considerations When Creating Names in Cobra
    • Project Preferences
    • Update EAC
    • Considerations When Creating Names in Cobra
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Reconcile Budgets and Forecasts
    • Projects
    • Delete Milestones or Steps
    • Spread Updated Budgets for Resources
    • Add Resource Assignment Dialog Box
    • Spread Dialog Box
    • Project View
    • Using Spread
    • Move a Work Package
    • Display the Project View
    • Procedures
    • Add Milestones or Steps
    • Shortcut Menu
    • General Tab of the Project View
    • Projects
    • Modify Milestones or Steps
    • Copy a Control Account
  • projects pane
    • Projects Pane Column Definitions
    • Projects Pane
    • Shortcut Menu
  • purge
  • purge dialog box
  • qat
  • rate
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Enable a User to Access a Resource File
    • SQL Command Utility
    • Rename Dialog Box
    • Rate Sets
    • Preparing the Primavera Schedule
    • Action Selection Page of the Integration Wizard
    • Examples of Manual Forecast Calculations
    • Perform Apportionment Mapping
    • File Format for Importing Apportionment Mapping
    • Validity Check Process
    • Create a New Resource File
    • Rate View
    • Resource File Security
    • Calculations Tab of the Resource View
    • Rate Tags
    • Reporting
    • General Information Page of the New Project Wizard
    • Projects
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Integration Wizard
    • Rate File Information Tags
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Resources and Rates Page of the Integration Wizard
    • Report Categories
    • Recalc Preferences
    • Rate Sets Grid
    • Ancillary File Validations Page of the Validity Check Wizard
    • Spreadsheet Pane Column Definitions
    • Resources
    • Data Import-Ancillary Data
    • Examples of Forecast Calculations
    • Code Fields Page of the New Rate File Wizard
    • Apportionment Setup Steps
    • Required Template Files
    • Save As Dialog Box (Ancillary Files)
    • Manage Sorts Dialog Box of the Report Wizard
    • Calculate Progress
    • Resource File Information Tags
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • File Selection Page of the Integration Wizard
    • General Tab of the Resource File Properties Dialog Box
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Open File Dialog Box
    • Open File Dialog Box
    • Class Information Tags
    • Report Types
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • Integration Configuration Page of the Integration Wizard
    • Code View
    • XML Configuration File
    • Lookup Dialog Box
    • Assign a Rate Set to a Result
    • Delete a Rate From a Rate Set
    • Sample Earned Value Calculation
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Results Tab of the Resource File Properties Dialog Box
    • Forecast Calculations
    • Template Resource Files
    • Purge Dialog Box
    • Cobra Components
    • Recalc
    • New File Dialog Box
    • Examples of Statistical Forecast Calculations
    • XML Configuration Object Interface
    • Resource Calculation Tags
    • Resources
    • Advance Calendar Process
    • New File Dialog Box
    • Default Rates Page of the New Resource File Wizard
    • Save As Dialog Box (Ancillary Files)
    • Calendar Sets
    • Resource Components
    • Options Page of the Advance Calendar Wizard
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Results or Field Names
    • Manual Forecasts
  • rate
  • rate edit tab
  • rate file
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Enable a User to Access a Resource File
    • File Format for Importing Apportionment Mapping
    • Validity Check Process
    • Create a New Resource File
    • Resource File Security
    • Rate Tags
    • General Information Page of the New Project Wizard
    • Rate File Information Tags
    • Files Tab of the Project Properties Dialog Box
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Resources and Rates Page of the Integration Wizard
    • Example Rate File
    • Enable a Group to Access a Rate File
    • Ancillary File Validations Page of the Validity Check Wizard
    • Required Template Files
    • Save As Dialog Box (Ancillary Files)
    • Resource File Information Tags
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • General Tab of the Resource File Properties Dialog Box
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Class Information Tags
    • Code View
    • XML Configuration File
    • Lookup Dialog Box
    • Assign a Rate Set to a Result
    • Sample Earned Value Calculation
    • Preparing Cobra for Schedule Integration
    • Purge Dialog Box
    • Rate File Security
    • Rate File Properties Dialog Box
    • XML Configuration Object Interface
    • Enable a User to Access a Rate File
    • Default Rates Page of the New Resource File Wizard
    • Rate Files
    • Save As Dialog Box (Ancillary Files)
    • Calendar Sets
    • Resource Components
    • Options Page of the Advance Calendar Wizard
    • Ancillary Files Page of the New Project Wizard
    • Create a New Rate File
  • rate file properties
    • Display the Rate File Properties Dialog Box Tabs without Opening a Rate File
    • Display the Rate File Properties Dialog Box Tabs from an Open Rate File
    • Access Control Tab of the Rate File Properties Dialog Box
    • Code Fields Tab of the Rate File Properties Dialog Box
    • Rate File Properties Dialog Box
    • General Tab of the Rate File Properties Dialog Box
  • rate file properties
  • rate set
    • Rename Dialog Box
    • Rate Sets
    • Procedures
    • File Format for Importing Apportionment Mapping
    • Delete a Rate Set
    • Add a Rate to an Existing Rate Set
    • Calculations Tab of the Resource View
    • Rate Tags
    • Reporting
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Sub-Projects Validation Dialog Box
    • Report Categories
    • Rate Sets Grid
    • Ancillary File Validations Page of the Validity Check Wizard
    • Rename a Rate Set
    • Generate Rates for an Existing Rate Set
    • Rate Set Options Page of the Add Rate Set Wizard
    • Resource File Information Tags
    • Custom Cost Classes
    • Add Results to a Resource
    • Assign a Rate Set to a Result
    • Delete a Rate From a Rate Set
    • Add a Rate Set to a Rate File
    • Results Tab of the Resource File Properties Dialog Box
    • Template Resource Files
    • Resource Calculation Tags
    • Resource Components
    • Options Page of the Advance Calendar Wizard
    • Add Resource Results Dialog Box
  • rate set wizard
  • rate view
    • Procedures
    • Rate View
    • Details Tab of the Rate View
    • Rate Sets Grid
    • Display the Details Tab of the Rate View
    • Display the Rate View using the Rates Group Bar
    • Display the Rate View using the Cobra Button
    • Shortcut Menu
  • rates
    • Rates
    • Procedures
    • Rates
  • rates grid
  • rates pane
    • Rates Pane Column Definitions
    • Rates Pane
    • Shortcut Menu
  • recal wizard
  • recalc
    • Project Selection Page of the Recalc Wizard
    • Recalculate Costs
    • Options Page of the Recalc Wizard
    • Results Page of the Recalc Wizard
    • Procedures
    • Criteria Selection Page of the Recalc Wizard
    • Recalc Wizard
    • Recalc
    • Process Complete Page of the Recalc Wizard
    • Recalculation Techniques
    • Process Running Page of the Recalc Wizard
    • Confirmation Page of the Recalc Wizard
    • Classes Page of the Recalc Wizard
    • Date Range Page of the Recalc Wizard
    • Recalculate Process
  • recalc wizard
    • Project Selection Page of the Recalc Wizard
    • Recalculate Costs
    • Options Page of the Recalc Wizard
    • Results Page of the Recalc Wizard
    • Procedures
    • Criteria Selection Page of the Recalc Wizard
    • Recalc Wizard
    • Recalc
    • Process Complete Page of the Recalc Wizard
    • Recalculation Techniques
    • Process Running Page of the Recalc Wizard
    • Confirmation Page of the Recalc Wizard
    • Date Range Page of the Recalc Wizard
  • recalculate
  • recalculation
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Process Logs
    • Project Selection Page of the Recalc Wizard
    • Recalc Preferences
    • Recalculate Costs
    • Apportionment Process
    • Options Page of the Recalc Wizard
    • Results Page of the Recalc Wizard
    • wInsight Database Page of the wInsight Wizard
    • Procedures
    • Criteria Selection Page of the Recalc Wizard
    • Recalc Wizard
    • Recalc
    • Process Complete Page of the Recalc Wizard
    • Recalculation Techniques
    • Process Running Page of the Recalc Wizard
    • Confirmation Page of the Recalc Wizard
    • Classes Page of the Recalc Wizard
    • Date Range Page of the Recalc Wizard
  • reclass
    • Process Running Page of the Reclass Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • Process Logs
    • Confirmation Page of the Reclass Wizard
    • Supported Processes, Operations, and Data
    • Project Selection Page of the Reclass Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Using Spread
    • Reclass
    • Target Class Page of the Reclass Wizard
    • Process Complete Page of the Reclass Wizard
    • Procedures
    • Reclass Process
    • Reclass Preferences
    • Secure Baseline Dates
    • Reclass Guidelines
    • Options Page of the Reclass Wizard
    • Criteria Page of the Reclass Wizard
    • Cobra Web Service
    • Process Logs Dialog Box
    • Reclass Wizard
    • Date Range Page of the Reclass Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Source Class Page of the Reclass Wizard
    • Reclass a Class
  • reclass wizard
    • Process Running Page of the Reclass Wizard
    • Confirmation Page of the Reclass Wizard
    • Project Selection Page of the Reclass Wizard
    • Reclass
    • Target Class Page of the Reclass Wizard
    • Process Complete Page of the Reclass Wizard
    • Procedures
    • Options Page of the Reclass Wizard
    • Criteria Page of the Reclass Wizard
    • Reclass Wizard
    • Date Range Page of the Reclass Wizard
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Source Class Page of the Reclass Wizard
    • Reclass a Class
  • reconcile
  • reconcile log
    • Supported Processes, Operations, and Data
    • Reconcile Log Process
    • Cobra Web Service
  • reconcile milestone weights
    • Reconcile Milestone Weights
    • Reconcile Milestone Weight Variance Dialog Box
  • rename
  • rename control account dialog box
  • rename dialog box
  • rename work package dialog box
  • reorder codes dialog box
    • Display the Reorder Resources/Codes Dialog Box
    • Display the Reorder Resources/Codes Dialog Box
  • reorder resources dialog box
    • Display the Reorder Resources/Codes Dialog Box
    • Display the Reorder Resources/Codes Dialog Box
  • replace resources
    • Replace Resources Wizard
    • Procedures
    • Process Running Page of the Replace Resources Wizard
    • Project Selection Page of the Replace Resources Wizard
    • Replace Resources
    • Confirmation Page of the Replace Resources Wizard
    • Resource Selection Page of the Replace Resources Wizard
    • Replace or Merge Resources
    • Process Complete Page of the Replace Resources Wizard
    • Process Logs Dialog Box
    • Replace Resources Process
  • replace resources wizard
    • Replace Resources Wizard
    • Procedures
    • Process Running Page of the Replace Resources Wizard
    • Project Selection Page of the Replace Resources Wizard
    • Replace Resources
    • Confirmation Page of the Replace Resources Wizard
    • Resource Selection Page of the Replace Resources Wizard
    • Replace or Merge Resources
    • Process Complete Page of the Replace Resources Wizard
  • replan
    • Process Complete Page of the Replan Wizard
    • Work Package Name Page of the Replan Wizard
    • Procedures
    • Process Running Page of the Replan Wizard
    • Method Page of the Replan Wizard
    • Criteria Page of the Replan Wizard
    • Replan
    • Replan Preferences
    • Confirmation Page of the Replan Wizard
    • Project Selection Page of the Replan Wizard
    • Replan Process
    • Options Page of the Replan Wizard
    • Replan Wizard
    • Perform Project Replan
  • replan wizard
    • Process Complete Page of the Replan Wizard
    • Work Package Name Page of the Replan Wizard
    • Procedures
    • Process Running Page of the Replan Wizard
    • Method Page of the Replan Wizard
    • Criteria Page of the Replan Wizard
    • Replan
    • Confirmation Page of the Replan Wizard
    • Project Selection Page of the Replan Wizard
    • Options Page of the Replan Wizard
    • Replan Wizard
    • Perform Project Replan
  • report
    • Data Tool
    • Performance Data Page of the wInsight Wizard
    • Code Assignments Tab of the Project Properties Dialog Box
    • Report Content Parameters
    • Application Preferences
    • Data Access Tab of the Application Preferences Dialog Box
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • Report Information Tags
    • Reorder Resources
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Analyze Preferences
    • Report Template Format
    • Create Graph Reports from the Analyze Form
    • Settings Page of the New Project Wizard
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Baseline Tags
    • New Filter Dialog Box of the Report Wizard
    • Thresholds Tab of the Code File Properties Dialog Box
    • Report Criterion Parameters
    • Confirmation Page of the Report Wizard
    • Use a Code File in Multiple Projects
    • Reduce Memory Consumption for Very Large Reports
    • Analyze Options Dialog Box
    • Report Parameters
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Calculations Tab of the Resource View
    • Reporting
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Back Up Your Data
    • Personal Reports Pane
    • Copy Down Code Assignments to Child Resources
    • Projects
    • New Filter Expression Dialog Box of the Report Wizard
    • Report Properties Dialog Box
    • Calculated Results
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • General Tab of the Application Preferences Dialog Box
    • Code Fields Page of the New Code File Wizard
    • Report Wizard
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Report Options
    • Report Categories
    • General Information Page of the New Code File Wizard
    • Select EVMS Acceptance for a Project
    • Results Page of the Report Wizard
    • Configure Cobra to Work with Microsoft Project Server
    • Resources
    • Open Dialog Box of the Calculated Results Wizard
    • Report Wizard Parameters
    • Miscellaneous Page of the wInsight Wizard
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Calendars
    • Actual Cost Import File
    • Cost Sets Page of the Report Wizard
    • Manage Sorts Dialog Box of the Report Wizard
    • Batch Reports Dialog Box
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • Ancillary Reports
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • Apportionment Process
    • Access Control Page of the Report Wizard
    • Code Fields Page of the New Resource File Wizard
    • Report Types
    • User Preferences Dialog Box
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Thresholds Page of the New Resource File Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • New Sort Dialog Box of the Report Wizard
    • Notes Tab of the Resource View
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Log Operation Page of the Project Audit Wizard
    • Contract Information Tab of the Project Properties Dialog Box
    • Flag Periods
    • Log Change Comment Dialog Box
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Save Graph Reports as Graphic Files
    • Resources and Code Files
    • Formula Tags
    • Element of Cost Page of the wInsight Wizard
    • Frozen Forecasts
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Change Management Tags
    • Cobra 8.4 Help System
    • Retain EAC
    • Planning Reports
    • Perform Project Analysis
    • Validate Code Assignments — Solve Roll-Up Issues
    • New Sort Expression Dialog Box of the Report Wizard
    • Resources
    • Style Page of the Report Wizard
    • Set Reporting Options
    • Codes
    • Cost Sets Tab of the Project Properties Dialog Box
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Process Logs Dialog Box
    • Resource-Loaded Schedule
    • Manage Filters Dialog Box of the Report Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Generate a Report
    • Calendar Sets
    • Resource Components
    • Column Reports
    • Reorder Codes
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Time-phased Reports
    • Report Filter Information Tags
    • Process Complete Page of the Report Wizard
    • Results or Field Names
    • Reports Tab of the Application Preferences Dialog Box
    • Control Account Versus Work Package Level
    • Options Page of the ANSI EIA X12 Wizard
    • Report Templates
    • Fields Page of the New Project Wizard
  • report categories
    • Format Reports
    • Ancillary Reports
    • Export Reports
    • Graphic Reports
    • Generate a Report
  • report parameters
  • report properties
    • Report Information Tags
    • Report Properties Dialog Box
    • Report Categories
    • Access Control Page of the Report Wizard
  • report properties dialog box
    • Access Control Tab of the Report Properties Dialog Box
    • Procedures
    • Information Tab of the Report Properties Dialog Box
    • General Tab of the Report Properties Dialog Box
    • Report Definition Tab of the Report Properties Dialog Box
    • Display the Report Properties Dialog Box
  • report tags
    • Report Information Tags
    • Calendar Holiday Tags
    • Calendar File Information Tags
    • Explanation of Variance Narrative Tags
    • Rate Tags
    • Cost Set Information Tags
    • Rate File Information Tags
    • Code File Information Tags
    • Project Information Tags
    • Resource File Information Tags
    • Apportionment Mapping Tags
    • Work Package Tags
    • Class Information Tags
    • Milestone Tags
    • Code Tags
    • Resource Assignment Tags
    • Note Information Tags
    • Change Management Tags
    • Rate Set Tags
    • Control Account Tags
    • Resource Calculation Tags
    • Control Account and Work Package Note Tags
    • Calendar Period Tags
    • Resource Tags
    • Report Filter Information Tags
  • report template
    • Report Information Tags
    • Calendar Holiday Tags
    • Analyze Preferences
    • Report Template Format
    • Calendar File Information Tags
    • Explanation of Variance Narrative Tags
    • Report Criterion Parameters
    • Reduce Memory Consumption for Very Large Reports
    • Analyze Options Dialog Box
    • Report Parameters
    • Rate Tags
    • Cost Set Information Tags
    • Rate File Information Tags
    • Code File Information Tags
    • Report Options
    • Project Information Tags
    • Report Wizard Parameters
    • Resource File Information Tags
    • Work Package Tags
    • Property Tags
    • Class Information Tags
    • Milestone Tags
    • Report Template Tags
    • Code Tags
    • Section Tags
    • Resource Assignment Tags
    • Formula Tags
    • Note Information Tags
    • Change Management Tags
    • Rate Set Tags
    • Control Account Tags
    • Resource Calculation Tags
    • Other Tags
    • Style Page of the Report Wizard
    • Report Template Location
    • Control Account and Work Package Note Tags
    • Resource Tags
    • Report Filter Information Tags
    • Reports Tab of the Application Preferences Dialog Box
    • Report Templates
  • report template tags
    • Calendar Holiday Tags
    • Property Tags
    • Section Tags
    • Formula Tags
    • Other Tags
    • Calendar Period Tags
  • report wizard
    • Report Content Parameters
    • IPMR Format 2 Summary Page of the Report Wizard
    • Projects Selection Page of the Report Wizard
    • Audit Reports
    • New Filter Dialog Box of the Report Wizard
    • Report Criterion Parameters
    • Confirmation Page of the Report Wizard
    • Calendar Page of the Report Wizard
    • Reduce Memory Consumption for Very Large Reports
    • Report Parameters
    • Sub-Totals Page of the Report Wizard
    • Process Running Page of the Report Wizard
    • Save and Run Page of the Report Wizard
    • Personal Reports Pane
    • Copy Filter Dialog Box of the Report Wizard
    • Codes and the Report Wizard
    • New Filter Expression Dialog Box of the Report Wizard
    • Report Wizard
    • Report Options
    • Report Categories
    • Results Page of the Report Wizard
    • Open Dialog Box of the Calculated Results Wizard
    • Report Wizard Parameters
    • Cost Sets Page of the Report Wizard
    • Manage Sorts Dialog Box of the Report Wizard
    • Filter and Sort Page of the Report Wizard
    • Edit Filter Expression Dialog Box of the Report Wizard
    • User Preferences Dialog Box
    • Procedures
    • Copy Sort Dialog Box of the Report Wizard
    • Display the Report Wizard
    • New Sort Dialog Box of the Report Wizard
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
    • Report Page of the Report Wizard
    • Create a Calculated Result
    • New Sort Expression Dialog Box of the Report Wizard
    • Display the Calculated Results Wizard
    • Style Page of the Report Wizard
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Manage Filters Dialog Box of the Report Wizard
    • Process Complete Page of the Report Wizard
  • report Wizard
  • reporting tab
    • Keyboard Shortcuts
    • Reporting Tab
  • reports
    • Restoring Reports and Configurations
    • File Backup
    • Customization of Reports
    • Export Reports
    • Report Template Tags
    • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
    • Reporting Tab
    • Reports
  • resource
    • Data Tool
    • Performance Data Page of the wInsight Wizard
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Import File Field Mapper Page of the Integration Wizard
    • Enable a User to Access a Resource File
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • Resource Assignment Percent Complete Dialog Box
    • Rename Dialog Box
    • Reorder Resources
    • Preparing the Primavera Schedule
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Confirmation Page of the New Resource File Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Examples of Manual Forecast Calculations
    • Procedures
    • Baseline Tags
    • Perform Apportionment Mapping
    • Add a Child Resource to a Resource
    • Report Criterion Parameters
    • File Format for Importing Apportionment Mapping
    • Get Cobra Spread Process
    • Reorder Resources/Codes Dialog Box
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Validity Check Process
    • Enable a Group to Access a Resource File
    • Rename an Ancillary File
    • Spread Budgets Using Pre-defined Spread Methods
    • Create a New Resource File
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Resource File Security
    • Calculations Tab of the Resource View
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Variance Thresholds
    • Reporting
    • General Information Page of the New Project Wizard
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Export and Import Time-Phased Resource Assignments
    • New Filter Expression Dialog Box of the Report Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Integration Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Copy Child Resources to a Resource
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • Calculated Results
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Files Tab of the Project Properties Dialog Box
    • Results Page of the Integration Wizard
    • Field Mapper Page of the Integration Wizard
    • Add Calculations to a Resource
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Resources and Rates Page of the Integration Wizard
    • Define Resource Apportionment
    • Project Selection Page of the Update Totals Wizard
    • Status Page of the Integration Wizard-Files
    • Integration Tab of the Application Preferences Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Prompt Level Page of the Project Audit Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • General Information Page of the New Code File Wizard
    • Results Page of the Report Wizard
    • Reorder Resources/Codes Dialog Box
    • Select Configuration Page of the Update Open Plan Resources Wizard
    • Resources
    • Data Import-Ancillary Data
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Delete a Result from a Resource
    • Variance Thresholds
    • Required Template Files
    • Save As Dialog Box (Ancillary Files)
    • Manage Sorts Dialog Box of the Report Wizard
    • Calculate Progress
    • Add a Resource to a Resource File
    • Resource File Information Tags
    • Add a Resource Assignment
    • Import File Validation
    • File Selection Page of the Integration Wizard
    • Other Tab of the Application Preferences Dialog Box
    • Import Location Page of the Assignment Import Wizard
    • Project Selection Page of the Reclass Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • General Tab of the Resource File Properties Dialog Box
    • Progress Techniques
    • Order Resource Results Dialog Box
    • Copy Calculations from Another Resource
    • Open File Dialog Box
    • Open File Dialog Box
    • Delete a Resource from a Resource File
    • Code Fields Page of the New Resource File Wizard
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • Integration Configuration Page of the Integration Wizard
    • Structure Tab of the Resource File Properties Dialog Box
    • Data Import Using Scheduling Tools and Files
    • XML Configuration File
    • Lookup Dialog Box
    • Assign a Rate Set to a Result
    • Sample Earned Value Calculation
    • Integration Configuration Page of the Integration Wizard
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Resource Assignments
    • Forecast Calculations
    • Notes Tab of the Resource View
    • Template Resource Files
    • Purge Dialog Box
    • Import Budget Data into Cobra
    • Cobra Components
    • Log Change Comment Dialog Box
    • Open Plan Fields Imported
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Resource Results Page of the New Resource File Wizard
    • Adjust Budget Spreads Manually
    • Thresholds Tab of the Resource File Properties Dialog Box
    • Integration Wizard Preferences
    • Plan Resource Information
    • Criteria Selection Page of the Recalc Wizard
    • Resources and Code Files
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • New File Dialog Box
    • Spread Curve Dialog Box
    • Retain EAC
    • Resources Pane
    • Resource File Structure
    • Procedures
    • Examples of Statistical Forecast Calculations
    • Codes Page of the Integration Wizard-MS Project
    • Confirmation Page of the Replace Resources Wizard
    • Thresholds Tab of the Resource View
    • Earned Preferences
    • Resource View
    • Loading Resource Files from Open Plan
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Status Page of the Integration Wizard
    • Resource Calculation Tags
    • Resource Selection Page of the Replace Resources Wizard
    • Resources
    • Resource File Structure Page of the New Resource File Wizard
    • Criteria Page of the Reclass Wizard
    • Codes
    • Resource Tags
    • New File Dialog Box
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Process Lock
    • Options Page of the Calculate Forecast Wizard
    • Process Logs Dialog Box
    • Update Totals Process
    • Resource-Loaded Schedule
    • Update Open Plan Resources
    • Loading Resource Files from Open Plan
    • Results Pane of the Analyze Form
    • Data Formats
    • Save As Dialog Box (Ancillary Files)
    • Resource Components
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Status File Field Mapper Page of the Integration Wizard
    • Results or Field Names
    • Access Control Page of the New Resource File Wizard
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
    • Set Up Projects and Project Baselines
    • Fields Page of the New Project Wizard
  • resource apportionment
  • resource assignment
    • Spread Budgets Using Pre-defined Spread Methods
    • Spread Updated Budgets for Resources
    • Spread Dialog Box
    • Using Spread
    • Spread Curve Dialog Box
  • resource assignment percent complete dialog box
  • resource assignments page
  • resource edit tab
  • resource file
    • Performance Data Page of the wInsight Wizard
    • Import File Field Mapper Page of the Integration Wizard
    • Enable a User to Access a Resource File
    • Reorder Resources
    • Preparing the Primavera Schedule
    • Confirmation Page of the New Resource File Wizard
    • Add a Child Resource to a Resource
    • Report Criterion Parameters
    • File Format for Importing Apportionment Mapping
    • Reorder Resources/Codes Dialog Box
    • Validity Check Process
    • Enable a Group to Access a Resource File
    • Rename an Ancillary File
    • Create a New Resource File
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Resource File Security
    • Calculations Tab of the Resource View
    • Variance Thresholds
    • General Information Page of the New Project Wizard
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Copy Child Resources to a Resource
    • Files Tab of the Project Properties Dialog Box
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Resources and Rates Page of the Integration Wizard
    • Integration Tab of the Application Preferences Dialog Box
    • Ancillary File Validations Page of the Validity Check Wizard
    • Results Page of the Report Wizard
    • Reorder Resources/Codes Dialog Box
    • Resources
    • Apportionment Setup Steps
    • Delete a Result from a Resource
    • Variance Thresholds
    • Required Template Files
    • Add a Resource to a Resource File
    • Resource File Information Tags
    • Other Tab of the Application Preferences Dialog Box
    • General Tab of the Resource File Properties Dialog Box
    • Order Resource Results Dialog Box
    • Delete a Resource from a Resource File
    • Code Fields Page of the New Resource File Wizard
    • Add Results to a Resource
    • Structure Tab of the Resource File Properties Dialog Box
    • XML Configuration File
    • Assign a Rate Set to a Result
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Notes Tab of the Resource View
    • Template Resource Files
    • Purge Dialog Box
    • Resource Results Page of the New Resource File Wizard
    • Thresholds Tab of the Resource File Properties Dialog Box
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • Resources Pane
    • Resource File Structure
    • Procedures
    • Thresholds Tab of the Resource View
    • Resource Calculation Tags
    • Resources
    • Resource File Structure Page of the New Resource File Wizard
    • Codes
    • Resource Tags
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Results Pane of the Analyze Form
    • Resource Components
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Access Control Page of the New Resource File Wizard
  • resource file properties
    • Code Fields Tab of the Resource File Properties Dialog Box
    • Display the Resource File Properties Dialog Box Tabs from an Open Resource File
    • Additional Information in Resources
    • Procedures
    • Display the Resource File Properties Dialog Box Tabs without Opening a Resource File
  • resource file properties dialog box
    • Resource File Properties Dialog Box
    • Thresholds Tab of the Resource File Properties Dialog Box
  • resource information
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Integration Configuration Page of the Integration Wizard
    • Change Control Page of the Integration Wizard
    • Select Configuration Page of the Update Open Plan Resources Wizard
    • Resource-Loaded Schedule
    • Integration Configuration Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Preparing Cobra for Schedule Integration
    • Open Plan Fields Imported
    • Resource-Loaded Schedule
    • Resource Components
  • resource result
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Order Resource Results Dialog Box
    • Add Results to a Resource
    • Add Resource Results Dialog Box
  • resource view
    • Enable a User to Access a Resource File
    • Reorder Resources
    • Add a Child Resource to a Resource
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Resource View
    • Resource File Security
    • Resources Grid of the Resource View
    • Calculations Tab of the Resource View
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Access Control Tab of the Resource File Properties Dialog Box
    • Copy Child Resources to a Resource
    • Add Calculations to a Resource
    • Assign Element of Cost to a Resource
    • Define Resource Apportionment
    • Copy Element of Cost Value to Child Resources
    • Reorder Resources/Codes Dialog Box
    • Delete a Result from a Resource
    • Add a Resource to a Resource File
    • General Tab of the Resource File Properties Dialog Box
    • Order Resource Results Dialog Box
    • Copy Calculations from Another Resource
    • Delete a Resource from a Resource File
    • Add Results to a Resource
    • Structure Tab of the Resource File Properties Dialog Box
    • Display the Resource View using the Resources Group Bar
    • Assign a Rate Set to a Result
    • Procedures
    • Results Tab of the Resource File Properties Dialog Box
    • Notes Tab of the Resource View
    • Display the Resource View using the Cobra Button
    • Thresholds Tab of the Resource View
    • Resource View
    • Copy Resource Calculations Dialog Box
    • Add Resource Results Dialog Box
    • Element of Cost
  • resources
    • Copy Down Threshold Values to Child Resources
    • Code the Resources for IPMR Format 2 Reports
    • Copy Down Codes Dialog Box
    • Define Costs for Resources
    • Copy Children Dialog Box
    • Copy Down Codes Dialog Box
    • Copy Children Dialog Box
    • Examples of Resources
  • resources grid
    • Resources Grid of the Resource View
    • Assign Element of Cost to a Resource
    • Copy Element of Cost Value to Child Resources
    • Delete a Result from a Resource
    • Order Resource Results Dialog Box
    • Delete a Resource from a Resource File
    • Add Results to a Resource
    • Assign a Rate Set to a Result
    • Procedures
    • Copy Resource Calculations Dialog Box
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Element of Cost
  • resources group bar
  • resources pane
    • Shortcut Menu
    • Resources Pane Column Definitions
  • respread
    • Date Range Page of the Respread Wizard
    • Options Page of the Respread Wizard
    • Respread the Budget
    • Process Running Page of the Respread Wizard
    • Project Selection Page of the Respread Wizard
    • Change Control Page of the Integration Wizard
    • When Calendar Dates Change
    • Supported Processes, Operations, and Data
    • Calendars
    • Criteria Selection Page of the Respread Wizard
    • Using Spread
    • Respread Wizard
    • Respread Process
    • Process Complete Page of the Respread Wizard
    • Respread
    • Recalc
    • Procedures
    • Confirmation Page of the Respread Wizard
    • Cobra Web Service
    • Process Logs Dialog Box
    • Classes Page of the Respread Wizard
    • Resource Components
  • respread wizard
    • Date Range Page of the Respread Wizard
    • Options Page of the Respread Wizard
    • Respread the Budget
    • Process Running Page of the Respread Wizard
    • Project Selection Page of the Respread Wizard
    • Criteria Selection Page of the Respread Wizard
    • Respread Wizard
    • Process Complete Page of the Respread Wizard
    • Respread
    • Procedures
    • Confirmation Page of the Respread Wizard
    • Classes Page of the Respread Wizard
  • restoration
    • File Restore
    • Restore Data from a Backup File
  • restore
    • Restoring Reports and Configurations
    • Restore Process
    • File Restore
    • Restore Dialog Box
    • Restore Dialog Box
  • restore utility
  • result
    • Data Tool
    • Performance Data Page of the wInsight Wizard
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Insert Column Dialog Box
    • Data Access Tab of the Application Preferences Dialog Box
    • Code Files
    • Resource Assignment Percent Complete Dialog Box
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Analyze Preferences
    • First Result and Derived Costs
    • Preparing the Primavera Schedule
    • Create Graph Reports from the Analyze Form
    • Results Page of the ANSI EIA X12 Wizard
    • Examples of Manual Forecast Calculations
    • Get Cobra Spread Process
    • Use a Code File in Multiple Projects
    • Validity Check Process
    • Analyze Options Dialog Box
    • Sub-Totals Page of the Report Wizard
    • Class and Results Page of the Integration Wizard
    • Calculations Tab of the Resource View
    • Apportionment Definition Tab of the Resource View
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Calculated Results
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • General Tab of the Application Preferences Dialog Box
    • The Field Mapper
    • Statistical Forecasts
    • Results Page of the Integration Wizard
    • Field Mapper Page of the Integration Wizard
    • Integration Tab of the Application Preferences Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Ancillary File Validations Page of the Validity Check Wizard
    • Results Page of the Report Wizard
    • Resources
    • Data Import-Ancillary Data
    • Examples of Forecast Calculations
    • Open Dialog Box of the Calculated Results Wizard
    • Apportionment Setup Steps
    • Resource-Loaded Schedule
    • Delete a Result from a Resource
    • Cost Sets Page of the Report Wizard
    • Resource File Information Tags
    • General Tab of the Classes Tab
    • Import File Validation
    • Classes Tab of the Project Properties Dialog Box
    • How Cobra Calculates Progress to Determine Earned Value
    • Custom Cost Classes
    • Order Resource Results Dialog Box
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Assign a Rate Set to a Result
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Results Tab of the Resource File Properties Dialog Box
    • Resource Assignments
    • Forecast Calculations
    • Template Resource Files
    • Log Change Comment Dialog Box
    • Running the Process or Operation
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
    • Adjust Budget Spreads Manually
    • Run the SQL Command Utility
    • Copy Project Process
    • Element of Cost Page of the wInsight Wizard
    • Frozen Forecasts
    • Edit Column Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Examples of Statistical Forecast Calculations
    • Earned Preferences
    • Considerations When Creating Field Names
    • Resource Calculation Tags
    • Resources
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Update Totals Process
    • Resource-Loaded Schedule
    • Results Pane of the Analyze Form
    • Data Formats
    • Resource Components
    • Options Page of the Advance Calendar Wizard
    • Column Reports
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Time-phased Reports
    • Results or Field Names
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
    • Set Up Projects and Project Baselines
    • Reconcile Milestone Weight Variance Dialog Box
  • results page
    • Results Page of the ANSI EIA X12 Wizard
    • Class and Results Page of the Integration Wizard
    • Results Page of the Integration Wizard
    • Results Page of the Report Wizard
  • ribbon
    • Edit Tab of the Rate View
    • Processes Tab
    • Preferences
    • Edit Tab of the Calendar View
    • Cobra Button
    • Manage
    • Custom Menu Tab
    • Cobra Explorer
    • Tools Tab
    • Edit Tab of the Code View
    • Help
    • Edit Tab of the Resource View
    • Reporting Tab
    • Integration Tab
    • Edit Tab of the Project View
  • rolling wave
    • Progressing
    • Process Complete Page of the Rolling Wave Wizard
    • Calendar Definition
    • Process Running Page of the Rolling Wave Wizard
    • Project Selection Page of the Rolling Wave Wizard
    • Options Page of the Rolling Wave Wizard
    • Rolling Wave
    • Supported Processes, Operations, and Data
    • Rolling Wave Dialog Box of the Project Properties Dialog Box
    • Assign a Rolling Wave Calendar to the Project
    • Create a Rolling Wave Calendar
    • Effect of Running the Process
    • Confirmation Page of the Rolling Wave Wizard
    • Rolling Wave Process
    • Rolling Wave Wizard
    • Procedures
    • Rolling Wave Process or Weekly Earned Value
    • Cobra Web Service
    • Run the Rolling Wave Process
  • rolling wave calendar
  • rolling wave process
    • Calendars
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Advance Calendar Process
    • Calendar Sets
    • Options Page of the Advance Calendar Wizard
    • Ancillary Files Page of the New Project Wizard
  • rolling wave wizard
    • Process Complete Page of the Rolling Wave Wizard
    • Calendar Definition
    • Process Running Page of the Rolling Wave Wizard
    • Project Selection Page of the Rolling Wave Wizard
    • Options Page of the Rolling Wave Wizard
    • Rolling Wave
    • Assign a Rolling Wave Calendar to the Project
    • Create a Rolling Wave Calendar
    • Confirmation Page of the Rolling Wave Wizard
    • Rolling Wave Wizard
    • Procedures
    • Run the Rolling Wave Process
  • rules
  • save and load page
    • Save and Load Page of the Integration Wizard
    • Save and Load Page of the Integration Wizard
  • save and run page
    • Confirmation Page of the Report Wizard
    • Access Control Page of the Report Wizard
    • Save and Run Page of the Cost Data Wizard
  • save as dialog box
    • Display the Save As Dialog Box (Ancillary Files)
    • Display the Save As Dialog Box (Projects)
    • Display the Save As Dialog Box (Projects)
    • Display the Save As Dialog Box (Ancillary Files)
  • save view
    • Manage Views Dialog Box
    • Manage Views
    • Save Current View As Dialog Box
    • Save and Share View
    • Modify an Existing View
    • Create a View
    • Select Dialog Box
  • scale factor
    • Report Template Format
    • Miscellaneous Page of the wInsight Wizard
    • Style Page of the Report Wizard
  • scaling
  • schedule
  • schedule integration
    • Preparing Cobra for Schedule Integration
    • Process Lock
  • scheduling data
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Preparing Cobra for Schedule Integration
    • Customization of Integration Process
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Customization of Processes
  • scheduling tool
    • Action Selection Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Integration Configuration Page of the Integration Wizard
    • Integration Wizard-Scheduling Tools and Files
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Cobra 8.4 Help System
  • scheduling tools
    • Change Control Page of the Integration Wizard
    • Process Complete Page of the Integration Wizard
    • Save and Load Page of the Integration Wizard
    • Process Running Page of the Integration Wizard
    • Access Control Page of the Integration Wizard
    • Confirmation Page of the Integration Wizard
  • scrip file
  • script file
    • Create Windows Shortcut for the API Script
    • Calculate Progress Process
    • Initialize Forecast Process
    • Delete Project Process
    • Restore Process
    • Batch Report Process
    • Get Cobra Spread Process
    • Cost Data Export Process
    • Validity Check Process
    • Calculate Forecast Process
    • Backup Project Process
    • Integrate Ancillary Data Process
    • Create Project from Template Process
    • SQL Command Process
    • Apportionment Process
    • Integrate Actual Costs Process
    • Reclass Process
    • Respread Process
    • Reconcile Log Process
    • Rolling Wave Process
    • wInsight Export Process
    • Integrate Project Data Process
    • Copy Project Process
    • Integrate Apportionment Mapping Process
    • Set Project Baseline Process
    • Update Tphase Process
    • Advance Calendar Process
    • Integrate Apportionment Definition Process
    • Update Totals Process
    • ANSI EIA X12 Process
    • Replace Resources Process
    • Recalculate Process
  • security
    • Configuration Security
    • Enable a User to Access a Resource File
    • Change Owner Dialog Box
    • Save and Load Page of the Integration Wizard
    • Access Control Tab of the Calendar File Properties Dialog Box
    • SQL Command Utility
    • Delete Project Process
    • Enable a Group to Access a Resource File
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Resource File Security
    • Merge Sub-Projects into a New Project
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Send a Message to Users
    • Access Control Tab of the Resource File Properties Dialog Box
    • Access Control Tab of the Code File Properties Dialog Box
    • Terminate a Session
    • Code Fields Page of the New Code File Wizard
    • Merge Sub-Projects into a New Project
    • Procedures
    • EPM Security Administrator Functions
    • Enable a Group to Access a Code File
    • Security Options for the Analyze Process
    • Enable a Group to Access a Rate File
    • Calendar File Security
    • Display the Change Ownership and Access Rights Dialog Box
    • Access Control
    • Set a Maximum Number of Login Tries
    • Display the New Project Wizard
    • Access Control Page of the New Code File Wizard
    • Access Control Page of the Report Wizard
    • Code Fields Page of the New Resource File Wizard
    • Disable Logins
    • Display the Change Owner Dialog Box
    • Procedures
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
    • Change Ownership and Access Rights
    • Enable a User to Access a Code File
    • Change Ownership and Access Rights Dialog Box
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Log Operation Page of the Project Audit Wizard
    • Contract Information Tab of the Project Properties Dialog Box
    • Display a Login Message
    • Display the Change Ownership and Access Rights Dialog Box
    • Change Ownership and Access Rights Dialog Box
    • Change the Owner of an Object
    • Access Control Page of the New Project Wizard
    • Procedures
    • Enable a User to Access a Calendar File
    • Procedures
    • Configuration Security Dialog Box
    • Enable a Group to Access a Calendar File
    • Additional Project Files
    • Rate File Security
    • Code File Security
    • Custom Menu Items
    • Change Access Rights Dialog Box
    • Cobra 8.4 Help System
    • Set Maximum Time of Inactivity
    • Run the EPM Security Administrator
    • Security
    • Enable a User to Access a Rate File
    • Turn Windows Authentication On or Off
    • Access Control Tab of the Project Properties Dialog Box
    • Codes
    • Access Control Page of the New Resource File Wizard
    • Change the Access Rights of an Object
    • Fields Page of the New Project Wizard
  • select files to restore dialog box
  • send message
  • sessions
  • set project baseline
  • set todate period
    • Set the TODATE Period
    • Extend the Calendar Periods
  • share view
    • Manage Views Dialog Box
    • Manage Views
    • Save Current View As Dialog Box
    • Save and Share View
    • Modify an Existing View
    • Create a View
    • Select Dialog Box
  • shortcut
  • shortcut menu
    • Shortcut Menu
    • Shortcut Menu
    • Analyze Edit Tab
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
  • shutdown
  • significant
    • Code Files
    • Preparing the Primavera Schedule
    • Baseline Tags
    • Structure Tab of the Code File Properties Dialog Box
    • Copy Child Resources to a Resource
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • General Information Page of the New Code File Wizard
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Log Change Comment Dialog Box
    • Code File Structure Page of the New Code File Wizard
    • Code File Structures
    • Loading Resource Files from Open Plan
    • Resource File Structure Page of the New Resource File Wizard
    • Loading Resource Files from Open Plan
  • significant change
    • Baseline Tags
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Log Change Comment Dialog Box
  • slip
    • Criteria Page of the Slip Wizard
    • Confirmation Page of the Slip Wizard
    • Slip By Page of the Slip Wizard
    • Procedures
    • Process Running Page of the Slip Wizard
    • Slip Wizard
    • Slip a Project
    • Slip
    • Process Complete Page of the Slip Wizard
    • Project Selection Page of the Slip Wizard
  • slip wizard
    • Criteria Page of the Slip Wizard
    • Confirmation Page of the Slip Wizard
    • Slip By Page of the Slip Wizard
    • Procedures
    • Process Running Page of the Slip Wizard
    • Slip Wizard
    • Slip a Project
    • Slip
    • Process Complete Page of the Slip Wizard
    • Project Selection Page of the Slip Wizard
  • sorts
    • Filters
    • Apply a Filter to a Column in the Spreadsheet Pane
    • Standard Filter Dialog Box
    • File Backup
    • Advanced Filter Dialog Box
  • source class
  • spread
    • Add Spread Curve Dialog Box
    • Spread Updated Budgets for Resources
    • Spread Dialog Box
    • Using Spread
  • spread curve
    • Application Preferences
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Get Cobra Spread Process
    • Spread Budgets Using Pre-defined Spread Methods
    • Resource Assignments Page of the Integration Wizard-Files
    • Spread Dialog Box
    • Add a Resource Assignment
    • Using Spread
    • Preparing the Open Plan Schedule
    • Respread
    • Spread Curve Dialog Box
    • Options Page of the Calculate Forecast Wizard
  • spreadsheet pane
    • Rename Work Package Dialog Box
    • Assign a Progress Technique to a Work Package
    • Add Work Package Dialog Box
    • Copy and Paste in the Project View
    • Rename a Work Package
    • Copy Work Package Dialog Box
    • Spreadsheet Pane of the Project View
    • Copy Control Account Dialog Box
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Standard Filter Dialog Box
    • Export and Import Time-Phased Resource Assignments
    • Delete Milestones or Steps
    • Add a New Work Package using the Dialog Box
    • Add Control Account Dialog Box
    • Rename Control Account Dialog Box
    • Update EAC Dialog Box
    • Add a New Control Account Manually
    • Spreadsheet Pane Column Definitions
    • Add Resource Assignment Dialog Box
    • Spread Dialog Box
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Copy a Work Package
    • Add a Resource Assignment
    • Import Location Page of the Assignment Import Wizard
    • Project View
    • Add a New Work Package Manually
    • Using Spread
    • Move a Work Package
    • Move a Control Account
    • Rename a Control Account
    • Move Work Package Dialog Box
    • Procedures
    • Add a New Control Account using the Dialog Box
    • Add Milestones or Steps
    • Reconcile Milestone Weights
    • Shortcut Menu
    • Advanced Filter Dialog Box
    • Update Totals Process
    • Using the Find Function
    • Modify Milestones or Steps
    • Additional User Fields
    • Manual Forecasts
    • Reconcile Milestone Weight Variance Dialog Box
  • sql command utility
    • Procedures
    • SQL Command Utility
    • SQL Command Utility Supported Parameters
    • SQL Command Process
    • Run the SQL Command Utility
    • SQL Language Extended Support
  • ssl
    • Configure the Cobra Web Service Instances and/or Gateway using Cobra Web Service Management Tool
    • Configuring the Cobra Web Service to Use Secure Socket Layers
    • Bind the Windows Server Certificate to the Cobra Web Service HTTPS Ports
    • Obtain the Authentication Certificate Information on the Cobra Web Service Machines
  • standard dialog box
  • status
    • Confirmation Page of the Integration Wizard
    • Progressing
    • Process Running Page of the Apportionment Calculation Wizard
    • Process Running Page of the Reclass Wizard
    • Save and Load Page of the Integration Wizard
    • Code Files
    • Process Running Page of the wInsight Wizard
    • Preparing the Primavera Schedule
    • Report Template Format
    • Project Selection Page of the Advance Calendar Wizard
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Process Running Page of the Project Audit Wizard
    • Explanation of Variance Narrative Tags
    • Process Running Page of the Advance Calendar Wizard
    • Process Running Page of the Calculate Forecast Wizard
    • Process Running Page of the Replan Wizard
    • Progress Techniques
    • Advance to Period Page of the Advance Calendar Wizard
    • Process Complete Page of the Export Calendar to Open Plan Wizard
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Actual Costs Preferences
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Replan Preferences
    • Integration Configuration Page of the Integration Wizard
    • Status Page of the Integration Wizard-Scheduling Tools
    • Process Complete Page of the Project Audit Wizard
    • Change Control Page of the Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • The Field Mapper
    • Statistical Forecasts
    • Process Complete Page of the ANSI EIA X12 Wizard
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Project Selection Page of the Calculate Forecast Wizard
    • Status Page of the Integration Wizard-Files
    • Recalc Preferences
    • Import File Preparation
    • Ancillary File Validations Page of the Validity Check Wizard
    • File Format for Importing Status Information
    • Spreadsheet Pane Column Definitions
    • Entering Actual Costs
    • Project Dates Page of the New Project Wizard
    • Process Running Page of the Validity Check Wizard
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Resource-Loaded Schedule
    • Calendars
    • Calculate Progress
    • Import File Validation
    • Process Running Page of the Slip Wizard
    • Process Running Page of the Calculate Progress Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • Apportionment Process
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Milestone Tags
    • Data Import-Status Data
    • How Cobra Spreads ETC
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Process Running Page of the ANSI EIA X12 Wizard
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Entering Actual Costs Using an Import File
    • Guidelines for Accurate Earned Value Management
    • Forecast Calculations
    • Running the Process or Operation
    • Process Running Page of the Freeze Forecast Wizard
    • Reclass Preferences
    • Integration Wizard-Actual Costs
    • File Selection Page of the Integration Wizard
    • Confirmation Page of the Advance Calendar Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • wInsight Database Page of the wInsight Wizard
    • Database Table Selection Page of the Integration Wizard
    • Integration Wizard Preferences
    • Recalc
    • Options Page of the Replan Wizard
    • Examples of Statistical Forecast Calculations
    • Access Control Page of the Integration Wizard
    • Project Selection Page of the Calculate Progress Wizard
    • Process Complete Page of the Validity Check Wizard
    • Status Page of the Integration Wizard
    • Import Status Data into Cobra
    • Advance Calendar Process
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Process Complete Page of the wInsight Wizard
    • Entering Actual Costs Manually
    • Resource-Loaded Schedule
    • Date Range Page of the Recalc Wizard
    • Calendar Sets
    • Options Page of the Advance Calendar Wizard
    • Column Reports
    • Ancillary Files Page of the New Project Wizard
    • Status File Field Mapper Page of the Integration Wizard
    • Process Complete Page of the Report Wizard
    • Included Costs Page of the Integration Wizard
    • Options Page of the Integration Wizard
    • Manual Forecasts
    • Set Up Projects and Project Baselines
  • structure tab
    • Structure Tab of the Code File Properties Dialog Box
    • Structure Tab of the Resource File Properties Dialog Box
  • subprojects
    • Merge Sub-Projects into a New Project
    • Remove Sub-Projects from a Master Project
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • Procedures
    • Remove Sub-Projects from a Master Project
    • Assign Sub-Projects to a Master Project
    • Merging a Master Project's Subprojects to Create a New Project
    • Multiproject Operations (Master and Subprojects)
    • Validate Sub-Projects
    • Validate Sub-Projects
    • Sub-Projects Page of the New Project Wizard
    • Multiproject Guidelines
    • Assign Sub-Projects to a Master Project
    • Create a Master Project
  • tab
  • tabbed pane
    • Project View
    • Tabbed Pane of the Project View
  • target class
  • template
    • Application Preferences
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Analyze Preferences
    • Preparing the Primavera Schedule
    • Report Template Format
    • Settings Page of the New Project Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Analyze Options Dialog Box
    • Resources and Rates Page of the Integration Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Resources
    • Resource Assignments Page of the Integration Wizard-Files
    • Required Template Files
    • Create Project from Template Process
    • XML Configuration File
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Template Resource Files
    • Additional Project Files
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Resources
    • Style Page of the Report Wizard
    • Application Settings
    • Report Templates
  • terminal service
  • terminated automatically
    • Set a Maximum Number of Login Tries
    • Set Maximum Time of Inactivity
    • Turn Windows Authentication On or Off
  • thresholds page
    • Thresholds Page of the New Code File Wizard
    • Thresholds Page of the New Resource File Wizard
  • thresholds tab
    • Thresholds Tab of the Code File Properties Dialog Box
    • Thresholds Tab of the Code View
    • Code View
    • Thresholds Tab of the Resource File Properties Dialog Box
    • Thresholds Tab of the Resource View
  • time phase detail pane
    • Copy and Paste in the Project View
    • Procedures
    • Spread Updated Budgets for Resources
    • Spread Dialog Box
    • Project View
    • Using Spread
    • Data Entry in the Time-phase Pane
    • Time-phase Detail Pane of the Project View
    • Spread Curve Dialog Box
  • time phase pane
    • Time-phase Pane of the Project View
    • Copy and Paste in the Project View
    • Spread Budgets Using Pre-defined Spread Methods
    • Supported Processes, Operations, and Data
    • Spread Updated Budgets for Resources
    • Add Resource Assignment Dialog Box
    • Spread Dialog Box
    • Project View
    • Using Spread
    • Data Entry in the Time-phase Pane
    • Spread Curve Dialog Box
    • Cobra Web Service
    • Time-phase Pane Field Descriptions
  • todate
    • Set the TODATE Period
    • Extend the Calendar Periods
  • tools tab
    • Keyboard Shortcuts
    • Tools Tab
  • top down planning
    • Top-Down Planning
    • Process Running Page of the Top-Down Planning Wizard
    • Confirmation Page of the Top-Down Planning Wizard
    • Procedures
    • Perform Top-Down Planning
    • Top-Down Planning Wizard
    • Results Page of the Top-Down Planning Wizard
    • Classes Page of the Top-Down Planning Wizard
    • Calculation Page of the Top-Down Planning Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Process Complete Page of the Top-Down Planning Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
  • top down planning wizard
    • Top-Down Planning
    • Process Running Page of the Top-Down Planning Wizard
    • Confirmation Page of the Top-Down Planning Wizard
    • Procedures
    • Perform Top-Down Planning
    • Top-Down Planning Wizard
    • Results Page of the Top-Down Planning Wizard
    • Classes Page of the Top-Down Planning Wizard
    • Calculation Page of the Top-Down Planning Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Process Complete Page of the Top-Down Planning Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
  • total row
  • troubleshooting
    • The server was unable to process the request due to an internal error
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • The encryption type requested is not supported by the KDC
    • Troubleshoot Oracle Error ORA-600 [kkqcscpcky:ficand] While Running Query with Parameter "_replace_virtual_columns=false"
    • The server was unable to process the request due to an internal error
    • The server was unable to process the request due to an internal error
    • The encryption type requested is not supported by the KDC
    • Troubleshooting Concurrency Issues
    • Update the "_replace_virtual_columns" Setting
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • The encryption type requested is not supported by the KDC
    • Troubleshooting Concurrency Issues
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • The server was unable to process the request due to an internal error
    • Troubleshooting Concurrency Issues
    • Troubleshooting Concurrency Issues
    • The encryption type requested is not supported by the KDC
    • The encryption type requested is not supported by the KDC
  • update codes
    • Update the Code Fields
    • Confirmation Page of the Update Codes Wizard
    • Update Code Page of the Update Codes Wizard
    • Update Codes
    • Update Codes Wizard
    • Process Running Page of the Update Codes Wizard
    • Project Selection Page of the Update Codes Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Procedures
    • Process Complete Page of the Update Codes Wizard
  • update codes wizard
    • Update the Code Fields
    • Confirmation Page of the Update Codes Wizard
    • Update Code Page of the Update Codes Wizard
    • Update Codes
    • Update Codes Wizard
    • Process Running Page of the Update Codes Wizard
    • Project Selection Page of the Update Codes Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Procedures
    • Process Complete Page of the Update Codes Wizard
  • update forecast dialog box
  • update op resources wizard
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Criteria Page of the Update Open Plan Resources Wizard
    • Procedures
    • Select Configuration Page of the Update Open Plan Resources Wizard
    • Update Open Plan Resources
    • Update Open Plan Resources Wizard
    • Confirmation Page of the Update Open Plan Resources Wizard
    • Update Open Plan Resources
    • General Information Page of the Update Open Plan Resources Wizard
  • update totals
    • Initialize Forecast Process
    • Spreadsheet Pane of the Project View
    • Procedures
    • Confirmation Page of the Update Totals Wizard
    • Project Selection Page of the Update Totals Wizard
    • Supported Processes, Operations, and Data
    • Spreadsheet Pane Column Definitions
    • Update Totals Wizard
    • Apportionment Process
    • Update Totals
    • Running the Process or Operation
    • Process Running Page of the Update Totals Wizard
    • Process Complete Page of the Update Totals Wizard
    • Cobra Web Service
    • Process Lock
    • Process Logs Dialog Box
    • Update Totals Process
    • Update Totals
  • update totals wizard
    • Procedures
    • Confirmation Page of the Update Totals Wizard
    • Project Selection Page of the Update Totals Wizard
    • Update Totals Wizard
    • Update Totals
    • Process Running Page of the Update Totals Wizard
    • Process Complete Page of the Update Totals Wizard
    • Update Totals
  • user fields
    • Configure Cobra to Support Additional User Fields
    • Additional User Fields
  • user preferences
    • User Preferences
    • Set the Date Format
    • User Preferences Dialog Box
  • user preferences dialog box
  • validity check
    • Business Validations Page of the Validity Check Wizard
    • Validity Check Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Process Running Page of the Validity Check Wizard
    • Validations Page of the Validity Check Wizard
    • Resource and Code Assignment Validations Page of the Validity Check Wizard
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Perform a Validity Check
    • Validity Check
    • Confirmation Page of the Validity Check Wizard
    • Procedures
    • Project Selection Page of the Validity Check Wizard
  • validity check wizard
    • Business Validations Page of the Validity Check Wizard
    • Validity Check Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Process Running Page of the Validity Check Wizard
    • Validations Page of the Validity Check Wizard
    • Resource and Code Assignment Validations Page of the Validity Check Wizard
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Perform a Validity Check
    • Validity Check
    • Process Complete Page of the Validity Check Wizard
    • Confirmation Page of the Validity Check Wizard
    • Procedures
    • Project Selection Page of the Validity Check Wizard
  • vfp
  • view
    • Manage Views Dialog Box
    • Manage Views
    • Save Current View As Dialog Box
    • Save and Share View
    • Modify an Existing View
    • Create a View
    • Select Dialog Box
  • web service
    • The server was unable to process the request due to an internal error
    • Data Access Tab of the Application Preferences Dialog Box
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • Explaining the Cobra Web Service ClientAPI
    • Other Distribution Files
    • Terminate a Session
    • General Tab of the Application Preferences Dialog Box
    • The server was unable to process the request due to an internal error
    • Integration Tab of the Application Preferences Dialog Box
    • Retrieving Data
    • Supported Processes, Operations, and Data
    • The server was unable to process the request due to an internal error
    • Deploying the Cobra Web Service
    • Logging Out of the Cobra Web Service Host
    • Connecting to the Cobra Web Service Host
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • Running the Process or Operation
    • Creating Service Operations Classes
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • The server was unable to process the request due to an internal error
    • Cobra 8.4 Help System
    • Add the ClientAPI Files as Reference in Visual Studio Projects
    • Cobra Web Service
    • Reports Tab of the Application Preferences Dialog Box
  • windows authentication
    • Deploy Configuration Files for Windows Authentication with a New Installation
    • Windows Authentication
    • Configure Windows Authentication in an N-Tier Deployment
    • Windows Domain and User Name Authentication Plus Role Authentication
    • Configure Windows Authentication in an N-Tier Deployment
    • Procedures
    • Set a Maximum Number of Login Tries
    • Edit the Ideablade.Ibconfig file in the Workstation Folder (netTcpBinding)
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder
    • Connecting to the Cobra Web Service Host
    • netTcpBinding Configuration
    • Configure the Service Parameters (netTcpBinding Transport Level)
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
    • Configuring Windows Authentication Using the Configuration Files
    • Edit the Ideablade.Ibconfig file in the Server Folder
    • Procedures
    • Configure Windows Authentication in an N-Tier Deployment
    • Edit the Ideablade.Ibconfig file in the Cobra Folder
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder (netTcpBinding Transport Level)
    • Configure Windows Authentication in an N-Tier Deployment
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Transport Level)
    • netTcpBinding Transport Level Authentication
    • Set Maximum Time of Inactivity
    • Edit the Ideablade.Ibconfig file in the Server Folder (netTcpBinding)
    • Edit the Ideablade.Ibconfig file in the Workstation Folder
    • Configure the Service Parameters (wsHttpBinding)
    • Procedures
    • Turn Windows Authentication On or Off
    • Procedures
    • netTcpBinding Message Level Authentication
    • Edit the Ideablade.Ibconfig file in the Server Folder (netTcpBinding)
    • Modify the Cobra.WinUI.Exe.Config File in the Cobra Folder
    • Procedures
    • Procedures
    • Edit the Ideablade.Ibconfig file in the Workstation Folder (netTcpBinding)
    • Deploy Configuration Files for Windows Authentication with an Upgrade Installation
    • wsHttpBinding Configuration
    • Configure the Service Parameters (netTcpBinding Message Level)
  • wInsight
  • wInsight data export
    • Narrative Export Process
    • wInsight Wizard
    • Cobra to wInsight Data Export
  • wInsight database page
  • wInsight export
    • ElemLinks Section of the XML File
    • Contractors Section of the XML File
    • Calendars Section of the XML File
    • Contracts Section of the XML File
    • Supported Processes, Operations, and Data
    • NarrElemPers Section of the XML File
    • Elements Section of the XML File
    • CalendarDets Section of the XML File
    • wInsight Export Process
    • ACL Section of the XML File
    • Periods Section of the XML File
    • Cobra Web Service
    • Columns Section of the XML File
    • Cprs Section of the XML File
  • wInsight wizard
    • Performance Data Page of the wInsight Wizard
    • Configuration Security
    • Process Running Page of the wInsight Wizard
    • Work Package Codes Page of the wInsight Wizard
    • Export Structures Page of the wInsight Wizard
    • Procedures
    • Integration Tab of the Application Preferences Dialog Box
    • Miscellaneous Page of the wInsight Wizard
    • Project Page of the wInsight Wizard
    • Export Data from Cobra to wInsight
    • Access Control Page of the wInsight Wizard
    • Save and Run Page of the wInsight Wizard
    • Edit Connection Dialog Box of the wInsight Wizard
    • Project Officer Codes Page of the wInsight Wizard
    • Configuration Page of the wInsight Wizard
    • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
    • wInsight Database Page of the wInsight Wizard
    • Element of Cost Page of the wInsight Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Cost Sets Page of the wInsight Wizard
    • Link Structures Page of the wInsight Wizard
    • New Connection Dialog Box of the wInsight Wizard
    • Confirmation Page of the wInsight Wizard
    • Process Complete Page of the wInsight Wizard
  • work package
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Rename Work Package Dialog Box
    • Data Access Tab of the Application Preferences Dialog Box
    • Code Files
    • Resource Assignment Percent Complete Dialog Box
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Color Band
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Preparing the Primavera Schedule
    • Report Template Format
    • Work Package Name Page of the Replan Wizard
    • Rename a Work Package
    • Settings Page of the New Project Wizard
    • Date Selection Page of the Integration Wizard-MS Project
    • Adding a New Work Package
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Copy Work Package Dialog Box
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Perform Apportionment Mapping
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Work Package Codes Page of the wInsight Wizard
    • Validity Check Process
    • Sub-Totals Page of the Report Wizard
    • Class and Results Page of the Integration Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Actual Costs Preferences
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • New Filter Expression Dialog Box of the Report Wizard
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Calculated Fields
    • The Field Mapper
    • Assign Control Account and Work Package Structures to a Project
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Field Mapper Page of the Integration Wizard
    • Merge Sub-Projects into a New Project
    • Add a New Work Package using the Dialog Box
    • Project Selection Page of the Update Totals Wizard
    • Status Page of the Integration Wizard-Files
    • Report Categories
    • Recalc Preferences
    • Integration Tab of the Application Preferences Dialog Box
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Supported Processes, Operations, and Data
    • Update EAC Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Prompt Level Page of the Project Audit Wizard
    • Spreadsheet Pane Column Definitions
    • Display the Copy Work Package Dialog Box
    • Resources
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Calculate Progress
    • Copy a Work Package
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Control Accounts and Work Packages
    • Import File Validation
    • Filter Page of the Integration Wizard-Files
    • Project Selection Page of the Reclass Wizard
    • Notes Page of the Integration Wizard
    • New Calculated Field Dialog Box
    • Master Project Versus Individual Projects
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Custom Cost Classes
    • Calculated Field Expression Dialog Box
    • Codes and the Integration Wizard
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Lookup Dialog Box
    • Sample Earned Value Calculation
    • Integration Configuration Page of the Integration Wizard
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Control Account Fields Versus Codes
    • Calculated Fields Dialog Box
    • Move Work Package Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • Resource Assignments
    • Forecast Calculations
    • Purge Dialog Box
    • Log Change Comment Dialog Box
    • Reclass Preferences
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Reconcile Milestone Weights
    • Integration Wizard Preferences
    • Criteria Selection Page of the Recalc Wizard
    • Display the Move Work Package Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Export Structures Page of the ANSI EIA X12 Wizard
    • Options Page of the Replan Wizard
    • Change Management Tags
    • Data Import-Actual Costs
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Fields Dialog Box
    • Earned Preferences
    • Considerations When Creating Field Names
    • Status Page of the Integration Wizard
    • Resources
    • Criteria Page of the Reclass Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Advance Calendar Process
    • Filter Page of the Integration Wizard
    • Control Account and Work Package Note Tags
    • Cobra Web Service
    • Display the Rename Work Package Dialog Box
    • Process Lock
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Process Logs Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Notes Tab of the Project View
    • Data Formats
    • Options Page of the Advance Calendar Wizard
    • Column Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Date Selection Page of the Integration Wizard-Primavera
    • Included Costs Page of the Integration Wizard
    • Manual Forecasts
    • Set Up Projects and Project Baselines
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • work package manager
    • Import File Field Mapper Page of the Integration Wizard
    • Criteria Page of the Replan Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Criteria Selection Page of the Respread Wizard
    • Criteria Selection Page of the Recalc Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • General Tab of the Project View
    • Criteria Page of the Reclass Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
    • Schedule Mapping Page of the Integration Wizard-MS Project
  • xml
    • Analyze Preferences
    • Get Cobra Spread Process
    • Work Package Codes Page of the wInsight Wizard
    • Analyze Options Dialog Box
    • Report Parameters
    • Status Page of the Integration Wizard-Scheduling Tools
    • Export Structures Page of the wInsight Wizard
    • Calendars Section of the XML File
    • EarnedValues Section of the XML File
    • Integration Tab of the Application Preferences Dialog Box
    • Miscellaneous Page of the wInsight Wizard
    • Hook Program Methods
    • Create Project from Template Process
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Structures Section of the XML File
    • XML Configuration File
    • Results Tab of the Resource File Properties Dialog Box
    • Units Section of the XML File
    • wInsight Database Page of the wInsight Wizard
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • XML Configuration Object Interface
    • Process Log Viewer
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Manpowers Section of the XML File
  • xml sections
    • ElemLinks Section of the XML File
    • FutureEtcs Section of the XML File
    • Contractors Section of the XML File
    • Calendars Section of the XML File
    • Contracts Section of the XML File
    • EarnedValues Section of the XML File
    • NarrElemPers Section of the XML File
    • Structures Section of the XML File
    • Sections of the XML File
    • Units Section of the XML File
    • Elements Section of the XML File
    • CalendarDets Section of the XML File
    • ACL Section of the XML File
    • Periods Section of the XML File
    • Manpowers Section of the XML File
    • Cprs Section of the XML File
    • wInsight DTD
  • xml sections
  • zero out data
    • Project Selection Page of the Zero-Out Data Wizard
    • Procedures
    • Set Resource Values to Zero
    • Process Complete Page of the Zero-Out Data Wizard
    • Options Page of the Zero-Out Data Wizard
    • Confirmation Page of the Zero-Out Data Wizard
    • Criteria Selection Page of the Zero-Out Data Wizard
    • Zero-Out Data Wizard
    • Zero-Out Data
    • Date Range Page of the Zero-Out Data Wizard
  • zero out data wizard
    • Classes Page of the Zero-Out Data Wizard
    • Project Selection Page of the Zero-Out Data Wizard
    • Procedures
    • Set Resource Values to Zero
    • Process Complete Page of the Zero-Out Data Wizard
    • Options Page of the Zero-Out Data Wizard
    • Confirmation Page of the Zero-Out Data Wizard
    • Criteria Selection Page of the Zero-Out Data Wizard
    • Zero-Out Data Wizard
    • Zero-Out Data
    • Date Range Page of the Zero-Out Data Wizard
    • Process Running Page of the Zero-Out Data Wizard
  • zip
Glossary
  • ACO
  • Active Element
  • Activity
  • Actuals
  • ACWP
  • Alias
  • American National Standards Institute/Electronic Industries Association Standard 748
  • Apportioned Effort
  • ASC
  • Authorized Un-priced Work
  • Authorized Work
  • BAC
  • Base
  • Baseline
  • Baseline Dates
  • BCWP
  • BCWS
  • Bill of Material
  • BOP
  • Breakdown Structure
  • Budget
  • Budget Element (BE)
  • Budget Unit
  • Burden
  • C/SSR
  • CA
  • CACO
  • Calculated Field
  • Calculated Filter
  • Calendar
  • CAM
  • CBB
  • CBS
  • CFSR
  • Chart Item
  • Chart Window
  • Classes
  • Closed
  • Code Files
  • Codes
  • Column Header
  • Column Sizer
  • COM
  • Commitment
  • Compound Filter
  • Constraint
  • Contract Budget Base
  • Contract Data Requirements List
  • Contract Line Item Number
  • Contract Target Cost
  • Contract Target Price
  • Control Account
  • Control Concepts
  • Cost/Schedule Control System Criteria
  • Cost/Schedule Planning and Control Specifications
  • Cost Account
  • Cost Control System
  • Cost Reporting Set
  • Cost Set
  • Cost Variance
  • CPI
  • CPR
  • Critical Path
  • Critical Path Analysis
  • CSV Exception
  • CV
  • CV%
  • CWBS
  • DAB
  • Data Set
  • Data Source
  • DCAA
  • DCMA
  • Direct Cost
  • DoD
  • DTD
  • EAC (Estimate at Completion)
  • Early Dates
  • Earned Value
  • EDI
  • Element Filter
  • Elements
  • Element Separator
  • EOC
  • EOP
  • EQP
  • ESAR
  • Estimate Dates
  • ETC (Estimate to Complete)
  • EV
  • EVM
  • EVMIG
  • EVMS
  • EVT
  • Field Name
  • Filter
  • Filter Group
  • Filter Item
  • Focus Rectangle (wInsight)
  • Forecast
  • Forecast Dates
  • Front Loading
  • FY
  • G&A
  • GANDA
  • Gantt Chart
  • HTML
  • IBR
  • Indirect Costs
  • In Progress
  • Interactive Filter
  • Internal Replanning
  • IPD
  • IPT
  • Jet (Database)
  • JIG
  • Labor Rate Variance
  • LAN
  • Late Dates
  • Latest Revised Estimate At Completion (LRE)
  • Level of Effort (LOE)
  • Management Chart
  • Management Reserve (MR)
  • Menu Bar
  • Milestone
  • MR
  • MS
  • NASA
  • Negotiated Contract Cost
  • Network Schedule
  • OBS (Organizational Breakdown Structure)
  • ODBC
  • OLE
  • OMB
  • OPD
  • Open
  • OPP
  • OSD
  • OTB (Over Target Baseline)
  • P3
  • PCO
  • Pending Dates
  • Performance Measurement Baseline (PMB)
  • Performing Organization
  • PF
  • Planned
  • Planned Value
  • PMJEG
  • PMR
  • PMT
  • PP
  • Price Variance
  • Prime (dollars)
  • Project
  • RAM
  • Range Filter
  • RBS (Resource Breakdown Structure)
  • Re-planning
  • Reprogramming
  • Resource
  • Result
  • Result Code
  • RFP
  • Rollup
  • Row Header
  • RTF
  • Rubber Baselining
  • SAR
  • Schedule
  • Scheduled Dates
  • Schedule Performance Index
  • Schedule Variance
  • Segment Separator
  • SMS
  • SPI
  • Standard EAC Formula
  • SV
  • SV%
  • TAB
  • TC
  • TCPI-BAC
  • TCPI-EAC
  • Toggle Field
  • Toolbar
  • Tool Tip
  • Transfer File
  • UB
  • UserVACTr
  • VAC
  • VAC%
  • VACTr
  • VAN
  • VAR
  • WBS (Work Breakdown Structure)
  • Wildcard Filter
  • Window Pane Sizer
  • Workspace
  • WP (Work Package)
Search Results
No search has been performed.

Send a Message to Users

Use the EPM SA to send a message to any users, or all users logged onto Cobra.

To send a message to users:

  1. Log onto EPM SA and click Cobra in the list of products in the Explorer pane.
  2. In the Users pane, select the recipient or recipients of the message and click Send Message.
Parent Topic: Procedures
How to...
Log Onto Cobra
Change Your Password
Learn more about...
EPM Security Administrator Functions
Windows Authentication
  • Copyright © Deltek Inc. All rights reserved.

  • Powered by Suite Solutions